Welland Bio Power: Difference between revisions
No edit summary |
|||
Line 17: | Line 17: | ||
A [[Biomass EfW]] facility based on 72,000 tonnes per annum of waste wood producing 10.6 MWe gross power to be exported to the national grid after the facility’s own energy requirements are met<ref name="ref1" >CoGen, 2018. [https://www.cogenuk.com/projects Projects — Cogen. Online. CoGen. [Accessed 3 April 2020].</ref>. | A [[Biomass EfW]] facility based on 72,000 tonnes per annum of waste wood producing 10.6 MWe gross power to be exported to the national grid after the facility’s own energy requirements are met<ref name="ref1" >CoGen, 2018. [https://www.cogenuk.com/projects Projects — Cogen. Online. CoGen. [Accessed 3 April 2020].</ref>. | ||
The facility is located | The facility is located near Theddingworth in Northamptonshire. The waste wood feedstock is sourced locally through a feedstock contract with Welland Waste Management’s adjacent waste timber processing facility<ref name="ref1"/>. | ||
Welland Bio Power is operated by Nexterra and was developed by CoGen in partnership with Welland Waste Management Limited. CoGen continues to provide management services<ref name="ref1"/>. | Welland Bio Power is operated by Nexterra and was developed by CoGen in partnership with Welland Waste Management Limited. CoGen continues to provide management services<ref name="ref1"/>. |