An [[EfW]] facility based upon conventional combustion technology that reached financial close in July 2022. [[South Clyde Energy Centre, Bogmoor Road, Glasgow|South Clyde]] has a forecast operational capacity of 350,000 tonnes per annum. The project is owned 50/50 by [[Macquarie Asset Management]]'s [[Green Investment Group]] and [[Fortum Glasgow]] a subsidiary of [[Fortum Oyj]]<ref>[https://www.greeninvestmentgroup.com/en/news/2022/macquarie-asset-managements-green-investment-group-and-fortum-partner-on-the-south-clyde-energy-from-waste-plant.html Macquarie Media release 22nd July 2022]</ref> .{{EfWTemplate|EPR={{#var:epr}}|id=127}}
An [[EfW]] facility based upon conventional combustion technology that reached financial close in July 2022. [[South Clyde Energy Centre, Bogmoor Road, Glasgow|South Clyde]] has a forecast operational capacity of 350,000 tonnes per annum. The project was owned 50/50 by [[Macquarie Asset Management]]'s [[Green Investment Group]] (who sold their share to [[Gren]] in June 2024<ref>https://gren.com/uk/news/gren-acquires-stake-in-scottish-energy-from-waste-facility/</ref>) and [[Fortum Glasgow]] a subsidiary of [[Fortum Oyj]]<ref>[https://www.greeninvestmentgroup.com/en/news/2022/macquarie-asset-managements-green-investment-group-and-fortum-partner-on-the-south-clyde-energy-from-waste-plant.html Macquarie Media release 22nd July 2022]</ref> .{{EfWTemplate|EPR={{#var:epr}}|id=127}}
[[File:Screenshot 2022-07-22 102354.png|300px|left|South Clyde Energy Centre, all rights reserved projectscot.com]]__TOC__<br clear='left' />
[[File:Screenshot 2022-07-22 102354.png|300px|left|South Clyde Energy Centre, all rights reserved projectscot.com]]__TOC__<br clear='left' />


==Summary==
==Summary==
An [[EfW]] facility based upon conventional combustion technology that reached financial close in July 2022. [[South Clyde Energy Centre, Bogmoor Road, Glasgow|South Clyde]] has a forecast operational capacity of 350,000 tonnes per annum, with a capability of a maximum of 385,440 tonnes. The project is owned 50/50 by [[Macquarie Asset Management]]'s [[Green Investment Group]] and [[Fortum Glasgow]] a subsidiary of [[Fortum Oyj]].   
An [[EfW]] facility based upon conventional combustion technology that reached financial close in July 2022. [[South Clyde Energy Centre, Bogmoor Road, Glasgow|South Clyde]] has a forecast operational capacity of 350,000 tonnes per annum, with a capability of a maximum of 385,440 tonnes. The project is owned 50/50 by [[Gren]] and [[Fortum Glasgow]] a subsidiary of [[Fortum Oyj]].   


==Technology==
==Technology==

Latest revision as of 05:26, 11 June 2024

An EfW facility based upon conventional combustion technology that reached financial close in July 2022. South Clyde has a forecast operational capacity of 350,000 tonnes per annum. The project was owned 50/50 by Macquarie Asset Management's Green Investment Group (who sold their share to Gren in June 2024[1]) and Fortum Glasgow a subsidiary of Fortum Oyj[2] .

South Clyde Energy Centre, Bogmoor Road, Glasgow
Under Construction
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence PPC/A/1168354
Operator Fortum Glasgow
Region Scotland
Operational Capacity 385ktpa
Is site R1? No
When was R1 Granted?
What was the R1 value 0.00
Electrical Capacity 40.00MWe
Number of Lines 0
Number of Turbines 0
CHP Yes
Technology Approach EfW Incineration
Funding Type [[]]

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN

South Clyde Energy Centre, all rights reserved projectscot.com
South Clyde Energy Centre, all rights reserved projectscot.com


Summary

An EfW facility based upon conventional combustion technology that reached financial close in July 2022. South Clyde has a forecast operational capacity of 350,000 tonnes per annum, with a capability of a maximum of 385,440 tonnes. The project is owned 50/50 by Gren and Fortum Glasgow a subsidiary of Fortum Oyj.

Technology

The plant technology will comprise a single line of a standard moving grate technology, processing around 44 tonnes per hour of waste and producing super-heated steam and 40MWe with a net export of 35MWe and 12MWth of heat[3]. The grate and boiler was reported in July 2022 as being delivered by Hitachi Zosen Inova Steinmüller[4].

Construction

The plant will be constructed under an EPCM arrangement with AFRY in co-operation with AFRY Solutions UK Ltd and AFRY Finland Oy.

Waste Input

The plant is intended to run on residual Household Waste and Commercial Waste with NCV of between 8 to 15MJ/kg (with an average of 10MJ/kg) sourced from within Glasgow City and within the Clyde Valley[5]. Long term contracts were announced with Beauparc, Enva and Geminor and one other unnamed business in November 2022[6]