Markley Group Biomass: Difference between revisions

Northern Chick (talk | contribs)
Additon of a different picture.
Northern Chick (talk | contribs)
→‎Plant: Additonal text.
Line 12: Line 12:


==Plant==
==Plant==
The plant was commissioned by UK-based Indusvent Limited; the system features a 2.1 MW hot water boiler manufactured by Danish based Justsen Energiteknik A/S<ref name="BIO" />. The burning of the waste wood in the boiler is controlled automatically to maximise efficiency with results monitored both on site and at the manufacturers premises in Denmark<ref name="BIO" />.
The plant was commissioned by UK-based Indusvent Limited who were instructed to design, supply and install a complete turnkey project whcih included a dust extraction and filtration system for production machinery, a sealed chipboard dust and chips transportation system, a 300m<sup>3</sup> storage silo with hydraulic moving floor discharge, shredding of off-cuts and burning of the collected material to provide hot water and heating for both the office and factory heating<ref>[http://www.indusvent.com/project-installations/biomass/energy-efficient-2-1-mw-biomass-plant-for-premiere-kitchens.aspx/ Indusvent]</ref>. The system features a 2.1 MW hot water boiler manufactured by Danish based Justsen Energiteknik A/S<ref name="BIO" />. The burning of the waste wood in the boiler is controlled automatically to maximise efficiency with results monitored both on site and at the manufacturers premises in Denmark<ref name="BIO" />.


==Local Authority Users==
==Local Authority Users==