{{BiomassPlant|NAME=Wilton 10|id=94}}
A [[Biomass Waste EFW]] facility [[Wilton 10]] is based upon the co-firing of [[Wood Waste]], virgin wood, forestry processing rejects and energy crops to generate 30MWe and 10MWth of energy for use in the grid and the adjacent [[Sembcorp]] site, as an ancillary operation to their 197MW Wilton Power Station<ref>[https://www.power-technology.com/projects/wood-burning/ Power Technology Website]</ref>.
[[Category:Biomass EfW Plants]]
[[Category:Biomass EfW Plants]]{{#vardefine: epr|NP3838LV}}
{{BiomassPlant|NAME=Wilton 10|id=94|EPR={{#var: epr}}}}
[[File:Picture of Wilton 10.png|left|Picture of Wilton 10 ]]__TOC__
[[File:Picture of Wilton 10.png|left|Picture of Wilton 10 ]]__TOC__
<br clear='left'/>
<br clear='left'/>


==Summary==
==Summary==
A [[Biomass Waste EFW]] facility based upon the co-firing of [[Wood Waste]], virgin wood, forestry processing rejects and energy crops to generate 30MWe and 10MWth of energy for use in the grid and the adjacent [[Sembcorp]] site, as an ancillary operation to their 197MW Wilton Power Station<ref>[https://www.power-technology.com/projects/wood-burning/ Power Technology Website]</ref>. The plant consumes up to 300,000 tonnes per year of material, of which around 80,000 tonnes is [[Wood Waste]] supplied by [[UK Waste Wood Recycling]], a subsidiary of [[Enva]], from a nearby separate site.
A [[Biomass Waste EFW]] facility [[Wilton 10]] is based upon the co-firing of [[Wood Waste]], virgin wood, forestry processing rejects and energy crops to generate 30MWe and 10MWth of energy for use in the grid and the adjacent [[Sembcorp]] site, as an ancillary operation to their 197MW Wilton Power Station. The plant consumes up to 300,000 tonnes per year of material, of which around 80,000 tonnes is [[Wood Waste]] supplied by [[UK Waste Wood Recycling]], a subsidiary of [[Enva]], from a nearby separate site.


The Wilton 10 facility was developed by [[Sembcorp Energy UK]] and was operational in the autumn of 2007 and at the time was the first large scale biomass power station to be built.  It is located in Teeside on the Wilton International Industrial Estate and is discrete from [[Wilton 11 EfW|Wilton 11]] which is a [[Residual Waste EFW]] project.   
The Wilton 10 facility was developed by [[Sembcorp Energy UK]] and was operational in the autumn of 2007 and at the time was the first large scale biomass power station to be built.  It is located in Teeside on the Wilton International Industrial Estate and is discrete from [[Wilton 11 EfW|Wilton 11]] which is a [[Residual Waste EFW]] project.   


==Plant==
==Plant==
Built under an [[EPC]] contract with [[Foster wheeler]] for a reported $55m (excluding the turbine and power island supplied by [[Siemens]]), the standard combustion technology is based on a fluidised bed system.  
Built under an [[EPC]] contract with [[Foster wheeler]] for a reported $55m (excluding the turbine and power island supplied by [[Siemens]]), the standard combustion technology is based on a [[Fluidised Bed]] system.  


==Tonnage Input/Fuel==
{{BioSustain|EPR={{#var: epr}}}}
The tonnage received by the plant is a mixture of [[Biomass]] and in the most recent [[Annual Sustainability Report]] for 2018-19<ref>[https://www.ofgem.gov.uk/publications-and-updates/biomass-sustainability-dataset-2018-19 Biomass Sustainability Dataset 2018-19]</ref> [[Ofgem]] reported the following fuel received ([[Wood Waste]] representing 32% of input):
{{EAIn|EPR={{#var: epr}}}}
{| class="wikitable"
 
|-
The [[Wood Waste]] is exclusively supplied by [[UK Waste Wood Recycling]] (previously owned by [[Hadfield]], acquired by [[Enva]] in 2018<ref>https://www.letsrecycle.com/news/enva-announces-hadfield-wood-recyclers-acquisition/</ref>), which sources much of the [[Wood Waste]] from [[Waste Disposal Authorities]].  
! Biomass !! Tonnage (2018-19)
|-
| [[Wood Waste]] || '''79,994'''
|-
| Sawmill Residues || 56,026
|-
| Arboriculture and Forestry Residues || 91,335
|-
| Virgin Wood (logs)|| 29,954
|-
| Total||250,309
|}
The [[Wood Waste]] is exclusively supplied by [[UK Waste Wood Recycling]] which sources much of the [[Wood Waste]] from [[Waste Disposal Authorities]]. The [[Waste Wood]] tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the [[EA]] statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018) and were '''60,898''' tonnes.  