Chilton Power Station: Difference between revisions

Bin52 (talk | contribs)
m tonnage data added
Bin52 (talk | contribs)
add page specific text
Line 10: Line 10:


==Plant==
==Plant==
The facility cost £40 million to develop<ref name="ref1" />.
The facility cost £40 million to develop<ref name="ref1" />. It has a design capacity of 14 tonnes per hour with a maximum annual consumption of 120,000 tonnes. This is at a continuous rating of 312 tonnes per day based on an average [[CV]] of 15 MJ/kg. The anticipated availability of 7,800 to 8,000 hours per annum (89%)<ref>Annual Performance Report 2021</ref>.


==Tonnage Input/Fuel==
==Tonnage Input/Fuel==