The biomass power plant utilises a twin line fluidised bed [[gasification]] combustion system, heat recovery and power module technology developed by [[HRS]], a subsidiary [[HRS Energy Ltd]] which was manufactured in Hull by project partner [[CF Struthers]], the sister company to HRS Energy<ref>[https://www.letsrecycle.com/news/latest-news/probio-energy-wins-170000tpa-biomass-contract/ Lets Recycle]</ref>. Each line has a maximum throughput in the order of 16 tonnes per hour<ref>[https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/657559/Tansterne_biomass_plant_permit.pdf/ Environmental Permit], EA</ref>.
The biomass power plant utilises a twin line fluidised bed [[gasification]] combustion system, heat recovery and power module technology developed by [[HRS]], a subsidiary [[HRS Energy Ltd]] which was manufactured in Hull by project partner [[CF Struthers]], the sister company to HRS Energy<ref>[https://www.letsrecycle.com/news/latest-news/probio-energy-wins-170000tpa-biomass-contract/ Lets Recycle]</ref>. Each line has a maximum throughput in the order of 16 tonnes per hour<ref>[https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/657559/Tansterne_biomass_plant_permit.pdf/ Environmental Permit], EA</ref>.


In September 2019 the O&M contractor [[HRS Energy Tansterne Ltd]] (HRSET) went into administration. HRSET had originally held the long term O&M contract. The plant is now owner-operated by [[GIB-Bio Ltd]] which is a subsidiary of [[Solar 21]], the owners of the facility<ref name="Tan" />.
In September 2019 the O&M contractor [[HRS Energy Tansterne Ltd]] (HRSET) went into administration. HRSET had originally held the long term [[O&M]] contract. The plant is now owner-operated by [[GIB-Bio Ltd]] which is a subsidiary of [[Solar 21]], the owners of the facility<ref name="Tan" />.


The plant has been built to be '[[CHP]] ready' so that when a district heating market becomes available, the provision of heat to supply a local network will be achievable without any modification to the installed system<ref>[https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/657559/Tansterne_biomass_plant_permit.pdf/ Environmental Permit], EA</ref>.
The plant has been built to be '[[CHP]] ready' so that when a district heating market becomes available, the provision of heat to supply a local network will be achievable without any modification to the installed system<ref>[https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/657559/Tansterne_biomass_plant_permit.pdf/ Environmental Permit], EA</ref>.