Landfill: Difference between revisions
Line 182: | Line 182: | ||
Landfill sites where all tipping has ceased and the all infrastructure for post-closure management has been installed are deemed "closed" following agreement with the EA. | Landfill sites where all tipping has ceased and the all infrastructure for post-closure management has been installed are deemed "closed" following agreement with the EA. | ||
The landfill operator is required to continue to maintain monitoring and management of the site post-closure until it can be shown to the satisfaction of the EA that the active management of the site by the operator is no longer required. Assessment of such a state is measured against criteria identified in WMP 26A and subsequent EA guidance. It is generally accepted for non-hazardous landfill sites that this is unlikely to be able to shown for at least 60 years post-closure, probably somewhat longer. This period is known as the '''aftercare''' period<br> | The landfill operator is required to continue to maintain monitoring and management of the site post-closure until it can be shown to the satisfaction of the EA that the active management of the site by the operator is no longer required. Assessment of such a state is measured against criteria identified in WMP 26A and subsequent EA guidance. It is generally accepted for non-hazardous landfill sites that this is unlikely to be able to shown for at least 60 years post-closure, probably somewhat longer. This period is known as the '''aftercare''' period.<br><br> | ||
There is published guidance on landfill permit surrender available, notably "Additional guidance for Landfill (EPR 5.02) and other permanent deposits of waste - How to surrender your environmental permit"<br> | There is published guidance on landfill permit surrender available, notably "Additional guidance for Landfill (EPR 5.02) and other permanent deposits of waste - How to surrender your environmental permit"<br> | ||