Chilton Power Station: Difference between revisions
m tonnage data added |
add page specific text |
||
Line 10: | Line 10: | ||
==Plant== | ==Plant== | ||
The facility cost £40 million to develop<ref name="ref1" />. | The facility cost £40 million to develop<ref name="ref1" />. It has a design capacity of 14 tonnes per hour with a maximum annual consumption of 120,000 tonnes. This is at a continuous rating of 312 tonnes per day based on an average [[CV]] of 15 MJ/kg. The anticipated availability of 7,800 to 8,000 hours per annum (89%)<ref>Annual Performance Report 2021</ref>. | ||
==Tonnage Input/Fuel== | ==Tonnage Input/Fuel== |