A [[Biomass Waste EFW]] facility [[Wilton 10]] is based upon the co-firing of [[Wood Waste]], virgin wood, forestry processing rejects and energy crops to generate 30MWe and 10MWth of energy for use in the grid and the adjacent [[Sembcorp]] site, as an ancillary operation to their 197MW Wilton Power Station<ref>[https://www.power-technology.com/projects/wood-burning/ Power Technology Website]</ref>.
{{BiomassPlant|NAME=Wilton 10|id=94}}
[[Category:Biomass EfW Plants]]{{#vardefine: epr|NP3838LV}}
[[Category:Biomass EfW Plants]]
{{BiomassPlant|NAME=Wilton 10|id=94|EPR={{#var: epr}}}}
 
[[File:Picture of Wilton 10.png|left|Picture of Wilton 10 ]]__TOC__
 
<br clear='left'/>
 


==Summary==
==Summary==
A [[Biomass Waste EFW]] facility based upon the co-firing of [[Wood Waste]], virgin wood, forestry processing rejects and energy crops to generate 30MWe and 10MWth of energy for use in the grid and the adjacent [[Sembcorp]] site, as an ancillary operation to their 197MW Wilton Power Station<ref>[https://www.power-technology.com/projects/wood-burning/ Power Technology Website]</ref>. The plant consumes 300,000 tonnes per year of material, of which 80,000 tonnes is [[Wood Waste]] supplied by [[UK Waste Wood Recycling]], a subsidiary of [[Enva]], from a nearby separate site.
A [[Biomass Waste EFW]] facility [[Wilton 10]] is based upon the co-firing of [[Wood Waste]], virgin wood, forestry processing rejects and energy crops to generate 30MWe and 10MWth of energy for use in the grid and the adjacent [[Sembcorp]] site, as an ancillary operation to their 197MW Wilton Power Station. The plant consumes up to 300,000 tonnes per year of material, of which around 80,000 tonnes is [[Wood Waste]] supplied by [[UK Waste Wood Recycling]], a subsidiary of [[Enva]], from a nearby separate site.


The Wilton 10 facility was developed by [[Sembcorp Energy UK]] and was operational in the autumn of 2007 and at the time was the first large scale biomass power station to be built.  It is located in Teeside on the Wilton International Industrial Estate and is discrete from [[Wilton 11]] which is a [[Residual Waste EFW]] project.   
The Wilton 10 facility was developed by [[Sembcorp Energy UK]] and was operational in the autumn of 2007 and at the time was the first large scale biomass power station to be built.  It is located in Teeside on the Wilton International Industrial Estate and is discrete from [[Wilton 11 EfW|Wilton 11]] which is a [[Residual Waste EFW]] project.   


==Plant==
==Plant==
Built under an [[EPC]] contract with [[Foster wheeler]] for a reported $55m (excluding the turbine and power island supplied by [[Siemens]]), the standard combustion technology is based on a fluidised bed system.  
Built under an [[EPC]] contract with [[Foster wheeler]] for a reported $55m (excluding the turbine and power island supplied by [[Siemens]]), the standard combustion technology is based on a [[Fluidised Bed]] system.  


==Local Authority Users==
{{BioSustain|EPR={{#var: epr}}}}
The waste is exclusively supplied by [[UK Waste Wood Recycling]] which sources much of the [[Wood Waste]] from local authorities. The following data comes from [[WasteDataFlow]] for the financial year 2018/19 and represents those local authorities recorded as putting tonnage into the site (either directly or via a transfer station). The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the [[EA]] statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). A 'zero return' below indicates no local authority tonnage was recorded, most likely a result of the plant being recently commissioned and actually having received no tonnage. Equally, lower than expected tonnage maybe a result of either a new plant being in 'ramp up' towards full capacity after construction, or may be a result of plant shut down and subsequent re-start in a year.
{{EAIn|EPR={{#var: epr}}}}


data link to be added
The [[Wood Waste]] is exclusively supplied by [[UK Waste Wood Recycling]] (previously owned by [[Hadfield]], acquired by [[Enva]] in 2018<ref>https://www.letsrecycle.com/news/enva-announces-hadfield-wood-recyclers-acquisition/</ref>), which sources much of the [[Wood Waste]] from [[Waste Disposal Authorities]].