Peterborough EfW: Difference between revisions
Imported from text file |
Arctellion (talk | contribs) No edit summary |
||
(8 intermediate revisions by 4 users not shown) | |||
Line 1: | Line 1: | ||
[[Category:EfW Plants]][[ | {{#vardefine:epr|NP3638ZS}}[[Category:EfW Plants]] | ||
{{EfWTemplate|EPR= | An [[EfW]] facility based upon conventional combustion technology which is considered an [[ERF]] as a result of having [[R1]] status. Peterborough has permitted operational capacity of 85,000 tonnes per annum, operated and owned by [[Viridor]]. Delivery of waste is by road and the facility processes primarily residual [[Household Waste]] <ref>[https://www.viridor.co.uk/energy/energy-recovery-facilities/peterborough-erf/ Viridor Website]</ref>.{{EfWTemplate|EPR={{#var:epr}}|id=40}}[[File:Viridor Peterborough.png|350px|left]]__TOC__<br clear='left' /> | ||
==Summary== | ==Summary== | ||
An [[EfW]] facility based upon conventional combustion technology which is considered an [[ERF]] as a result of having [[R1]] status. Peterborough has permitted operational capacity of 85,000 tonnes per annum, operated and owned by [[Viridor]]. Delivery of waste is by road and the facility processes primarily residual [[Household Waste]] <ref>[https://www.viridor.co.uk/energy/energy-recovery-facilities/peterborough-erf/ Viridor Website]</ref>. | |||
==History== | ==History== | ||
The Peterborough facility was built to primarily service residual [[Household Waste]] from [[Peterborough City Council|Peterborough]] under a 30 year [[PPP]] contract. It is located close to Peterborough Power Station in Fengate, and commenced operation in December 2015. | |||
==Plant== | ==Plant== | ||
Built by a JV between [[Interserve]] and [[Babcox & Wilcox Volund A/S]] as a turnkey [[EPC]] contract, which started in summer 2013 and was delivered in December 2015 at a reported <ref>[http://haggaiprojects.co.uk/efw-projects/4594784023 Haggai Website]</ref> £74m capital cost. | |||
The plant comprises one line via standard combustion B&W Volund proprietary Dynagrate technology, generating super-heated steam, and is configured to run on primarily residual [[Household Waste]] and similar residual [[Commercial Waste]] with design capability up to 85,000 tonnes per annum and generating 7.25MWe based on [[CV]] of 9MJ/kg <ref>[http://www.volund.dk/Waste_to_Energy/References/Peterborough_UK Volund Website]</ref>. | |||
== | {{EfWLAData|EPR={{#var: epr}}}} | ||
{{EAIn|EPR={{#var: epr}}}} | |||
==References== | ==References== | ||
<references /> | <references /> |