BSW Timber: Difference between revisions

no edit summary
(Created page with "Category:Biomass EfW Plants {{BiomassPlant|NAME=BSW Timber|id=17}} 400px|left|BSW Timber Biomass EfW. BSW Timber, 2016. ==Summary== A Bi...")
 
No edit summary
 
(6 intermediate revisions by 2 users not shown)
Line 1: Line 1:
[[Category:Biomass EfW Plants]]
A [[Biomass]] Waste [[Combined Heat and Power | combined heat and power]] (CHP) EFW facility [[BSW Timber]] utilises [[Wood Waste]] to generate 3.2 MW. The facility is located at the [[BSW]] sawmill in Carlisle.
{{BiomassPlant|NAME=BSW Timber|id=17}}
[[Category:Biomass EfW Plants]]{{#vardefine: epr|1448}}
[[File:BSW Timber.png|400px|left|BSW Timber Biomass EfW. BSW Timber, 2016.]]
{{BiomassPlant|NAME=BSW Timber|id=17|EPR={{#var: epr}}}}
 
[[File:BSW Timber.png|400px|left|BSW Timber Biomass EfW. BSW Timber, 2016.]]__TOC__
 
<br clear='left'/>
 
<ref>[https://www.bsw.co.uk/news/articles/244/bsw-timber-fires-up-2.5m-biomass-boiler-at-carlisle-sawmill/ BSW Timber Biomass Site Photo]All Rights Reserved</ref>
 
 
 
 
 
 


==Summary==
==Summary==
A [[Biomass]] Waste [[Combined Heat and Power | combined heat and power]] (CHP) EFW facility [[BSW Timber]] utilises [[Wood Waste]] to generate 3.2 MW. The facility is located at the [[BSW]] sawmill in Carlisle. The electricity generated is used in the sawmill production process and the heat is utilised in the kilns, treatment plant, and offices<ref name="ref1" >BSW Timber, 2016. [https://www.bsw.co.uk/news/articles/244/bsw-timber-fires-up-2.5m-biomass-boiler-at-carlisle-sawmill BSW Timber Fires Up £2.5M Biomass Boiler At Carlisle Sawmill. BSW Timber. Online. Bsw.co.uk.[Accessed 6 April 2020]].</ref>.


A Biomass Waste [[Combined Heat and Power | combined heat and power]] (CHP) EFW facility utilising a feedstock of [[Wood Waste]] to generate 3.2 MW. The facility is located at the BSW sawmill in Carlisle. The electricity generated is used in the sawmill production process and the heat is utilised in the kilns, treatment plant, and offices<ref name="ref1" >BSW Timber, 2016. [https://www.bsw.co.uk/news/articles/244/bsw-timber-fires-up-2.5m-biomass-boiler-at-carlisle-sawmill BSW Timber Fires Up £2.5M Biomass Boiler At Carlisle Sawmill. BSW Timber. Online. Bsw.co.uk.[Accessed 6 April 2020].]</ref>.
This facility was developed in partnership with [[Dallol Energy]]<ref name="ref1" />, and became operational in 2016<ref> Les Prom, 2016. [https://www.lesprom.com/en/news/BSW_Timber_commissions_biomass_boiler_at_its_Carlisle_sawmill_in_the_UK_74647/ BSW Timber Commissions Biomass Boiler At Its Carlisle Sawmill In The UK. Online. Lesprom.com. [Accessed 6 April 2020]].</ref>.
 
This facility was developed in partnership with Dallol Energy<ref name="ref1" />, and became operational in 2016<ref> Les Prom, 2016. [https://www.lesprom.com/en/news/BSW_Timber_commissions_biomass_boiler_at_its_Carlisle_sawmill_in_the_UK_74647/ BSW Timber Commissions Biomass Boiler At Its Carlisle Sawmill In The UK. Online. Lesprom.com. [Accessed 6 April 2020].</ref>.


==Plant==
==Plant==
The facility cost £2.5 million to develop and is part of BSW’s £11 million investment programme for biomass energy facilities at its mills in the UK and Latvia<ref name="ref1" />.
The facility cost £2.5 million to develop and is part of BSW’s £11 million investment programme for biomass energy facilities at its mills in the UK and Latvia<ref name="ref1" />.


==Local Authority Users==
{{BioSustain|EPR={{#var: epr}}}}
 
{{EAIn|EPR={{#var: epr}}}}


==References==
==References==
<references/>
<references/>
banneredit
3,643

edits