Blackburn Meadows Renewable Energy Plant: Difference between revisions

From Wikiwaste
Bin52 (talk | contribs)
m Bin52 moved page Blackburn Meadows to Blackburn Meadows Renewable Energy Plant: updated database
Bin52 (talk | contribs)
No edit summary
 
(2 intermediate revisions by 2 users not shown)
Line 1: Line 1:
A Biomass Waste [[Combined Heat and Power | combined heat and power]] (CHP) EFW facility [[Blackburn Meadows Renewable Energy Plant]] uses a feedstock of [[Wood Waste]] to generate 29 MWe and up to 25 MWth. The facility is located on the site of the former Tinsley cooling towers in Sheffield, and the [[Wood Waste]] is sourced locally within a 50-mile of the plant.
[[Category:Biomass EfW Plants]]{{#vardefine: epr|LP3131TA}}
[[Category:Biomass EfW Plants]]{{#vardefine: epr|LP3131TA}}
{{BiomassPlant|NAME=Blackburn Meadows|id=15|EPR={{#var: epr}}}}
{{BiomassPlant|NAME=Blackburn Meadows Renewable Energy Plant|id=15|EPR={{#var: epr}}}}
[[File:Blackburn-meadows--sheffield 06.jpg|400px|left|Blackburn Meadows. BDP, 2018.]]__TOC__
[[File:Blackburn-meadows--sheffield 06.jpg|400px|left|Blackburn Meadows. BDP, 2018.]]__TOC__
<br clear='left'/>
<br clear='left'/>
Line 6: Line 7:


==Summary==
==Summary==
A Biomass Waste [[Combined Heat and Power | combined heat and power]] (CHP) EFW facility utilising a feedstock of [[Wood Waste]] to generate 29 MWe and up to 25 MWth. The facility is located on the site of the former Tinsley cooling towers in Sheffield, and the [[Wood Waste]] is sourced locally within a 50-mile of the plant. The generated electricity is exported to the national grid and the heat is supplied as hot water to local businesses through a district heating network, including the Sheffield Arena and Forgemaster Steel Works<ref name="ref1" >E.ON, 2020. [https://www.eonenergy.com/business/why-eon/case-studies/blackburn-meadows.html Blackburn Meadows | Business Case Studies | E.ON. Online. Eonenergy.com. [Accessed 6 April 2020]].</ref>.
A Biomass Waste [[Combined Heat and Power | combined heat and power]] (CHP) EFW facility [[Blackburn Meadows Renewable Energy Plant]] uses a feedstock of [[Wood Waste]] to generate 29 MWe and up to 25 MWth. The facility is located on the site of the former Tinsley cooling towers in Sheffield, and the [[Wood Waste]] is sourced locally within a 50-mile of the plant. The generated electricity is exported to the national grid and the heat is supplied as hot water to local businesses through a district heating network, including the Sheffield Arena and Forgemaster Steel Works<ref name="ref1" >E.ON, 2020. [https://www.eonenergy.com/business/why-eon/case-studies/blackburn-meadows.html Blackburn Meadows | Business Case Studies | E.ON. Online. Eonenergy.com. [Accessed 6 April 2020]].</ref>.


The Blackburn Meadows facility is operated by [[E.ON Energy]] and became operational in 2015 after beginning construction in 2011<ref name="ref2" >BDP., 2018. [http://www.bdp.com/en/projects/a-e/blackburn-meadows-biomass-plant/ Blackburn Meadows Biomass Plant - BDP.Com. Online. Bdp.com. [Accessed 6 April 2020]].</ref>.
The Blackburn Meadows facility is operated by [[E.ON Energy]] and became operational in 2015 after beginning construction in 2011<ref name="ref2" >BDP., 2018. [http://www.bdp.com/en/projects/a-e/blackburn-meadows-biomass-plant/ Blackburn Meadows Biomass Plant - BDP.Com. Online. Bdp.com. [Accessed 6 April 2020]].</ref>.
Line 17: Line 18:
The facility cost £120 million to develop<ref>Bioenergy Insight, 2014. [https://www.bioenergy-news.com/news/e-ons-blackburn-meadows-biomass-plant-generates-electricity/ E.ON's Blackburn Meadows Biomass Plant Generates Electricity. Online. Bioenergy Insight. [Accessed 6 April 2020]].</ref>. It has an [[Andritz]] boiler.
The facility cost £120 million to develop<ref>Bioenergy Insight, 2014. [https://www.bioenergy-news.com/news/e-ons-blackburn-meadows-biomass-plant-generates-electricity/ E.ON's Blackburn Meadows Biomass Plant Generates Electricity. Online. Bioenergy Insight. [Accessed 6 April 2020]].</ref>. It has an [[Andritz]] boiler.


