3Rs Walsall: Difference between revisions
add page specific text |
No edit summary |
||
(One intermediate revision by the same user not shown) | |||
Line 2: | Line 2: | ||
An [[EfW]] facility based upon conventional combustion technology and which reached financial close and entered construction in December 2023. [[Walsall Energy Recovery Facility]] has a permit capacity of 478,300 tonnes and a forecast operational capacity of 436,000 tonnes per annum. The project is owned by [[Encyclis]] and was originally developed by BH Energy Gap as [[3R Walsall]]. {{EfWTemplate|EPR={{#var:epr}}|id=76}} | An [[EfW]] facility based upon conventional combustion technology and which reached financial close and entered construction in December 2023. [[Walsall Energy Recovery Facility]] has a permit capacity of 478,300 tonnes and a forecast operational capacity of 436,000 tonnes per annum. The project is owned by [[Encyclis]] and was originally developed by BH Energy Gap as [[3R Walsall]]. {{EfWTemplate|EPR={{#var:epr}}|id=76}} | ||
[[File: | [[File:Walsall EFW.jpg|350px|left|Image of Walsall EFW]]__TOC__<br clear='left' /> | ||
==Summary== | ==Summary== | ||
Line 8: | Line 8: | ||
==Technology== | ==Technology== | ||
The plant technology will comprise 2 lines of a standard moving grate technology, producing super-heated steam and 49MWe<ref>[https://www.encyclis.com/financial-close-achieved-on-walsall-energy-from-waste-facility/ Encyclis News Item]</ref>. | The plant technology will comprise 2 lines of a standard moving grate technology, producing super-heated steam and 49MWe<ref>[https://www.encyclis.com/financial-close-achieved-on-walsall-energy-from-waste-facility/ Encyclis News Item]</ref> anbd is designed for future [[CHP]] capability. | ||
==Construction== | ==Construction== |