Ofgem: Difference between revisions

Bin52 (talk | contribs)
add page specific text
 
Bin52 (talk | contribs)
m Update links
Line 14: Line 14:
* measures set out in a number of Energy Acts<ref>[https://www.ofgem.gov.uk/about-us/who-we-are Ofgem Website: Who we are]</ref>
* measures set out in a number of Energy Acts<ref>[https://www.ofgem.gov.uk/about-us/who-we-are Ofgem Website: Who we are]</ref>


Examples of key interactions with the waste and resource sector under point 4 above includes the regulation and delivery of the [[Renewable Obligation Order]], [[Contract for Difference]], [[Feed in Tariff]], and [[Renewable Heat Incentive]]. In respect of the demonstration of the renewable nature of the power generated (point 2 above, in respect of the different schemes in place) an annual sustainability report is required as part of demonstrating [[Biomass Sustainability]] and for larger projects this is measured on a monthly basis<ref>[https://www.ofgem.gov.uk/environmental-programmes/ro/applicants/biomass-sustainability Ofgem website: Biomass Sustainability]]</ref>.
Examples of key interactions with the waste and resource sector under point 4 above includes the regulation and delivery of the [[Renewables Obligation Order 2002|Renewables Obligation Order]], [[Contract for Difference]], [[Feed in Tariff]], and [[Renewable Heat Incentive]]. In respect of the demonstration of the renewable nature of the power generated (point 2 above, in respect of the different schemes in place) an annual sustainability report is required as part of demonstrating [[Biomass Sustainability]] and for larger projects this is measured on a monthly basis<ref>[https://www.ofgem.gov.uk/environmental-programmes/ro/applicants/biomass-sustainability Ofgem website: Biomass Sustainability]]</ref>.


==References==
==References==