[[File:Baldovie EfW.jpg|280px|left|Baldovie EfW]]
In late 2017/early 2018, [[MVV Umvelt]] entered into a contract with [[Dundee City Council]] and [[Angus Council]] to take over and operate this existing energy from waste facility whilst building a new, modern facility next door ([[Dundee EfW CHP Facility]]) which became operational in January 2022. This WikiWaste page reports the two sites as one, as the operate under the same permit<ref>[https://www.mvv.de/en/about-us/group-of-companies/mvv-umwelt/shareholdings/mvv-environment-ltd/baldovie-efw-chp-facility MVV]</ref>.{{EfWTemplate|EPR={{#var: epr}}|id=34}}[[File:Baldovie EfW.jpg|280px|left|Baldovie EfW]][[File:Dundee EFW build.jpg|280px|left|Dundee EfW CHP Facility picture Standardkessel Baumgarte all rights reserved]]__TOC__<br clear='left' />
{{EfWTemplate|EPR=PPC/A/1003157|id=34}}
 
==Summary==
==Summary==
In Nov 2017, MVV entered into a contract with [[Dundee City Council]] and [[Angus Council]] to take over and operate this existing energy from waste facility whilst building a new, modern facility next door ([[Dundee EfW CHP Facility]]).<ref>[https://www.mvv.de/en/about-us/group-of-companies/mvv-umwelt/shareholdings/mvv-environment-ltd/baldovie-efw-chp-facility MVV]</ref>.
In late 2017/early 2018, [[MVV Umvelt]] entered into a contract with [[Dundee City Council]] and [[Angus Council]] to take over and operate this existing energy from waste facility whilst building a new, modern facility next door ([[Dundee EfW CHP Facility]]).<ref>[https://www.mvv.de/en/about-us/group-of-companies/mvv-umwelt/shareholdings/mvv-environment-ltd/baldovie-efw-chp-facility MVV]</ref>.


The facility first began operations in 1994 and receives 120,000 tonnes of waste a year collected from [[Dundee City Council|Dundee]], [[Angus Council|Angus]] and [[Aberdeenshire Council|Aberdeenshire]] areas. The facility primarily accepts [[Municipal Solid Waste]] and [[Household Waste]] but does allow some [[Commercial Waste]] to be treated.
The original facility receives 120,000 tonnes of waste a year collected from [[Dundee City Council|Dundee]], [[Angus Council|Angus]] and [[Aberdeenshire Council|Aberdeenshire]] areas and has a capacity of 150,000 tonnes per year. The facility primarily accepts [[Municipal Solid Waste]] and [[Household Waste]] but does allow some [[Commercial Waste]] to be treated on site into an [[RDF]] prior to combustion.


The plant is due to close when the new facility [[Dundee EfW CHP Facility]] becomes fully operational.
The plant is due to continue to late 2030 and run in parallel with the new plant, which became operational in January 2022 and has a processing capacity of 110,000 tonnes of waste per year.
==History==


==History==
The [[EFW]] plant at Baldovie was for many years the only municipal waste fired EfW plant in mainland Scotland. It suffered a major fire in 2012 and was later refurbished at a cost of £13.5m.<ref>[https://www.endswasteandbioenergy.com/article/1292662/uk-separation-upgrades-unnecessary-dundee-efw-plant ENDS]</ref>


The EFW plant at Baldovie was for many years the only municipal waste fired EfW plant in mainland Scotland. It suffered a major fire in 2012 and was later refurbished at a cost of £13.5m.<ref>[https://www.endswasteandbioenergy.com/article/1292662/uk-separation-upgrades-unnecessary-dundee-efw-plant ENDS]</ref>
It was previously owned and operated by Dundee Energy Recovery Ltd, a local authority owned company and formed part of a [[PFI]] with [[Dundee City Council]] and purchased by [[MVV Umwelt]] in November 2018.


