Canford: Difference between revisions

Bin52 (talk | contribs)
m minor text change
Arctellion (talk | contribs)
No edit summary
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
[[File:Canford.png|360px|left|Artist Impression of Canford Gasifiaction Facility]]
{{#vardefine:epr|Tbc16}}[[Category:EfW Plants]]
[[Category:EfW Plants]]
An [[EfW]] facility based upon [[Gasification]] technology. Originally owned and developed by [[New Earth Solutions]] as part of a wider development at the Canford site in Dorset, it was granted planning consent in 2013 and was intended to be operational by 2015, generating 10MWe. The adjacent [[MBT]] plant is operational but no construction is understood to have progressed on the [[EfW]] facility.
{{EfWTemplate|EPR=Tbc#16|id=63}}
{{EfWTemplate|EPR={{#var:epr}}|id=63}}[[File:Canford.png|360px|left|Artist Impression of Canford Gasifiaction Facility]]__TOC__<br clear='left' />
 
==Summary==
==Summary==
An [[EfW]] facility based upon [[Gasification]] technology. Originally owned and developed by [[New Earth Solutions]] as part of a wider development at the Canford site in Dorset, it was granted planning consent in 2013 and was intended to be operational by 2015, generating 10MWe. The adjacent [[MBT]] plant is operational but no construction is understood to have progressed on the [[EfW]] facility.
An [[EfW]] facility based upon [[Gasification]] technology. Originally owned and developed by [[New Earth Solutions]] as part of a wider development at the Canford site in Dorset, it was granted planning consent in 2013 and was intended to be operational by 2015, generating 10MWe. The adjacent [[MBT]] plant is operational but no construction is understood to have progressed on the [[EfW]] facility.