Welland Bio Power: Difference between revisions
mNo edit summary |
No edit summary |
||
(3 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
[[Category:Biomass EfW Plants]] | A [[Biomass EfW]] facility, [[Welland Bio Power]] is based on processing up to 72,000 tonnes per annum of [[Wood Waste]] producing 10.6 MWe gross power to be exported to the national grid after the facility’s own energy requirements are met<ref name="ref1" >CoGen, 2018. [https://www.cogenuk.com/projects Projects — Cogen. Online. CoGen. [Accessed 3 April 2020]].</ref>. | ||
{{BiomassPlant|NAME=Welland Bio Power|id=89}} | [[Category:Biomass EfW Plants]]{{#vardefine: epr|FP3701LZ}} | ||
[[File:Welland Bio Power.png|400px|left|Welland Bio Power. CoGen, 2018.]]__TOC__ | {{BiomassPlant|NAME=Welland Bio Power|id=89|EPR={{#var: epr}}}} | ||
[[File:Welland Bio Power.png|400px|left|Welland Bio Power. CoGen, 2018.]]<ref>[https://www.cogenuk.com/projects/ Welland Bio Power Site Photo]All Rights Reserved</ref>__TOC__ | |||
<br clear='left'/> | <br clear='left'/> | ||
==Summary== | ==Summary== | ||
A [[Biomass EfW]] facility, Welland Bio Power is based on processing up to 72,000 tonnes per annum of [[Wood Waste]] producing 10.6 MWe gross power to be exported to the national grid after the facility’s own energy requirements are met<ref name="ref1" | A [[Biomass EfW]] facility, [[Welland Bio Power]] is based on processing up to 72,000 tonnes per annum of [[Wood Waste]] producing 10.6 MWe gross power to be exported to the national grid after the facility’s own energy requirements are met<ref name="ref1"/>. | ||
The facility is located near Theddingworth in Northamptonshire. The [[Wood Waste]] feedstock is sourced locally through a contract with [[Welland Waste Management]]’s adjacent waste timber processing facility<ref name="ref1"/>. | The facility is located near Theddingworth in Northamptonshire. The [[Wood Waste]] feedstock is sourced locally through a contract with [[Welland Waste Management]]’s adjacent waste timber processing facility<ref name="ref1"/>. | ||
Welland Bio Power is operated by [[ | Welland Bio Power is operated by [[Welland Operations Ltd]] and was developed by [[CoGen]] in partnership with [[Welland Waste Management]]<ref name="ref1"/>. | ||
==Plant== | ==Plant== | ||
The facility utilises [[Nexterra]]’s fixed-bed updraft [[Gasification|gasification]] system technology, which is an [[Advanced Conversion Technology]]. [[MWH Treatment]] provided [[EPC]] services for the project<ref name="ref2" >Nexterra, 2015. [http://www.nexterra.ca/files/pdf/20150409-NexterraWelland.pdf Nexterra Consortium Reaches Financial Close On Biomass Gasification Plant In Northamptonshire, UK. Online. Nexterra.ca. [Accessed 3 April 2020]. | The facility utilises [[Nexterra]]’s fixed-bed updraft [[Gasification|gasification]] system technology, which is an [[Advanced Conversion Technology]]. [[MWH Treatment]] provided [[EPC]] services for the project<ref name="ref2" >Nexterra, 2015. [http://www.nexterra.ca/files/pdf/20150409-NexterraWelland.pdf Nexterra Consortium Reaches Financial Close On Biomass Gasification Plant In Northamptonshire, UK. Online. Nexterra.ca. [Accessed 3 April 2020]].</ref>. | ||
The facility cost £51.6 million to develop and was financed by [[Balfour Beatty Investments]], NOY Nexterra Holdings Limited Partnership (a partnership between [[NOY Infrastructure Fund]] and [[Nexterra]]) and [[Equitix MA Infrastructure Fund]]<ref name="ref2" />. | The facility cost £51.6 million to develop and was financed by [[Balfour Beatty Investments]], NOY Nexterra Holdings Limited Partnership (a partnership between [[NOY Infrastructure Fund]] and [[Nexterra]]) and [[Equitix MA Infrastructure Fund]]<ref name="ref2" />. | ||
The facility replicates its sister project [[Birmingham Bio Power]]. | The facility replicates its sister project [[Birmingham Bio Power]]. | ||
{{BioSustain|EPR={{#var: epr}}}} | |||
= | {{EAIn|EPR={{#var: epr}}}} | ||
The [[Wood Waste]] is exclusively supplied by [[Welland Waste Management]] which sources much of the [[Wood Waste]] from [[Waste Disposal Authorities]]. | |||
The [[Wood Waste]] is exclusively supplied by [[Welland Waste Management]] which sources much of the [[Wood Waste]] from [[Waste Disposal Authorities]] | |||
==References== | ==References== | ||
<references/> | <references/> |