BSW Timber: Difference between revisions

Bin52 (talk | contribs)
add templates
Bin52 (talk | contribs)
No edit summary
 
Line 1: Line 1:
A [[Biomass]] Waste [[Combined Heat and Power | combined heat and power]] (CHP) EFW facility [[BSW Timber]] utilises [[Wood Waste]] to generate 3.2 MW. The facility is located at the [[BSW]] sawmill in Carlisle.
[[Category:Biomass EfW Plants]]{{#vardefine: epr|1448}}
[[Category:Biomass EfW Plants]]{{#vardefine: epr|1448}}
{{BiomassPlant|NAME=BSW Timber|id=17|EPR={{#var: epr}}}}
{{BiomassPlant|NAME=BSW Timber|id=17|EPR={{#var: epr}}}}
Line 6: Line 7:


==Summary==
==Summary==
A [[Biomass]] Waste [[Combined Heat and Power | combined heat and power]] (CHP) EFW facility utilising [[Wood Waste]] to generate 3.2 MW. The facility is located at the [[BSW]] sawmill in Carlisle. The electricity generated is used in the sawmill production process and the heat is utilised in the kilns, treatment plant, and offices<ref name="ref1" >BSW Timber, 2016. [https://www.bsw.co.uk/news/articles/244/bsw-timber-fires-up-2.5m-biomass-boiler-at-carlisle-sawmill BSW Timber Fires Up £2.5M Biomass Boiler At Carlisle Sawmill. BSW Timber. Online. Bsw.co.uk.[Accessed 6 April 2020]].</ref>.
A [[Biomass]] Waste [[Combined Heat and Power | combined heat and power]] (CHP) EFW facility [[BSW Timber]] utilises [[Wood Waste]] to generate 3.2 MW. The facility is located at the [[BSW]] sawmill in Carlisle. The electricity generated is used in the sawmill production process and the heat is utilised in the kilns, treatment plant, and offices<ref name="ref1" >BSW Timber, 2016. [https://www.bsw.co.uk/news/articles/244/bsw-timber-fires-up-2.5m-biomass-boiler-at-carlisle-sawmill BSW Timber Fires Up £2.5M Biomass Boiler At Carlisle Sawmill. BSW Timber. Online. Bsw.co.uk.[Accessed 6 April 2020]].</ref>.


This facility was developed in partnership with [[Dallol Energy]]<ref name="ref1" />, and became operational in 2016<ref> Les Prom, 2016. [https://www.lesprom.com/en/news/BSW_Timber_commissions_biomass_boiler_at_its_Carlisle_sawmill_in_the_UK_74647/ BSW Timber Commissions Biomass Boiler At Its Carlisle Sawmill In The UK. Online. Lesprom.com. [Accessed 6 April 2020]].</ref>.
This facility was developed in partnership with [[Dallol Energy]]<ref name="ref1" />, and became operational in 2016<ref> Les Prom, 2016. [https://www.lesprom.com/en/news/BSW_Timber_commissions_biomass_boiler_at_its_Carlisle_sawmill_in_the_UK_74647/ BSW Timber Commissions Biomass Boiler At Its Carlisle Sawmill In The UK. Online. Lesprom.com. [Accessed 6 April 2020]].</ref>.