Tyrone Energy: Difference between revisions

Bin52 (talk | contribs)
m tonnage data added
Bin52 (talk | contribs)
 
(2 intermediate revisions by the same user not shown)
Line 1: Line 1:
[[File:Pic Tyrone Energy.png|300px|left|Tyrone Energy Waste Wood EFW]]
A [[Biomass Waste EFW]] facility [[Tyrone Energy]] is based on processing up to 25,000 tonnes per annum of [[Wood Waste]] generating 2.7MWe to the grid<ref>[https://www.elementconsultants.co.uk/tyrone-energy-2/ Element Website]</ref>.
{{BiomassPlant|NAME=Tyrone Energy|id=86}}
[[Category:Biomass EfW Plants]]{{#vardefine: epr|tbc7}}
[[Category:Biomass EfW Plants]]
{{BiomassPlant|NAME=Tyrone Energy|id=86|EPR={{#var: epr}}}}
 
[[File:Pic Tyrone Energy.png|300px|left|Tyrone Energy Waste Wood EFW]]__TOC__
 
<br clear='left'/>
 


==Summary==
==Summary==
A [[Biomass Waste EFW]] facility based on up to 25,000 tonnes per annum of [[Wood Waste]] generating 2.7MWe to the grid<ref>[https://www.elementconsultants.co.uk/tyrone-energy-2/ Element Website]</ref>.  
A [[Biomass Waste EFW]] facility [[Tyrone Energy]] is based on processing up to 25,000 tonnes per annum of [[Wood Waste]] generating 2.7MWe to the grid.


The Tyrone site was developed by [[Tyrone Energy Ltd]] and was operational in late 2014 and at the time was the first large scale [[EfW]] plant in Northern Ireland. It is located near Strabane, County Tyrone<ref>[https://www.tyroneenergy.com/ Tyrone Energy Website]</ref>.
The Tyrone site was developed by [[Tyrone Energy Ltd]] and was operational in late 2014 and at the time was the first large scale [[EfW]] plant in Northern Ireland. It is located near Strabane, County Tyrone<ref>[https://www.tyroneenergy.com/ Tyrone Energy Website]</ref>. It was reported in September 2022 that the business was acquired by [[Beauparc]]<ref>https://beauparc.ie/beauparc-acquire-biomass-power-station-tyrone-energy/</ref>.


==Plant==
==Plant==
Built at a cost of £9.5m, the combustion technology is based on a standard stepped grate and is [[WID]] complaint.  
Built at a cost of £9.5m, the combustion technology is based on a standard stepped grate and is [[WID]] complaint.  


==Tonnage Input/Fuel==
{{BioSustain|EPR={{#var: epr}}}}
The tonnage received by the plant in the most recent [[Annual Sustainability Report]] for 2018-19<ref>[https://www.ofgem.gov.uk/publications-and-updates/biomass-sustainability-dataset-2018-19 Biomass Sustainability Dataset 2018-19]</ref> was reported by [[Ofgem]] as follows:
{{EAIn|EPR={{#var: epr}}}}
{| class="wikitable"
|-
! Biomass !! Tonnage (2018-19)
|-
| [[Wood Waste]] || '''23,269'''
|-
| Other || 0
|-
| Total||23,269
|}
The [[Wood Waste]] is received from a variety of sources. The [[Wood Waste]] tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the [[NIEA]] statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018) and not currently available.


==References==
==References==
<references />
<references />