Markinch Biomass CHP Plant: Difference between revisions

Northern Chick (talk | contribs)
→‎Summary: Addition of text
Northern Chick (talk | contribs)
No edit summary
Line 7: Line 7:


The owner and operator of the facility is RWE npower renewable, a susbsidiary of RWE Innogh's UK. The plant became operational at the end of 2012<ref name="POW">[https://www.power-technology.com/projects/markinchbiomassplant/ Power Technology]</ref>. The plant replaces the existing coal-fired plant at the paper mill site and required an investment of approximately £200m<ref name="POW" />. RWE, the owner and operator officially took over the site in November 2010<ref name="POW" />.
The owner and operator of the facility is RWE npower renewable, a susbsidiary of RWE Innogh's UK. The plant became operational at the end of 2012<ref name="POW">[https://www.power-technology.com/projects/markinchbiomassplant/ Power Technology]</ref>. The plant replaces the existing coal-fired plant at the paper mill site and required an investment of approximately £200m<ref name="POW" />. RWE, the owner and operator officially took over the site in November 2010<ref name="POW" />.
==Plant==
==Refernces==