3Rs Walsall: Difference between revisions

no edit summary
(add page specific text)
 
No edit summary
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
An [[EfW]] facility based upon conventional combustion technology and which reached financial close and entered construction in December 2023. [[Walsall Energy Recovery Facility]] has a permit capacity of 478,300 tonnes and a forecast operational capacity of 436,000 tonnes per annum. The project is owned by [[Encyclis]] and was originally developed by BH Energy Gap as [[3R Walsall]]. {{EfWTemplate|EPR={{#var:epr}}|id=76}}
An [[EfW]] facility based upon conventional combustion technology and which reached financial close and entered construction in December 2023. [[Walsall Energy Recovery Facility]] has a permit capacity of 478,300 tonnes and a forecast operational capacity of 436,000 tonnes per annum. The project is owned by [[Encyclis]] and was originally developed by BH Energy Gap as [[3R Walsall]]. {{EfWTemplate|EPR={{#var:epr}}|id=76}}


[[File:Lostock.png|350px|left|Image of Lostock EFW]]__TOC__<br clear='left' />
[[File:Walsall EFW.jpg|350px|left|Image of Walsall EFW]]__TOC__<br clear='left' />


==Summary==
==Summary==
Line 8: Line 8:


==Technology==
==Technology==
The plant technology will comprise 2 lines of a standard moving grate technology, producing super-heated steam and 49MWe<ref>[https://www.encyclis.com/financial-close-achieved-on-walsall-energy-from-waste-facility/ Encyclis News Item]</ref>.
The plant technology will comprise 2 lines of a standard moving grate technology, producing super-heated steam and 49MWe<ref>[https://www.encyclis.com/financial-close-achieved-on-walsall-energy-from-waste-facility/ Encyclis News Item]</ref> anbd is designed for future [[CHP]] capability.


==Construction==
==Construction==
banneredit
3,643

edits