NESS Energy Project: Difference between revisions

From Wikiwaste
MCWaste (talk | contribs)
No edit summary
MCWaste (talk | contribs)
No edit summary
Line 2: Line 2:
[[Category:EfW Plants]][[Category:Tonnage & Waste Types]][[Category:Technologies & Solutions]]
[[Category:EfW Plants]][[Category:Tonnage & Waste Types]][[Category:Technologies & Solutions]]
{{EfWTemplate|EPR=Tbc#26|id=151}}
{{EfWTemplate|EPR=Tbc#26|id=151}}


==Summary==
==Summary==
Line 12: Line 19:


==Construction==
==Construction==
The construction firm Acconia is building the plant as the EPC contractor<ref name="ref1" />.
The construction firm Acconia is building the plant as the EPC contractor, having started construction in 2019<ref name="ref1" />.


==Waste Input==
==Waste Input==
The facility will use a feedstock of non-recyclable waste sourced from the local area<ref name="ref1" />.  
The facility will use a feedstock of household residual waste sourced from Aberdeen city, Moray and Aberdeenshire councils<ref name="ref1" />.  


==References==
==References==
<references />
<references />

Revision as of 10:23, 21 February 2020

Ness Energy Project. Lets Recycle, 2019.
Ness Energy Project. Lets Recycle, 2019.


Error: no local variable "site" has been set.
Error: no local variable "status" has been set.
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence Error: no local variable "epr" has been set.
Operator [[Error: no local variable "operator" has been set.]]
Region [[:Category:Error: no local variable "region" has been set.|Error: no local variable "region" has been set.]]
Operational Capacity Error: no local variable "cap" has been set.ktpa
Is site R1? Error: no local variable "r1" has been set.
When was R1 Granted? Error: no local variable "r1date" has been set.
What was the R1 value Error: no local variable "r1value" has been set.
Electrical Capacity Error: no local variable "mwe" has been set.MWe
Number of Lines Error: no local variable "line" has been set.
Number of Turbines Error: no local variable "turbine" has been set.
CHP Error: no local variable "chp" has been set.
Technology Approach Error: no local variable "techtype" has been set.
Funding Type [[Error: no local variable "funding" has been set.]]

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN





Summary

An EfW facility based upon conventional combustion technology, located at East Tullos industrial estate at the site of a former gas storage site in the south of Aberdeen. The facility is forecasted to have a capacity of 150,000 tonnes per annum and will export electricity to the national grid. It is expected that the facility will become operational by August 2022[1].

In 2015, Aberdeen city, Moray and Aberdeenshire councils decided to collaborate to put in place a long-term waste management solution for the area, issuing the tender notice early in 2017. In March 2019, Acciona were chosen as the preferred bidder to construct the facility, working alongside the local authorities and waste firm Indaver, which is contracted to operate the plant for 20 years once operational[2].

Technology

The EfW will utilise moving-grate combustion technology[1].

Construction

The construction firm Acconia is building the plant as the EPC contractor, having started construction in 2019[1].

Waste Input

The facility will use a feedstock of household residual waste sourced from Aberdeen city, Moray and Aberdeenshire councils[1].

References