! Location !! Project/Site !! Classification !! Status !! Capacity <ref> the capacity has been reproduced from the DEFRA data, but has not been verified in this table, | ! Location !! Project/Site !! Classification !! Status !! Capacity <ref> the capacity has been reproduced from the DEFRA data, but has not been verified in this table, and in some cases is known to be incorrect</ref> (ktpa) !! Plant Type !! Comment | ||
|- | |- | ||
| Avonmouth || New Earth Solutions || [[PPP]] || | | Avonmouth || New Earth Solutions || [[PPP]] || Uncertain <ref> Future of site uncertain, still operational to contract handover, but site up for sale as of Jan 2020</ref> || 372 || [[MBT]] || Bought out of administration by [[Beauparc]],currently services [[West of England]], contracts lost to [[Suez]] and [[Viridor]] from March 2020 | ||
|- | |- | ||
| Avonmouth || New Earth Energy || [[PPP]] || Mothballed<ref name="moth">In original data site was listed as operational this has been changed to Mothballed.</ref> || 73 || [[EfW]] || [[RDF]] from Avonmouth MBT fed this plant, technology failed, currently mothballed | | Avonmouth || New Earth Energy || [[PPP]] || Mothballed<ref name="moth">In original data site was listed as operational this has been changed to Mothballed.</ref> || 73 || [[EfW]] || [[RDF]] from Avonmouth MBT fed this plant, technology failed, currently mothballed | ||
|- | |- | ||
| Basingstoke || [[Chineham]] | | Basingstoke || [[Chineham]] || [[PPP]] || Operational || 99 || EfW || [[Veolia]] site for [[Hampshire County Council]] and partners under [[Project Integra]] | ||
|- | |- | ||
| Birmingham || [[Landor Street]] || [[PPP]] || Operational || 165 || MBT || Example | | Birmingham || [[Landor Street]] || [[PPP]] || Operational || 165 || MBT || Example | ||
Line 18: | Line 18: | ||
| Birmingham || [[Tyseley]] || [[PPP]] || Operational || 361 || [[EfW]] || [[Veolia]] site towards its end of life | | Birmingham || [[Tyseley]] || [[PPP]] || Operational || 361 || [[EfW]] || [[Veolia]] site towards its end of life | ||
|- | |- | ||
| Bolton|| [[Raikes Lane]] || [[PFI]] || Operational || 86 || [[EfW]] || | | Bolton|| [[Raikes Lane]] || [[PFI]] || Operational || 86 || [[EfW]] || [[Viridor]] [[Laing]] consortium [[GMWA]] contract terminated 2017, now [[Suez]] from June 2019 for 7 years | ||
|- | |- | ||
| Buckinghamshire || [[Greatmoor]] || [[PPP]] || Operational || 300 || [[EfW]] || [[FCC]] site | | Buckinghamshire || [[Greatmoor]] || [[PPP]] || Operational || 300 || [[EfW]] || [[FCC]] site | ||
Line 38: | Line 38: | ||
| [[ELWA]] 1 || [[Frog Island]] || [[PFI]] || Operational || 180 || [[MBT]] || [[Renewi]] site servicing [[ELWA]], recently reported financial difficulty | | [[ELWA]] 1 || [[Frog Island]] || [[PFI]] || Operational || 180 || [[MBT]] || [[Renewi]] site servicing [[ELWA]], recently reported financial difficulty | ||
|- | |- | ||
| [[ELWA]] 2 || [[Jenkins Lane]] || [[PFI]] || Operational || 180 || [[MBT]] || | | [[ELWA]] 2 || [[Jenkins Lane]] || [[PFI]] || Operational || 180 || [[MBT]] || [[Renewi]] site servicing [[ELWA]], recently reported financial difficulty | ||
|- | |- | ||
