Holbrook Community REC: Difference between revisions

no edit summary
No edit summary
 
(6 intermediate revisions by 2 users not shown)
Line 1: Line 1:
[[Category:Biomass EfW Plants]]
A [[Biomass EfW]] facility [[Holbrook Community REC]] is based on up to 55,000 tonnes per annum of [[Wood Waste]] producing 6.5 MWe gross power to be exported to the national grid. This facility is a [[Combined Heat and Power]] (CHP) plant, enough heat is produced and harnessed to supply approximately 6,700 local homes and commercial properties.
{{BiomassPlant|NAME=Holbrook Community Renewable Energy Centre|id=40}}
[[Category:Biomass EfW Plants]]{{#vardefine: epr|VP3737RS}}
[[File:Holbrook Biomass.jpg|400px|left|Holbrook Community Renewable Energy Centre]]
{{BiomassPlant|NAME=Holbrook Community REC|id=40|EPR={{#var: epr}}}}
 
[[File:Holbrook Biomass.jpg|400px|left|Holbrook Community Renewable Energy Centre]]<ref name="eye">[https://www.kantorenergy.com/holbrook-community-renewable-energy-centre Holbrook Energy Centre Site Photo]All Rights Reserved</ref> __TOC__
<br clear='left'/>
==Summary==
==Summary==
A [[Biomass EfW]] facility based on 55,000 tonnes per annum of waste wood producing 6.5 MWe gross power to be exported to the national grid. This facility is a [[Combined Heat and Power]] (CHP) plant, enough heat is produced and harnessed to supply approximately 6,700 local homes and commercial properties. Holbrook Community Renewable Energy Centre is located in Sheffield<ref name="ref1" >Date, 2017. [https://www.letsrecycle.com/news/latest-news/mid-uk-supplies-waste-wood-for-sheffield-biomass-facility/ Mid UK Supplies Waste Wood For Sheffield Biomass Facility. Online. letsrecycle.com. [Accessed 14 April 2020].]</ref>.
A [[Biomass EfW]] facility [[Holbrook Community REC]] is based on up to 55,000 tonnes per annum of [[Wood Waste]] producing 6.5 MWe gross power to be exported to the national grid. This facility is a [[Combined Heat and Power]] (CHP) plant, enough heat is produced and harnessed to supply approximately 6,700 local homes and commercial properties. Holbrook Community Renewable Energy Centre is located in Sheffield<ref name="ref1" >Date, 2017. [https://www.letsrecycle.com/news/latest-news/mid-uk-supplies-waste-wood-for-sheffield-biomass-facility/ Mid UK Supplies Waste Wood For Sheffield Biomass Facility. Online. letsrecycle.com. [Accessed 14 April 2020].]</ref>.


The waste wood feedstock is locally supplied by Mid UK Recycling, a waste management and recycling firm based in the East Midlands. The operator of this facility is Veolia Energy Services Ltd<ref name="ref1" />.
The [[Wood Waste]] feedstock is locally supplied by [[Mid UK Recycling]]. The operator of this facility is [[Veolia Energy Services Ltd]]<ref name="ref1" />.


==Plant==
==Plant==
The Design and Build EPC contractor for this development was Kandor Energy Ltd<ref>Kandor Energy, 2020. [https://www.kantorenergy.com/holbrook-community-renewable-energy-centre Kantor Energy - Holbrook Community Renewable Energy Centre. Online. Kantorenergy.com. [Accessed 14 April 2020].]</ref>.
The Design and Build [[EPC]] contractor for this development was [[Kandor Energy Ltd]]<ref>Kandor Energy, 2020. [https://www.kantorenergy.com/holbrook-community-renewable-energy-centre Kantor Energy - Holbrook Community Renewable Energy Centre. Online. Kantorenergy.com. [Accessed 14 April 2020].]</ref>.


The facility cost £30m to develop and became operational in 2017<ref>Recycling and Waste World, 2017. [https://www.recyclingwasteworld.co.uk/business/sheffield-renewable-energy-centre-opts-for-biomass-wood-chip-from-mid-uk-recycling/154126/ Sheffield Renewable Energy Centre Opts For Biomass Wood Chip From Mid UK Recycling. Online Recyclingwasteworld.co.uk. [Accessed 14 April 2020].]</ref>
The facility cost £30m to develop and became operational in 2017<ref>Recycling and Waste World, 2017. [https://www.recyclingwasteworld.co.uk/business/sheffield-renewable-energy-centre-opts-for-biomass-wood-chip-from-mid-uk-recycling/154126/ Sheffield Renewable Energy Centre Opts For Biomass Wood Chip From Mid UK Recycling. Online Recyclingwasteworld.co.uk. [Accessed 14 April 2020].]</ref>


The technology utilised in this facility is two water-cooled moving grate furnaces that are supplied by Turboden Srl (part of the Mitsubishi Heavy Industries Group). Turboden Srl also supplied the ‘organic rankine cycle’ (ORC) turbogenerators with air condensers for the facility which uses ‘organic fluid’ vapour as the driving force for the turbine within a closed loop heating circuit<ref name="ref1" />.
The technology utilised in this facility is two water-cooled moving grate furnaces that are supplied by [[Turboden Srl]] (part of the [[Mitsubishi Heavy Industries Group]]). [[Turboden Srl]] also supplied the ‘[[organic rankin cycle]]’ (ORC) turbogenerators with air condensers for the facility which uses ‘organic fluid’ vapour as the driving force for the turbine within a closed loop heating circuit<ref name="ref1" />.


==Local Authority Users==
{{BioSustain|EPR={{#var: epr}}}}
{{EAIn|EPR={{#var: epr}}}}


==References==
==References==
<references/>
<references/>
banneredit
3,643

edits