Cauldon Cement Kiln: Difference between revisions

Bin52 (talk | contribs)
m add picture and link
Bin52 (talk | contribs)
m minor text changes
Line 22: Line 22:


==Waste Used on Site==
==Waste Used on Site==
The Cauldon site waste return to the [[EA]] for the most recent year of 2018 showed the following wastes used on site, which were used primary for the purpose of substituting fuel requirements in the plant:
The Cauldon site waste return to the [[EA]] for the most recent year of 2018 showed 58,741 tonnes of the following wastes used on site, which were used primary for the purpose of substituting fuel requirements in the plant:
{{CKWaste|EPR=TP3334AW}}
{{CKWaste|EPR=TP3334AW}}


==References==
==References==
<references />
<references />