Troon: Difference between revisions

22 bytes removed ,  15 August 2022
no edit summary
m (add page specific text)
No edit summary
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
{{BiomassPlant|NAME=Troon|id=84}}
A [[Biomass Waste EFW]] facility [[Troon]] is based on processing c. 25,000 tonnes per annum of [[Wood Waste]] generating 2.5MWe to the grid (or 2.33MWe and 10.9MWth)<ref>[https://www.woodbizforum.com/glennon-brothers-installs-a-new-biomass-cogeneration-plant-at-its-sawmill-in-the-uk/ Wood Business Forum Website]</ref>.
[[Category:Biomass EfW Plants]]
[[Category:Biomass EfW Plants]]{{#vardefine: epr|tbc}}
{{BiomassPlant|NAME=Troon|id=84|EPR={{#var: epr}}}}
[[File:Pic of Troon EFW.png|400px|left|Troon Waste Wood EFW, source Urbas]]__TOC__
[[File:Pic of Troon EFW.png|400px|left|Troon Waste Wood EFW, source Urbas]]__TOC__
<br clear='left'/>
<br clear='left'/>


==Summary==
==Summary==
A [[Biomass Waste EFW]] facility based on c. 25,000 tonnes per annum of [[Wood Waste]] generating 2.5MWe to the grid (or 2.33MWe and 10.9MWth)<ref>[https://www.woodbizforum.com/glennon-brothers-installs-a-new-biomass-cogeneration-plant-at-its-sawmill-in-the-uk/ Wood Business Forum Website]</ref>.
A [[Biomass Waste EFW]] facility [[Troon]] is based on processing c. 25,000 tonnes per annum of [[Wood Waste]] generating 2.5MWe to the grid (or 2.33MWe and 10.9MWth)  


The Troon site was developed by [[Glennon Brothers Ltd]] to process residues from their adjacent sawmill, one of the largest in the UK, and provides heat to dry processed wood and has been operating since 2017. It is located in Troon harbour, at the old Adam Wilson & Sons Sawmill.
The Troon site was developed by [[Glennon Brothers Ltd]] to process residues from their adjacent sawmill, one of the largest in the UK, and provides heat to dry processed wood and has been operating since 2017. It is located in Troon harbour, at the old Adam Wilson & Sons Sawmill.
Line 12: Line 13:
The project was delivered by [[URBAS Energietechnik]], using their combustion grate technology<ref>[https://www.urbas.at/en/projects/glennon-brothers-ltd/ URBAS Website]</ref> at a reported capital cost of £14m<ref>[http://glennonbrothers.ie/press/Cabinet_Minister_Ewing_visits_Troon_2017.html Glennon Brothers Website]</ref>.
The project was delivered by [[URBAS Energietechnik]], using their combustion grate technology<ref>[https://www.urbas.at/en/projects/glennon-brothers-ltd/ URBAS Website]</ref> at a reported capital cost of £14m<ref>[http://glennonbrothers.ie/press/Cabinet_Minister_Ewing_visits_Troon_2017.html Glennon Brothers Website]</ref>.


==Tonnage Input/Fuel==
{{BioSustain|EPR={{#var: epr}}}}
The tonnage processed by the plant is a mixture of [[Wood Waste]] off-cuts from its adjacent sawmill and is essentially 'internal' material that is neither reported in the most recent [[Annual Sustainability Report]] for 2018-19<ref>[https://www.ofgem.gov.uk/publications-and-updates/biomass-sustainability-dataset-2018-19 Biomass Sustainability Dataset 2018-19]</ref> by [[Ofgem]] or the [[EA]] data for the calendar year (i.e. January 2018 to December 2018).
{{EAIn|EPR={{#var: epr}}}}
 
The tonnage processed by the plant is a mixture of [[Wood Waste]] off-cuts from its adjacent sawmill and is essentially 'internal' material from their own processing.  


==References==
==References==
<references />
<references />
banneredit
3,643

edits