A [[Biomass Waste EFW]] facility located in Tansterne, near Hull, which is based processing up to 150,000 tonnes per annum of [[Wood Waste]] generating 22MW of electricity to the grid<ref name="Tan">[https://solar21.ie/projects/biomass-21/ Solar 21 Biomass]</ref>.
{{BiomassPlant|NAME=Tansterne|id=79}}
[[Category:Biomass EfW Plants]]{{#vardefine: epr|WP3738DE}}
{{BiomassPlant|NAME=Tansterne|id=79|EPR={{#var: epr}}}}
[[File:Tansterne.jpg|400px|left|Tansterne]]__TOC__
[[File:Tansterne.jpg|400px|left|Tansterne]]__TOC__
<br clear="left" />
<br clear="left" />
==Summary==
==Summary==
A [[Biomass Waste EFW]] facility located in Tansterne, near Hull, which is based processing up to 150,000 tonnes per annum of [[Wood Waste]] generating 22MW of electricity to the grid<ref name="Tan">[https://solar21.ie/projects/biomass-21/ Solar 21 Biomass]</ref>.
A [[Biomass Waste EFW]] facility located in Tansterne, near Hull, which is based processing up to 150,000 tonnes per annum of [[Wood Waste]] generating 22MW of electricity to the grid<ref name="Tan" />.


It was funded and developed by [[Solar 21]] in partnership with [[Heat Recovery Solutions]] (HRS) Ltd<ref>[https://www.letsrecycle.com/news/latest-news/probio-energy-wins-170000tpa-biomass-contract/ Lets Recycle]</ref>. The plant became fully operational in February 2018. The cost of the project was an estimated £35m<ref>[https://bioenergyinternational.com/heat-power/hrs-start-work-35-million-tansterne-biomass-power-plant/ Bioenergy International]</ref>.
It was funded and developed by [[Solar 21]] in partnership with [[Heat Recovery Solutions]] (HRS) Ltd<ref>[https://www.letsrecycle.com/news/latest-news/probio-energy-wins-170000tpa-biomass-contract/ Lets Recycle]</ref>. The plant became fully operational in February 2018. The cost of the project was an estimated £35m<ref>[https://bioenergyinternational.com/heat-power/hrs-start-work-35-million-tansterne-biomass-power-plant/ Bioenergy International]</ref>.
Line 13: Line 14:
The biomass power plant utilises a twin line fluidised bed [[gasification]] combustion system, heat recovery and power module technology developed by [[HRS]], a subsidiary [[HRS Energy Ltd]] which was manufactured in Hull by project partner [[CF Struthers]], the sister company to HRS Energy<ref>[https://www.letsrecycle.com/news/latest-news/probio-energy-wins-170000tpa-biomass-contract/ Lets Recycle]</ref>. Each line has a maximum throughput in the order of 16 tonnes per hour<ref>[https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/657559/Tansterne_biomass_plant_permit.pdf/ Environmental Permit], EA</ref>.
The biomass power plant utilises a twin line fluidised bed [[gasification]] combustion system, heat recovery and power module technology developed by [[HRS]], a subsidiary [[HRS Energy Ltd]] which was manufactured in Hull by project partner [[CF Struthers]], the sister company to HRS Energy<ref>[https://www.letsrecycle.com/news/latest-news/probio-energy-wins-170000tpa-biomass-contract/ Lets Recycle]</ref>. Each line has a maximum throughput in the order of 16 tonnes per hour<ref>[https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/657559/Tansterne_biomass_plant_permit.pdf/ Environmental Permit], EA</ref>.


In September 2019 the O&M contractor [[HRS Energy Tansterne Ltd]] (HRSET) went into administration. HRSET had originally held the long term O&M contract. The plant is now owner-operated by [[GIB-Bio Ltd]] which is a subsidiary of [[Solar 21]], the owners of the facility<ref name="Tan" />.
In September 2019 the O&M contractor [[HRS Energy Tansterne Ltd]] (HRSET) went into administration. HRSET had originally held the long term [[O&M]] contract. The plant is now owner-operated by [[GIB-Bio Ltd]] which is a subsidiary of [[Solar 21]], the owners of the facility<ref name="Tan" />.


The plant has been built to be '[[CHP]] ready' so that when a district heating market becomes available, the provision of heat to supply a local network will be achievable without any modification to the installed system<ref>[https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/657559/Tansterne_biomass_plant_permit.pdf/ Environmental Permit], EA</ref>.
The plant has been built to be '[[CHP]] ready' so that when a district heating market becomes available, the provision of heat to supply a local network will be achievable without any modification to the installed system<ref>[https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/657559/Tansterne_biomass_plant_permit.pdf/ Environmental Permit], EA</ref>.


==Tonnage Input/Fuel==
{{BioSustain|EPR={{#var: epr}}}}
The tonnage received by the plant primarily [[Wood Waste]] but there is no tonnage reported in the most recent [[Annual Sustainability Report]] for 2018-19<ref>[https://www.ofgem.gov.uk/publications-and-updates/biomass-sustainability-dataset-2018-19 Biomass Sustainability Dataset 2018-19]</ref> by [[Ofgem]]. The [[Wood Waste]] tonnage received and recorded in the [[EA]] statistics for the calendar year (i.e. January 2018 to December 2018) was '''142,057''' tonnes.