==Tonnage Input/Fuel==
{{BioSustain|EPR={{#var: epr}}}}
The tonnage received by the plant in the most recent [[Annual Sustainability Report]] for 2018-19<ref>[https://www.ofgem.gov.uk/publications-and-updates/biomass-sustainability-dataset-2018-19 Biomass Sustainability Dataset 2018-19]</ref> was reported by [[Ofgem]] as follows:
{{EAIn|EPR={{#var: epr}}}}
{| class="wikitable"
|-
! Biomass !! Tonnage (2018-19)
|-
| [[Wood Waste]] || '''208,327'''
|-
| Other || 0
|-
| Total||208,327
|}
The [[Wood Waste]] is received from a variety of sources. The [[Wood Waste]] tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the [[EA]] statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018) and was '''214,135''' tonnes.
 
==References==
==References==
<references/>
<references/>

Latest revision as of 06:50, 15 August 2022

A Biomass Waste combined heat and power (CHP) EFW facility Blackburn Meadows Renewable Energy Plant uses a feedstock of Wood Waste to generate 29 MWe and up to 25 MWth. The facility is located on the site of the former Tinsley cooling towers in Sheffield, and the Wood Waste is sourced locally within a 50-mile of the plant.


Blackburn Meadows Renewable Energy Plant
Operational
Site Location
Site Location

See Biomass EfW → page for a larger UK Wide map.

Operator E-On UK Blackburn Meados Ltd
Capacity 30 MWe
Feedstock Waste Wood
EPR (Waste Licence) LP3131TA
ROC Yes
CfD
CHP Yes

Operators Annual Report


Input Data

Year Wood Litter RDF Other Total
2017 202183 0 0 0 202183
2018 214135 0 0 0 214135
2019 200098 0 0 0 200098
2020 149665 0 0 0 149665
2021 207643 0 0 0 207643
2022 199548 0 0 0 199548


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN
2017 4500 2.23% 5265 2.60%
2018 3636 1.70% 5324 2.49%
2019 4463 2.23% 5116 2.56%
2020 3580 2.39% 3968 2.65%
2021 4084 1.97% 5267 2.54%
2022 4669 2.34% 5207 2.61%

Blackburn Meadows. BDP, 2018.
Blackburn Meadows. BDP, 2018.


[1]

Summary

A Biomass Waste combined heat and power (CHP) EFW facility Blackburn Meadows Renewable Energy Plant uses a feedstock of Wood Waste to generate 29 MWe and up to 25 MWth. The facility is located on the site of the former Tinsley cooling towers in Sheffield, and the Wood Waste is sourced locally within a 50-mile of the plant. The generated electricity is exported to the national grid and the heat is supplied as hot water to local businesses through a district heating network, including the Sheffield Arena and Forgemaster Steel Works[2].

The Blackburn Meadows facility is operated by E.ON Energy and became operational in 2015 after beginning construction in 2011[3].

Plant

The facility had a 10 MW battery installed after it was awarded a contract to support the national grid’s stability requirements, which became operational in 2017[2].

The unique architectural work was undertaken by BDP, which includes an orange translucent clad boiler house that is internally illuminated[3].

The facility cost £120 million to develop[4]. It has an Andritz boiler.

Annual Sustainability Tonnage Input/Fuel

The tonnage[5] received by the plant in the most recent Annual Sustainability Report and for the previous 3 years for 2020/21 was reported by Ofgem as below[6]:

Year Waste Wood (m3) Waste Wood (t) Straw Miscanthus Arboricultrual Waste Sawmill Residue Foresrty Residue Round Wood Short Rotation Coppice MBM Other Material
2020/21 0 142827 0 0 0 0 0 0 0 0 0
2019/20 0 203490 0 0 0 0 0 0 0 0 0
2018/19 0 208327 0 0 0 0 0 0 0 0 0
2017/18 0 0 0 0 0 0 0 0 0 0 0

The query SELECT "updated" FROM "db_ea"."ea_ew_in" WHERE epr='LP3131TA' LIMIT 1 is invalid (Error : SSL SYSCALL error: EOF detected

Function: EDConnectorRdbms::fetch Query: SELECT "updated" FROM "db_ea"."ea_ew_in" WHERE epr='LP3131TA' LIMIT 1 ).Error: Could not connect to database (Cannot access the database: Unable to connect to PostgreSQL server: connection to server at "10.106.0.2", port 5432 failed: FATAL: the database system is in recovery mode).Error: Could not connect to database (Cannot access the database: Unable to connect to PostgreSQL server: connection to server at "10.106.0.2", port 5432 failed: FATAL: the database system is in recovery mode).

Waste Tonnage, By Origin

The table shows a list of the Waste for the Permit LP3131TA, that has arrived into sites as reported to the Regulator and then publicised in their reported statistics. The Data used is from the most recent returns. The total reported tonnage arriving at the site was: Expression error: Unexpected < operator.t.

Where this tonnage exceeds that reported in year of the corresponding annual report, this may be due to the following reasons:

  • Tonnage may have been received but not incinerated, i.e. the material is held pending incineration (the operator return to the EA reports as received whereas the annual report focuses on when the waste is incinerated.)
  • Material may have been received into the site but treated in some other way than incineration.
  • Material may have been received on the but transferred out of site for disposal/treatment at another site rather than incineration on the site.
EWC Code Origin of Waste Tonnes In


References