==Summary==
==Summary==
[[Dunbar Landfill Site]] was developed by [[Blue Circle Waste Management]] and then [[Viridor]] from the early 1990s onwards. Blue Circle Waste Management were acquired by Pennon in 1995 and were renamed Haul Waste Disposal thereafter, subsequently becoming known as Viridor in 1999.
[[Viridor Waste,Dunbar L/F,Oxwell Mains,Dunbar | Dunbar landfill]] was developed by [[Blue Circle Waste Management]] and then [[Viridor]] from the early 1990s onwards. Blue Circle Waste Management were acquired by Pennon in 1995 and were renamed Haul Waste Disposal thereafter, subsequently becoming known as Viridor in 1999.
The site comprises a modern [[landfill]] engineered to Landfill Directive standards.
The site comprises a modern [[landfill]] engineered to Landfill Directive standards.


==History==
==History==
Dunbar landfill was developed by Blue Circle Waste Management commencing in the early-1990s. It is located to the 4 km to the south-east of Dunbar, East Lothian. It adjoins a cement works and quarry operated by Lafarge (formerly Blue Circle Cement). It is located between the A1 trunk road and the East Coast mainline railway and is within 500m of the coast.
[[Viridor Waste,Dunbar L/F,Oxwell Mains,Dunbar | Dunbar landfill]] was developed by [[Blue Circle Waste Management]] commencing in the early-1990s. It is located to the 4 km to the south-east of Dunbar, East Lothian. It adjoins a cement works and quarry operated by Lafarge (formerly Blue Circle Cement). It is located between the A1 trunk road and the East Coast mainline railway and is within 500m of the coast.


The site was previously a quarry producing feedstock for the adjoining cement works.
The site was previously a quarry producing feedstock for the adjoining cement works.
Line 33: Line 33:
Elsewhere within the site complex, Viridor have also developed several other waste processing facilities, including an internal waste transfer station (to enable road going vehicles to avoid driving on to the waste mass and also to act as a buffer store during windy weather conditions) and [[Dunbar EfW (Oxwellmains EfW)]], which will eventually take over for the landfill when it closes. The site is also rail-connected and wastes for landfill disposal were received from [[Edinburgh City Council]] by rail until the related contract ended in 2018/9.
Elsewhere within the site complex, Viridor have also developed several other waste processing facilities, including an internal waste transfer station (to enable road going vehicles to avoid driving on to the waste mass and also to act as a buffer store during windy weather conditions) and [[Dunbar EfW (Oxwellmains EfW)]], which will eventually take over for the landfill when it closes. The site is also rail-connected and wastes for landfill disposal were received from [[Edinburgh City Council]] by rail until the related contract ended in 2018/9.


==Tonnage Handled==
Only Waste Codes receiving over 5,000t are shown.
{{NHLFTable|Permit=PPC/E/0020058}}
{{NHLFTable|Permit=PPC/E/0020058}}


==References==