Goosey Lodge Power Plant: Difference between revisions
No edit summary |
|||
(15 intermediate revisions by 3 users not shown) | |||
Line 1: | Line 1: | ||
[[Category:Biomass EfW Plants]] | [[Goosey Lodge Power Plant]] is a [[Biomass Waste EFW]] generating 16MWe to the grid. It is located in Wymington near Rushton in Northamptonshire. | ||
{{BiomassPlant|NAME=Goosey Lodge|id=38}} | [[Category:Biomass EfW Plants]]{{#vardefine: epr|NP3338SZ}} | ||
{{BiomassPlant|NAME=Goosey Lodge Power Plant|id=38|EPR={{#var: epr}}}} | |||
[[File:Goosey Lodge.jpg|400px|left|Goosey Lodge]]<ref name="GOO">[http://www.ancillarycomponents.co.uk/wykinc.html/ Ancillary Components]All Rights Reserved</ref>__TOC__ | |||
<br clear="left"/> | |||
==Summary== | ==Summary== | ||
Goosey Lodge is a | [[Goosey Lodge Power Plant]] is a [[Biomass Waste EFW]] generating 16MWe to the grid. It is located in Wymington near Rushton in Northamptonshire. The plant is able to process a wide range of feedstock including solid and liquid [[Animal By-product Material]] and [[Wood Waste]] and has a permitted tonnage threshold of up to 438,000 tonnes per annum<ref>[https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/614334/Variation_notice.pdf/ Permit Variation Notice], EA</ref>. | ||
The plant is owned by [[Ancillary Components Ltd]]. | |||
==Plant== | ==Plant== | ||
Goosey Lodge biomass facility utilises two fluidised bed | Goosey Lodge biomass facility utilises two bubbling [[fluidised bed combustion systems]] which ensures that any liquids and sludges with high [[Biological or Chemical Oxygen Demand]] (BOD and COD respectively) can be oxidised efficiently<ref name ="GOO" />. Each fluidised bed incinerator has a capacity of up to 25 tonnes per hour equating to a maximum throughput of 438,000 tonnes per annum<ref>[https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/614334/Variation_notice.pdf/ Permit Variation Notice], EA</ref>. | ||
Goosey Lodge Power Plant was designed and built by [[Wykes Engineering]], the group's Engineering Company. Wykes provided a turnkey solution to the project which included design to manufacture and full life cycle maintenance and project management<ref name ="GOO" />. | |||
{{BioSustain|EPR={{#var: epr}}}} | |||
{{EAIn|EPR={{#var: epr}}}} | |||
==References== | ==References== |