Padeswood Cement Kiln: Difference between revisions

no edit summary
mNo edit summary
No edit summary
 
(One intermediate revision by one other user not shown)
Line 1: Line 1:
[[Cauldon Cement Kiln]] is located in Mold and is owned by [[Hanson Cement]].
[[Padeswood Cement Kiln]] is located in Mold and is owned by [[Hanson Cement]].
{{CementKiln|EPR=BL1096IB|id=7}}
{{CementKiln|EPR=BL1096IB|id=7}}
[[Category:Cement Kilns]]
[[Category:Cement Kilns]]
Line 20: Line 20:
The primary raw materials are Carboniferous Limestone from Cefn Mawr Quarry, with coal measure shale and colliery waste from the Llay Main colliery tip, moving to Bersham Colliery in the future.
The primary raw materials are Carboniferous Limestone from Cefn Mawr Quarry, with coal measure shale and colliery waste from the Llay Main colliery tip, moving to Bersham Colliery in the future.
{{NHLFTable|Permit=BL1096IB}}
{{NHLFTable|Permit=BL1096IB}}
{{EAIn|EPR=BL1096IB}}
{{EAIn|EPR=BL1096IB|CK=T}}
The majority of the tonnage listed was used for the primary purpose of substituting fuel requirements in the plant. In 2015 the tonnage was almost exclusively for the use of fuel and included [[Cemfuel]] (liquid waste solvents) 13,422 tonnes, [[MBM]] 7,284 tonnes and [[SRF]] 19,007<ref>[https://www.hanson-communities.co.uk/en/search?keywords=padeswood Link to pdf on Hanson Website - 2015 Annual Performance Report for Padeswood]</ref>.
The majority of the tonnage listed was used for the primary purpose of substituting fuel requirements in the plant. In 2015 the tonnage was almost exclusively for the use of fuel and included [[Cemfuel]] (liquid waste solvents) 13,422 tonnes, [[MBM]] 7,284 tonnes and [[SRF]] 19,007<ref>[https://www.hanson-communities.co.uk/en/search?keywords=padeswood Link to pdf on Hanson Website - 2015 Annual Performance Report for Padeswood]</ref>.