| East Sussex || [[Newhaven]] || [[PFI]] || Operational || 234 || [[EfW]] || Servicing [[East Sussex County Council]] and [[Brighton and Hove City Council]] | | East Sussex || [[Newhaven]] || [[PFI]] || Operational || 234 || [[EfW]] || Servicing [[East Sussex County Council]] and [[Brighton and Hove City Council]] | ||
|- | |- | ||
| Essex || [[Courtauld Road]] || [[PFI]] || Operational<ref name="op" /> || 417 || [[MBT]] || | | Essex || [[Courtauld Road]] || [[PFI]] || Operational<ref name="op" /> || 417 || [[MBT]] || Contract operated by [[Urbaser Balfour Beatty]] servicing [[Essex County Council]] and [[Southend-on-Sea Council]], reported operational difficulties | ||
|- | |- | ||
| Exeter || [[Marsh Barton]] || [[PPP]] || Operational || 60 || [[EfW]] || [[Viridor]] site | | Exeter || [[Marsh Barton]] || [[PPP]] || Operational || 60 || [[EfW]] || [[Viridor]] site | ||
Line 50: | Line 50: | ||
| Gloucestershire || [[Javelin Park]] || [[PPP]] || Operational<ref name="op" /> || 190 || [[EfW]] || Example | | Gloucestershire || [[Javelin Park]] || [[PPP]] || Operational<ref name="op" /> || 190 || [[EfW]] || Example | ||
|- | |- | ||
| Greater Manchester || [[Longley Lane]] || [[PFI]] || | | Greater Manchester || [[Longley Lane]] || [[PFI]] || Operational || 110 || [[MBT]] || [[Viridor]] [[Laing]] consortium contract with [[GMWA]] terminated 2017, now [[Suez]] from June 2019 for 7 years | ||
|- | |- | ||
| Greater Manchester || [[Runcorn Phase 1]] || [[PFI]] || Operational || 325 || [[EfW]] || | | Greater Manchester || [[Runcorn Phase 1]] || [[PFI]] || Operational || 325 || [[EfW]] || [[Viridor]] bought out [[Laing]] in Nov 2018 and continues to operate contract with [[GMWA]] to 2035 (with option to extend) despite termination of wider PFI | ||
|- | |- | ||
| Greater Manchester || [[N. Manchester]] || [[PFI]] || | | Greater Manchester || [[N. Manchester]] || [[PFI]] || Operational || 65 || [[MBT]] || [[Viridor]] [[Laing]] consortium contract with [[GMWA]] terminated 2017, now [[Suez]] from June 2019 for 7 years | ||
|- | |- | ||
| Greater Manchester || [[Oldham]] || [[PFI]] || | | Greater Manchester || [[Oldham]] || [[PFI]] || Operational || 99|| [[MBT]] || [[Viridor]] [[Laing]] consortium contract with [[GMWA]] terminated 2017, now [[Suez]] from June 2019 for 7 years | ||
|- | |- | ||
| Greater Manchester || [[Salford]] || [[PFI]] || | | Greater Manchester || [[Salford]] || [[PFI]] || Operational || 73 || [[MBT]] || [[Viridor]] [[Laing]] consortium contract with [[GMWA]] terminated 2017, now [[Suez]] from June 2019 for 7 years | ||
|- | |- | ||
| Greater Manchester || [[Stockport]] || [[PFI]] || | | Greater Manchester || [[Stockport]] || [[PFI]] || Operational || 92 || [[MBT]] || [[Viridor]] [[Laing]] consortium contract with [[GMWA]] terminated 2017, now [[Suez]] from June 2019 for 7 years | ||
|- | |- | ||
| Hartlepool || [[Tees Valley Lines 1 &2]] || [[PPP]] || Operational || 345 || [[EfW]] || Example | | Hartlepool || [[Tees Valley Lines 1 &2]] || [[PPP]] || Operational || 345 || [[EfW]] || Example | ||
Line 110: | Line 110: | ||
| Peterborough || [[Fourth Drove, Fengate]] || [[PPP]] || Operational || 85 || [[EfW]] || [[Viridor]] site | | Peterborough || [[Fourth Drove, Fengate]] || [[PPP]] || Operational || 85 || [[EfW]] || [[Viridor]] site | ||
|- | |- | ||
