Canford: Difference between revisions

Northern Chick (talk | contribs)
Arctellion (talk | contribs)
No edit summary
 
(4 intermediate revisions by 3 users not shown)
Line 1: Line 1:
[[File:Canford.png|360px|left|Artist Impression of Canford Gasifiaction Facility]]
{{#vardefine:epr|Tbc16}}[[Category:EfW Plants]]
[[Category:EfW Plants]][[Category:Tonnage & Waste Types]][[Category:Technologies & Solutions]]
An [[EfW]] facility based upon [[Gasification]] technology. Originally owned and developed by [[New Earth Solutions]] as part of a wider development at the Canford site in Dorset, it was granted planning consent in 2013 and was intended to be operational by 2015, generating 10MWe. The adjacent [[MBT]] plant is operational but no construction is understood to have progressed on the [[EfW]] facility.
{{EfWTemplate|EPR=Tbc#16|id=63}}
{{EfWTemplate|EPR={{#var:epr}}|id=63}}[[File:Canford.png|360px|left|Artist Impression of Canford Gasifiaction Facility]]__TOC__<br clear='left' />
 
==Summary==
==Summary==
An [[EfW]] facility based upon [[Gasification]] technology. Originally owned and developed by [[New Earth Solutions]] as part of a wider development at the Canford site in Dorset, it was granted planning consent in 2013 and was intended to be operational by 2015, generating 10MWe. The adjacent [[MBT]] plant is operational and so this plant has been classified as under construction, but no construction is understood to have progressed on the site.
An [[EfW]] facility based upon [[Gasification]] technology. Originally owned and developed by [[New Earth Solutions]] as part of a wider development at the Canford site in Dorset, it was granted planning consent in 2013 and was intended to be operational by 2015, generating 10MWe. The adjacent [[MBT]] plant is operational but no construction is understood to have progressed on the [[EfW]] facility.


==Technology==
==Technology==
The plant was designed based on the [[New Earth Solutions Technology]] or [[NEST]] that was utilized in Avonmouth but was mothballed after operational difficulties and with the business going into administration in 2016<ref>[https://www.letsrecycle.com/news/latest-news/breakdown-of-talks-lands-new-earth-in-administration/ Letsreccyel Article]</ref>.
The plant was designed based on the [[New Earth Solutions Technology]] or [[NEST]] that was utilized in Avonmouth but was mothballed after operational difficulties and with the business going into administration in 2016<ref>[https://www.letsrecycle.com/news/latest-news/breakdown-of-talks-lands-new-earth-in-administration/ LetsRecycle Article]</ref>.


==Construction==
==Construction==