[[Hope Cement Kiln]] is located in Derbyshire and is owned by [[Breedon Cement]].
{{CementKiln|EPR=BP3731VJ|id=5}}
{{CementKiln|EPR=BP3731VJ|id=5}}
[[Category:Cement Kilns]]
[[Category:Cement Kilns]]
Line 18: Line 19:
==Raw Materials==
==Raw Materials==
The primary raw materials are Carboniferous Limestone and Boulder Clay and Carboniferous Shale.
The primary raw materials are Carboniferous Limestone and Boulder Clay and Carboniferous Shale.
 
{{NHLFTable|Permit=BP3731VJ}}
==Waste Used on Site==
{{EAIn|EPR=BP3731VJ|CK=T}}
The Hope site waste return to the [[EA]] for the most recent year of 2018 showed 147,546 tonnes of the following wastes used on site:
Around 40% of the tonnage listed was used for the primary purpose of substituting fuel requirements in the plant, with coal fly ash (also called Pulverized Fuel Ash or [[PFA]]) used as a replacement for raw material (shale) in the production process<ref>[https://www.hopecementworks.co.uk/about/ Breedon/Hope Cement Website - About]</ref>.
{{CKWaste|EPR=BP3731VJ}}
Around 40% of the tonnage listed was used for the primary purpose of substituting fuel requirements in the plant, with coal fly ash (also called Pulverized Fuel Ash or [[PFA]]) used in as a replacement for raw material (shale) in the production process<ref>[https://www.hopecementworks.co.uk/about/ Breedon/Hope Cement Website - About]</ref>.


==References==
==References==
<references />
<references />

Latest revision as of 03:50, 10 November 2022

Hope Cement Kiln is located in Derbyshire and is owned by Breedon Cement.


Hope Cement Kiln
Site Location
Site Location

See Cement Kilns → page for a larger UK Wide map.

Waste Licence BP3731VJ
Operator Breedon Cement
Parent Company Breedon Group
Clinker Capacity 1.3 Mt

Summary site information collated from a variety of sources.

Hope Cement Works - Global Cement Website
Hope Cement Works - Global Cement Website


Overview

WikiWaste has used the website Cement Plants and Kilns in Britain and Ireland[1] extensively for the reference material for each individual cement kiln page. The detail on this reference website is extensive and as WikiWaste is focused upon the UK waste and resource market, only the key highlights are captured from this website (and company websites accordingly) to provide background and context. Hope started manufacturing clinker in 1929 and up to 2015 had produced 68 million tonnes of clinker through 7 rotary kilns over this period.

Ownership

  • 1929 to 2001 BPCM (G&T Earle)(Blue Circle)
  • 2001 to 2013 Lafarge
  • 2013 to 2017 Hope Construction Materials
  • 2017 to Present Breedon Cement (part of the Breedon Group)

The Process at Hope

The process at the site is similar to that at Cookstown - a 'semi-dry process' from kiln supplier Polysius (part of the ThyssenKrupp group).

Raw Materials

The primary raw materials are Carboniferous Limestone and Boulder Clay and Carboniferous Shale.

Waste Tonnage, EWC List

The table shows a list of the Waste for the Permit BP3731VJ, that has arrived into sites as reported to the Regulator and then publicised in their reported statistics. The Data was last updated in October 2023. The total reported tonnage arriving at the site was: 141,422.3t.

EWC Code Description Tonnes In
16 01 03 end-of-life tyres 23690.23
19 12 10 combustible waste (refuse derived fuel) 20217.12
10 01 02 coal fly ash 82837.74
10 01 03 fly ash from peat and untreated wood 14589.21
10 01 05 calcium-based reaction wastes from flue gas desulphurisation in solidform 88.00


Waste Tonnage, By Origin

The table shows a list of the Waste for the Permit BP3731VJ, that has arrived into sites as reported to the Regulator and then publicised in their reported statistics. The Data was last updated on October 2023. The total reported tonnage arriving at the site was: 141,422.3t.

Where this tonnage exceeds that reported in year of the corresponding annual report, this may be due to the following reasons:

  • Tonnage may have been received but not incinerated, i.e. the material is held pending incineration (the operator return to the EA reports as received whereas the annual report focuses on when the waste is incinerated.)
  • Material may have been received into the site but treated in some other way than incineration.
  • Material may have been received on the but transferred out of site for disposal/treatment at another site rather than incineration on the site.
EWC Code Origin of Waste Tonnes In
10 01 03 North Yorkshire 14589.21
10 01 05 West Yorkshire 88.00
19 12 10 Lancashire 20217.12
10 01 02 Nottinghamshire 82837.74
16 01 03 East Riding of Yorkshire 23690.23


Around 40% of the tonnage listed was used for the primary purpose of substituting fuel requirements in the plant, with coal fly ash (also called Pulverized Fuel Ash or PFA) used as a replacement for raw material (shale) in the production process[2].

References