BSW Timber: Difference between revisions
No edit summary |
No edit summary |
||
(2 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
[[Category:Biomass EfW Plants]] | A [[Biomass]] Waste [[Combined Heat and Power | combined heat and power]] (CHP) EFW facility [[BSW Timber]] utilises [[Wood Waste]] to generate 3.2 MW. The facility is located at the [[BSW]] sawmill in Carlisle. | ||
{{BiomassPlant|NAME=BSW Timber|id=17 | [[Category:Biomass EfW Plants]]{{#vardefine: epr|1448}} | ||
{{BiomassPlant|NAME=BSW Timber|id=17|EPR={{#var: epr}}}} | |||
[[File:BSW Timber.png|400px|left|BSW Timber Biomass EfW. BSW Timber, 2016.]]__TOC__ | [[File:BSW Timber.png|400px|left|BSW Timber Biomass EfW. BSW Timber, 2016.]]__TOC__ | ||
<br clear='left'/> | <br clear='left'/> | ||
Line 6: | Line 7: | ||
==Summary== | ==Summary== | ||
A [[Biomass]] Waste [[Combined Heat and Power | combined heat and power]] (CHP) EFW facility | A [[Biomass]] Waste [[Combined Heat and Power | combined heat and power]] (CHP) EFW facility [[BSW Timber]] utilises [[Wood Waste]] to generate 3.2 MW. The facility is located at the [[BSW]] sawmill in Carlisle. The electricity generated is used in the sawmill production process and the heat is utilised in the kilns, treatment plant, and offices<ref name="ref1" >BSW Timber, 2016. [https://www.bsw.co.uk/news/articles/244/bsw-timber-fires-up-2.5m-biomass-boiler-at-carlisle-sawmill BSW Timber Fires Up £2.5M Biomass Boiler At Carlisle Sawmill. BSW Timber. Online. Bsw.co.uk.[Accessed 6 April 2020]].</ref>. | ||
This facility was developed in partnership with [[Dallol Energy]]<ref name="ref1" />, and became operational in 2016<ref> Les Prom, 2016. [https://www.lesprom.com/en/news/BSW_Timber_commissions_biomass_boiler_at_its_Carlisle_sawmill_in_the_UK_74647/ BSW Timber Commissions Biomass Boiler At Its Carlisle Sawmill In The UK. Online. Lesprom.com. [Accessed 6 April 2020]].</ref>. | This facility was developed in partnership with [[Dallol Energy]]<ref name="ref1" />, and became operational in 2016<ref> Les Prom, 2016. [https://www.lesprom.com/en/news/BSW_Timber_commissions_biomass_boiler_at_its_Carlisle_sawmill_in_the_UK_74647/ BSW Timber Commissions Biomass Boiler At Its Carlisle Sawmill In The UK. Online. Lesprom.com. [Accessed 6 April 2020]].</ref>. | ||
Line 13: | Line 14: | ||
The facility cost £2.5 million to develop and is part of BSW’s £11 million investment programme for biomass energy facilities at its mills in the UK and Latvia<ref name="ref1" />. | The facility cost £2.5 million to develop and is part of BSW’s £11 million investment programme for biomass energy facilities at its mills in the UK and Latvia<ref name="ref1" />. | ||
== | {{BioSustain|EPR={{#var: epr}}}} | ||
{{EAIn|EPR={{#var: epr}}}} | |||
==References== | ==References== | ||
<references/> | <references/> |