Troon: Difference between revisions

357 bytes added ,  15 August 2022
no edit summary
m (add picture and link)
No edit summary
 
(4 intermediate revisions by 2 users not shown)
Line 1: Line 1:
[[File:Pic of Troon EFW.png|400px|left|Troon Waste Wood EFW, source Urbas]]
A [[Biomass Waste EFW]] facility [[Troon]] is based on processing c. 25,000 tonnes per annum of [[Wood Waste]] generating 2.5MWe to the grid (or 2.33MWe and 10.9MWth)<ref>[https://www.woodbizforum.com/glennon-brothers-installs-a-new-biomass-cogeneration-plant-at-its-sawmill-in-the-uk/ Wood Business Forum Website]</ref>.
{{BiomassPlant|NAME=Troon|id=84}}
[[Category:Biomass EfW Plants]]{{#vardefine: epr|tbc}}
[[Category:Biomass EfW Plants]]
{{BiomassPlant|NAME=Troon|id=84|EPR={{#var: epr}}}}
 
[[File:Pic of Troon EFW.png|400px|left|Troon Waste Wood EFW, source Urbas]]__TOC__
 
<br clear='left'/>
 
 
 


==Summary==
==Summary==
A [[Biomass Waste EFW]] facility based on c. 25,000 tonnes per annum of [[Wood Waste]] generating 2.5MWe to the grid (or 2.33MWe and 10.9MWth)<ref>[https://www.woodbizforum.com/glennon-brothers-installs-a-new-biomass-cogeneration-plant-at-its-sawmill-in-the-uk/ Wood Business Forum Website]</ref>.
A [[Biomass Waste EFW]] facility [[Troon]] is based on processing c. 25,000 tonnes per annum of [[Wood Waste]] generating 2.5MWe to the grid (or 2.33MWe and 10.9MWth)  


The Troon site was developed by [[Glennon Brothers Ltd]] to process residues from their adjacent sawmill, one of the largest in the UK, and provide heat to dry processed wood and has been operating since 2017. It is located in Troon harbour, at the old Adam Wilson & Sons Sawmill.
The Troon site was developed by [[Glennon Brothers Ltd]] to process residues from their adjacent sawmill, one of the largest in the UK, and provides heat to dry processed wood and has been operating since 2017. It is located in Troon harbour, at the old Adam Wilson & Sons Sawmill.


==Plant==
==Plant==
The project was delivered by [[URBAS Energietechnik]], using their combustion grate technology<ref>[https://www.urbas.at/en/projects/glennon-brothers-ltd/ URBAS Website]</ref> at a reported capital cost of £14m<ref>[http://glennonbrothers.ie/press/Cabinet_Minister_Ewing_visits_Troon_2017.html Glennon Brothers Website]</ref>.
The project was delivered by [[URBAS Energietechnik]], using their combustion grate technology<ref>[https://www.urbas.at/en/projects/glennon-brothers-ltd/ URBAS Website]</ref> at a reported capital cost of £14m<ref>[http://glennonbrothers.ie/press/Cabinet_Minister_Ewing_visits_Troon_2017.html Glennon Brothers Website]</ref>.


==Local Authority Users==
{{BioSustain|EPR={{#var: epr}}}}
The plant utilizes [[Wood Waste]] from an adjacent sawmill, and receives no local authority wood.  
{{EAIn|EPR={{#var: epr}}}}
 
The tonnage processed by the plant is a mixture of [[Wood Waste]] off-cuts from its adjacent sawmill and is essentially 'internal' material from their own processing.  


==References==
==References==
<references />
<references />
banneredit
3,643

edits