Tansterne: Difference between revisions

Northern Chick (talk | contribs)
No edit summary
Northern Chick (talk | contribs)
→‎Summary: Addition of text
Line 4: Line 4:
A Biomass Waste EFW facility located in Tansterne near Hullwhich is based on c.150,000 tonnes per annum of waste wood generating 22MW of electricity to the grid<ref name=>[https://solar21.ie/projects/biomass-21/ Solar 21 Biomass]</ref>.
A Biomass Waste EFW facility located in Tansterne near Hullwhich is based on c.150,000 tonnes per annum of waste wood generating 22MW of electricity to the grid<ref name=>[https://solar21.ie/projects/biomass-21/ Solar 21 Biomass]</ref>.


It is operated by [[Solar 21]] and became fully operational in Februaury 2018.
It was funded and developed by Irish renerwable energy company [[Solar 21]] in partnership with HRS Energy Ltd<ref>[https://www.letsrecycle.com/news/latest-news/probio-energy-wins-170000tpa-biomass-contract/ Lets Recycle]</ref>. The plant became fully operational in Februaury 2018.


The project is thought to have cost £35m<ref name="HRS">[https://bioenergyinternational.com/heat-power/hrs-start-work-35-million-tansterne-biomass-power-plant/ Bioenergy International]</ref>
The project is thought to have cost £35m<ref name="HRS">[https://bioenergyinternational.com/heat-power/hrs-start-work-35-million-tansterne-biomass-power-plant/ Bioenergy International]</ref>