A [[Biomass EfW]] facility, [[Welland Bio Power]] is based on processing up to 72,000 tonnes per annum of [[Wood Waste]] producing 10.6 MWe gross power to be exported to the national grid after the facility’s own energy requirements are met<ref name="ref1" >CoGen, 2018. [https://www.cogenuk.com/projects Projects — Cogen. Online. CoGen. [Accessed 3 April 2020]].</ref>.
{{BiomassPlant|NAME=Welland|id=89}}
[[Category:Biomass EfW Plants]]{{#vardefine: epr|AP3432QC}}
[[File:Welland Bio Power.png|400px|left|Welland Bio Power. CoGen, 2018.]]
{{BiomassPlant|NAME=Welland Bio Power|id=89|EPR={{#var: epr}}}}
 
[[File:Welland Bio Power.png|400px|left|Welland Bio Power. CoGen, 2018.]]<ref>[https://www.cogenuk.com/projects/ Welland Bio Power Site Photo]All Rights Reserved</ref>__TOC__
 
<br clear='left'/>
 
 
 
 
 
 
 
 
 


==Summary==
==Summary==
A [[Biomass EfW]] facility based on 72,000 tonnes per annum of waste wood producing 10.6 MWe gross power to be exported to the national grid after the facility’s own energy requirements are met<ref name="ref1" >CoGen, 2018. [https://www.cogenuk.com/projects Projects — Cogen. Online. CoGen. [Accessed 3 April 2020].</ref>.
A [[Biomass EfW]] facility, [[Welland Bio Power]] is based on processing up to 72,000 tonnes per annum of [[Wood Waste]] producing 10.6 MWe gross power to be exported to the national grid after the facility’s own energy requirements are met<ref name="ref1"/>.


The facility is located near Theddingworth in Northamptonshire. The waste wood feedstock is sourced locally through a feedstock contract with Welland Waste Management’s adjacent waste timber processing facility<ref name="ref1"/>.
The facility is located near Theddingworth in Northamptonshire. The [[Wood Waste]] feedstock is sourced locally through a contract with [[Welland Waste Management]]’s adjacent waste timber processing facility<ref name="ref1"/>.


Welland Bio Power is operated by Nexterra and was developed by CoGen in partnership with Welland Waste Management Limited. CoGen continues to provide management services<ref name="ref1"/>.
Welland Bio Power is operated by [[Nexterra]] and was developed by [[CoGen]] in partnership with [[Welland Waste Management]]. [[CoGen]] continues to provide management services<ref name="ref1"/>.


==Plant==
==Plant==
The facility utilises is Nexterra’s fixed-bed updraft gasification system techology, which is an [[Advanced Conversion Technology]]. MWH Treatment provided EPC services for the project<ref name="ref2" >Nexterra, 2015. [http://www.nexterra.ca/files/pdf/20150409-NexterraWelland.pdf Nexterra Consortium Reaches Financial Close On Biomass Gasification Plant In Northamptonshire, UK. Online. Nexterra.ca. [Accessed 3 April 2020].]</ref>.  
The facility utilises [[Nexterra]]’s fixed-bed updraft [[Gasification|gasification]] system technology, which is an [[Advanced Conversion Technology]]. [[MWH Treatment]] provided [[EPC]] services for the project<ref name="ref2" >Nexterra, 2015. [http://www.nexterra.ca/files/pdf/20150409-NexterraWelland.pdf Nexterra Consortium Reaches Financial Close On Biomass Gasification Plant In Northamptonshire, UK. Online. Nexterra.ca. [Accessed 3 April 2020]].</ref>.  


The facility cost £51.6 million to develop and was financed by Balfour Beatty Investments, NOY Nexterra Holdings Limited Partnership (a partnership between NOY Infrastructure Fund and Nexterra) and Equitix MA Infrastructure Fund<ref name="ref2" />.
The facility cost £51.6 million to develop and was financed by [[Balfour Beatty Investments]], NOY Nexterra Holdings Limited Partnership (a partnership between [[NOY Infrastructure Fund]] and [[Nexterra]]) and [[Equitix MA Infrastructure Fund]]<ref name="ref2" />.


The facility replicates its sister project [[Birmingham Bio Power]].
The facility replicates its sister project [[Birmingham Bio Power]].
 
{{BioSustain|EPR={{#var: epr}}}}
==Local Authority Users==
{{EAIn|EPR={{#var: epr}}}}
The [[Wood Waste]] is exclusively supplied by [[Welland Waste Management]] which sources much of the [[Wood Waste]] from [[Waste Disposal Authorities]].