It was previously owned and operated by Dundee Energy Recovery Ltd, a local authority owned company and formed part of a [[PFI]] with [[Dundee City Council]].
The new facility began construction in 2018 and was due to be operational at the end of 2020, first waste was reported through hopper in March 2021<ref>[https://www.linkedin.com/feed/update/urn:li:activity:6777665733691244544/?updateEntityUrn=urn%3Ali%3Afs_feedUpdate%3A%28V2%2Curn%3Ali%3Aactivity%3A6777665733691244544%29 Linked-in Post]</ref> with full operational handover completed in March 2022. Handover in the Annual report was recorded as January 2022<ref>Annual Report 2022</ref>.


==Plant==
==Plant==


The incineration process carried out by the plant handles mainly [[Household Waste]] and [[Commercial Waste]] in two 17 MW thermal input bubbling fluidised bed boilers (which at the time were the first in operation in the UK). The plant generates 10.5 MWe of electrical output with 8.3 MWe exported to the National Grid. The plant is designed to treat 120,000 tonnes of waste per year with each boiler capable of burning waste at a nominal design rate of 7.6 tonnes/hr per boiler.<ref>https://www2.gov.scot/resource/doc/1069/0005230.pdf</ref>
The incineration process carried out by the plant handles mainly [[Household Waste]] and [[Commercial Waste]] that has been processed into [[RDF]] on site prior to combustion in two 17 MW thermal input [[Fluidised Bed| bubbling fluidised bed]] boilers firing at 7.5 tonnes/hour (which at the time were the first in operation in the UK). The plant generates 10.5 MWe of electrical output with 8.3 MWe exported to the National Grid. Modifications to the plant since acquisition by [[MVV Umwelt]] in November 2018 led to an agreement in December 2020 to extend the operation of these two lines for 10 years (i.e. December 2030)<ref>https://www2.gov.scot/resource/doc/1069/0005230.pdf</ref><ref>Annual Report 2022</ref>.
 
The new facility is a moving [[grate]] technology and is located to south of the existing [[Fluidised Bed|fluidised bed]] plant. it has the capacity to supply 20 tonnes of steam due to be used as a source of heat for the near by Michelin tyre production factory (should it still be in operation once the facility becomes fully operational). The plant was fully commissioned and has been regulated since 1st January 2022 under the same permit as the existing plant. The building has been designed to measure 134m in length and 38m in height, with an exhaust stack measuring 90m.<ref>[https://www.letsrecycle.com/news/latest-news/mvv-secures-permission-for-dundee-erf Let's Recycle]/</ref>. The design, construction and commissioning of the plant was undertaken by [[Standardkessel Baumgarte GmbH]] under a full turnkey engineering, procurement and construction ([[EPC]]) contract.<ref>[https://bioenergyinternational.com/technology-suppliers/standardkessel-baumgarte-receives-order-waste-energy-chp-plant-dundee Bioenergy International]</ref>


==Local Authority Users==
The combined capacity of the 3 lines is 34 tonnes/hr with 54MWth and 20MWe<ref>Annual Report 2022</ref>.
The following data comes from [[WasteDataFlow]] for the financial year 2018/19 and represents those local authorities recorded as putting tonnage into the site (either directly or via a transfer station). The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the [[EA]] statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). A 'zero return' below indicates no local authority tonnage was recorded, most likely a result of the plant being recently commissioned and actually having received no tonnage. Equally, lower than expected tonnage maybe a result of either a new plant being in 'ramp up' towards full capacity after construction, or may be a result of plant shut down and subsequent re-start in a year.
 
{{#clear_external_data:}}
==Local Authority Data==
{{#get_db_data: db=engy
The [[Residual EfW]] pages for sites located in England and Wales capture the data reported by Local Authorities, through [[WasteDataFlow]], received at those sites. In Scotland this data is not reported, meaning that the destination in [[WasteDataFlow]] is not defined and the origin in the regulator returns for a facility receiving the tonnage is also not reported (resulting in a 'NA' in the table in the section below). As a result it is not possible to report for Scottish sites in the same way as other sites in WikiWaste.
|from=wdfincin|where=epr='PPC/A/1003157'|data=authority=authority,epr=epr,ton=ton}}
{{EAIn|EPR={{#var:epr}}}}
{|class="wikitable sortable"
! Authority
! Tonnage {{#for_external_table:<nowiki/>
{{!}}-
{{!}} [[{{{authority}}}]]
{{!}} {{{ton}}}
}}
|}
==References==
==References==
<references />
<references />