Waste Infrastructure Delivery Programme: Difference between revisions
m link update |
m minor text change |
||
Line 1: | Line 1: | ||
Established in 2006, the [[Waste Infrastructure Delivery Programme]] ([[WIDP]]) was intended to accelerate the delivery of [[residual waste]] treatment infrastructure such as [[Energy from Waste]] plants. | Established in 2006, the [[Waste Infrastructure Delivery Programme]] ([[WIDP]]) (and historically the [[Waste Infrastructure Initiative]] ([[WI]])) was intended to accelerate the delivery of [[residual waste]] treatment infrastructure such as [[Energy from Waste]] plants. | ||
[[Category:Arrangements]][[Category:Economics]] | [[Category:Arrangements]][[Category:Economics]] | ||