A [[Biomass EfW]] facility, [[Welland Bio Power]] is based on processing up to 72,000 tonnes per annum of [[Wood Waste]] producing 10.6 MWe gross power to be exported to the national grid after the facility’s own energy requirements are met<ref name="ref1" >CoGen, 2018. [https://www.cogenuk.com/projects Projects — Cogen. Online. CoGen. [Accessed 3 April 2020]].</ref>.
[[Category:Biomass EfW Plants]]{{#vardefine: epr|AP3432QC}}
[[Category:Biomass EfW Plants]]{{#vardefine: epr|AP3432QC}}
{{BiomassPlant|NAME=Welland Bio Power Ltd|id=89|EPR={{#var: epr}}}}
{{BiomassPlant|NAME=Welland Bio Power|id=89|EPR={{#var: epr}}}}
[[File:Welland Bio Power.png|400px|left|Welland Bio Power. CoGen, 2018.]]__TOC__
[[File:Welland Bio Power.png|400px|left|Welland Bio Power. CoGen, 2018.]]<ref>[https://www.cogenuk.com/projects/ Welland Bio Power Site Photo]All Rights Reserved</ref>__TOC__
<br clear='left'/>
<br clear='left'/>
<ref>[https://www.cogenuk.com/projects/ Welland Bio Power Site Photo]All Rights Reserved</ref>


==Summary==
==Summary==
A [[Biomass EfW]] facility, Welland Bio Power is based on processing up to 72,000 tonnes per annum of [[Wood Waste]] producing 10.6 MWe gross power to be exported to the national grid after the facility’s own energy requirements are met<ref name="ref1" >CoGen, 2018. [https://www.cogenuk.com/projects Projects — Cogen. Online. CoGen. [Accessed 3 April 2020]].</ref>.
A [[Biomass EfW]] facility, [[Welland Bio Power]] is based on processing up to 72,000 tonnes per annum of [[Wood Waste]] producing 10.6 MWe gross power to be exported to the national grid after the facility’s own energy requirements are met<ref name="ref1"/>.


The facility is located near Theddingworth in Northamptonshire. The [[Wood Waste]] feedstock is sourced locally through a contract with [[Welland Waste Management]]’s adjacent waste timber processing facility<ref name="ref1"/>.
The facility is located near Theddingworth in Northamptonshire. The [[Wood Waste]] feedstock is sourced locally through a contract with [[Welland Waste Management]]’s adjacent waste timber processing facility<ref name="ref1"/>.
Line 18: Line 18:


The facility replicates its sister project [[Birmingham Bio Power]].
The facility replicates its sister project [[Birmingham Bio Power]].
 
{{BioSustain|EPR={{#var: epr}}}}
==Tonnage Input/Fuel==
{{EAIn|EPR={{#var: epr}}}}
The tonnage received by the plant is reported as [[Wood Waste]] in the most recent [[Annual Sustainability Report]] for 2018-19<ref>[https://www.ofgem.gov.uk/publications-and-updates/biomass-sustainability-dataset-2018-19 Biomass Sustainability Dataset 2018-19]</ref>. Because the plant is an [[Advanced Conversion Technology]] and produces a [[Syngas]] the sustainability report talks in terms of the gas input to the energy recovery system, rather than the unprocessed [[Wood Waste]] into the plant, which was 305,783,697 cubic meters.
The [[Wood Waste]] is exclusively supplied by [[Welland Waste Management]] which sources much of the [[Wood Waste]] from [[Waste Disposal Authorities]].  
The [[Wood Waste]] is exclusively supplied by [[Welland Waste Management]] which sources much of the [[Wood Waste]] from [[Waste Disposal Authorities]]. The [[Wood Waste]] tonnage received and recorded in the [[EA]] statistics for the calendar year (i.e. January 2018 to December 2018) was '''9,190''' tonnes.  