Created page with "{{#vardefine: epr|AP3832WS}} Category:EfW Plants An EfW facility based upon conventional combustion technology, Walsall Energy Recovery Facility has permitted operational capacity of 487,300 tonnes per annum with an expectation of 436,000 tonnes per annum <ref name='ref1'>https://www.encyclis.com/our-facilities/</ref>. It is located in Fryers Road, Walsall. {{EfWTemplate|EPR={{#var: epr}}|id=76}} File:Screenshot 2022-12-09 161032.png|350px|left|Artist Impre..."
 
Bin52 (talk | contribs)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
An [[EfW]] facility based upon conventional combustion technology, [[Walsall Energy Recovery Facility]] has permitted operational capacity of 487,300 tonnes per annum with an expectation of 436,000 tonnes per annum <ref name='ref1'>https://www.encyclis.com/our-facilities/</ref>. It is located in Fryers Road, Walsall.
An [[EfW]] facility based upon conventional combustion technology, [[Walsall Energy Recovery Facility]] has permitted operational capacity of 487,300 tonnes per annum with an expectation of 436,000 tonnes per annum <ref name='ref1'>https://www.encyclis.com/our-facilities/</ref>. It is located in Fryers Road, Walsall.
{{EfWTemplate|EPR={{#var: epr}}|id=76}}
{{EfWTemplate|EPR={{#var: epr}}|id=76}}
[[File:Screenshot 2022-12-09 161032.png|350px|left|Artist Impression of Walsall Energy Recovery Facility, All right reserved Encyclis]]__TOC__<br clear='left'/>
[[File:Picture Walsall.png|300px|left|Artist Impression of Walsall Energy Recovery Facility, All right reserved Encyclis]]__TOC__<br clear='left'/>


==Summary==
==Summary==
Line 12: Line 12:


==Construction==
==Construction==
The plant is under construction, having reachedf financial close in December 2023, with an expected start date in 2026<ref name = 'ref1'/>.  
The plant is under construction, having reached financial close in December 2023, with an expected start date in 2026<ref name = 'ref1'/>.


==Waste Input==
==Waste Input==

Latest revision as of 11:57, 17 February 2025

An EfW facility based upon conventional combustion technology, Walsall Energy Recovery Facility has permitted operational capacity of 487,300 tonnes per annum with an expectation of 436,000 tonnes per annum [1]. It is located in Fryers Road, Walsall.


Walsall Energy Recovery Facility
Under Construction
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence AP3832WS
Operator Encyclis (Walsall) Limited
Region West Midlands
Operational Capacity 478ktpa
Is site R1? fal
When was R1 Granted?
What was the R1 value 0.00
Electrical Capacity 49.90MWe
Number of Lines 2
Number of Turbines 1
CHP No
Technology Approach EfW
Funding Type [[]]

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN

Artist Impression of Walsall Energy Recovery Facility, All right reserved Encyclis
Artist Impression of Walsall Energy Recovery Facility, All right reserved Encyclis


Summary

An EfW facility based upon conventional combustion technology, Walsall Energy Recovery Facility has permitted operational capacity of 487,300 tonnes per annum with an expectation of 436,000 tonnes per annum[1].

Technology

The plant is to be delivered by Hitachi Zosen Inova under a Design & Build EPC-turnkey contract[1] - using a standard combustion technology, air cooled, Hitachi Zosen Inova Grate.

Construction

The plant is under construction, having reached financial close in December 2023, with an expected start date in 2026[1].

Waste Input

The plant is intended to run on residual Household Waste and Commercial Waste.