Milton Keynes Waste Recovery Park: Difference between revisions
Arctellion (talk | contribs) No edit summary |
Arctellion (talk | contribs) No edit summary |
||
Line 1: | Line 1: | ||
[[File:Milton Keynes.png|280px|left|Amey Cespa Milton Keynes Waste Recovery Park]] | [[File:Milton Keynes.png|280px|left|Amey Cespa Milton Keynes Waste Recovery Park]] | ||
[[Category:EfW Plants | [[Category:EfW Plants]] | ||
{{EfWTemplate|EPR=UP3937ZZ|id=39}} | {{EfWTemplate|EPR=UP3937ZZ|id=39}} | ||
Revision as of 21:04, 1 March 2020
Error: no local variable "site" has been set. Error: no local variable "status" has been set. | |
See Residual EfW → page for a larger UK Wide map. | |
Waste Licence | Error: no local variable "epr" has been set. |
Operator | [[Error: no local variable "operator" has been set.]] |
Region | [[:Category:Error: no local variable "region" has been set.|Error: no local variable "region" has been set.]] |
Operational Capacity | Error: no local variable "cap" has been set.ktpa |
Is site R1? | Error: no local variable "r1" has been set. |
When was R1 Granted? | Error: no local variable "r1date" has been set. |
What was the R1 value | Error: no local variable "r1value" has been set. |
Electrical Capacity | Error: no local variable "mwe" has been set.MWe |
Number of Lines | Error: no local variable "line" has been set. |
Number of Turbines | Error: no local variable "turbine" has been set. |
CHP | Error: no local variable "chp" has been set. |
Technology Approach | Error: no local variable "techtype" has been set. |
Funding Type | [[Error: no local variable "funding" has been set.]] |
Operators Annual Report
Input Data
Year | HH | C&I | Clin | RDF | Total |
---|---|---|---|---|---|
2016 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
2017 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
2018 | 71493.20 | 203.80 | 0.00 | 0.00 | 75340.46 |
2019 | 112486.00 | 0.00 | 0.00 | 0.00 | 115863.00 |
2020 | 117088.00 | 0.00 | 0.00 | 0.00 | 120404.00 |
2021 | 113573.00 | 0.00 | 0.00 | 0.00 | 116609.00 |
2022 | 108124.00 | 0.00 | 0.00 | 0.00 | 111969.00 |
Output Data
Year | IBA | IBA %ge of Tot IN | APC | APC %ge of Tot IN |
---|---|---|---|---|
2016 | 0.00 | 0.00% | 0.00 | 0.00% |
2017 | 0.00 | 0.00% | 0.00 | 0.00% |
2018 | 4387.64 | 5.82% | 1523.67 | 2.02% |
2019 | 12760.00 | 11.01% | 3131.00 | 2.70% |
2020 | 11044.00 | 9.17% | 3412.00 | 2.83% |
2021 | 10900.00 | 9.35% | 2886.00 | 2.47% |
2022 | 11473.00 | 10.25% | 3062.00 | 2.73% |
Summary
An integrated EfW facility with other treatment technologies, with the EfW based upon Gasification technology and not yet considered an ERF based on not having R1 status. The EfW element of the facility at Milton Keynes has permitted operational capacity of 90,000 tonnes per annum, operated by AmeyCespa and owned by Milton Keynes Council.
History
The Milton Keynes facility was built as an integrated solution primarily to service a 15 year PPP contract with Milton Keynes Council signed in June 2013 to process around 130,000 tonnes per annum via the different technologies on site . The facility diverts around 140,000 tonnes per annum from Landfill via a combination of Mechanical Biological Treatment including Anaerobic Digestion, with the RDF output sent to the ATT/Gasification facility with a capacity listed of 90,000 tonnes per annum and power output of 6MWe [1].
Plant
A Design, Build, Operate contract with AmeyCespa (with Volker Fitzpatrick as Amey's civil engineering partner) which started in Spring 2014 and which was commissioned in summer 2018. The Gasification technology was delivered by Energos, and AmeyCespa had to step in when the technology company went into liquidation in 2016 (which also impacted upon the Glasgow and Sinfin Lane facilities).
Local Authority Users
The following data comes from WasteDataFlow for the financial year 2018/19 and represents those local authorities recorded as putting tonnage into the site (either directly or via a transfer station). The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the EA statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). A 'zero return' below indicates no local authority tonnage was recorded, most likely a result of the plant being recently commissioned and actually having received no tonnage. Equally, lower than expected tonnage maybe a result of either a new plant being in 'ramp up' towards full capacity after construction, or may be a result of plant shut down and subsequent re-start in a year.
Authority | Tonnage |
---|