| Portsmouth || [[Portsmouth Project Integra]] || [[PPP]] || Operational || 198 || [[EfW]] || [[Veolia]] site | | Portsmouth || [[Portsmouth Project Integra]] || [[PPP]] || Operational || 198 || [[EfW]] || [[Veolia]] site for [[Hampshire County Council]] and partners under [[Project Integra]] | ||
|- | |- | ||
| Rugby || [[Malpass Farm]] || [[PPP]] || Operational || 200 || [[MBT]] || Example | | Rugby || [[Malpass Farm]] || [[PPP]] || Operational || 200 || [[MBT]] || Example | ||
Line 118: | Line 118: | ||
| Shropshire || [[Battlefield Enterprise Park]] || [[PFI]] || Operational || 90 || [[EfW]] || Example | | Shropshire || [[Battlefield Enterprise Park]] || [[PFI]] || Operational || 90 || [[EfW]] || Example | ||
|- | |- | ||
| S.E. London || [[SELCHP]] || [[PPP]] || Operational || 431 || [[EfW]] || [[Veolia]] site | | S.E. London || [[SELCHP]] || [[PPP]] || Operational || 431 || [[EfW]] || [[Veolia]] site taking waste from [[Lewisham]], [[Greenwich]], [[Westminster]] and [[Bromley]] | ||
|- | |- | ||
| S. London || [[Beddington Lane]]|| [[PPP]] || Operational<ref name="op" /> ||300 || [[EfW]] || [[Viridor]] site | | S. London || [[Beddington Lane]]|| [[PPP]] || Operational<ref name="op" /> ||300 || [[EfW]] || [[Viridor]] site | ||
Line 128: | Line 128: | ||
| South Yorkshire || [[Bolton Road, Manvers]] || [[PFI]] ||Operational || 286 || [[MBT]] || Example | | South Yorkshire || [[Bolton Road, Manvers]] || [[PFI]] ||Operational || 286 || [[MBT]] || Example | ||
|- | |- | ||
| Southampton || [[Marchwood Project Integra]] || [[PPP]] || Operational || 198 || [[EfW]] || [[Veolia]] site | | Southampton || [[Marchwood Project Integra]] || [[PPP]] || Operational || 198 || [[EfW]] || [[Veolia]] site for [[Hampshire County Council]] and partners under [[Project Integra]] | ||
|- | |- | ||
| Staffordshire || [[Four Ashes]] || [[PFI]] || Operational || 325 || [[EfW]] || Example | | Staffordshire || [[Four Ashes]] || [[PFI]] || Operational || 325 || [[EfW]] || Example |
Revision as of 17:37, 21 January 2020
In its desire to stimulate investment in waste infrastructure, and underpin the diversion of BMW waste from Landfill, the Government supported/subsidized a range of treatment technologies on a number of sites that were procured by Waste Disposal Authorities needing this infrastructure through a dedicated long term Private Finance Initiative (PFI). This arrangement has now ceased, several schemes which were to have been funded had their funding removed after DEFRA assessed [1] that the BMW targets could be met with the infrastructure funded to that date, and several are currently being considered by Waste Disposal Authorities for movement out of PFI after consideration of the cost benefit of continuing with the contract.
The table below is an extract from DEFRA data [2] summarizing the residual waste projects that are/were PFI and PPP projects:
Location | Project/Site | Classification | Status | Capacity [3] (ktpa) | Plant Type | Comment |
---|---|---|---|---|---|---|
Avonmouth | New Earth Solutions | PPP | Uncertain [4] | 372 | MBT | Bought out of administration by Beauparc,currently services West of England, contracts lost to Suez and Viridor from March 2020 |
Avonmouth | New Earth Energy | PPP | Mothballed[5] | 73 | EfW | RDF from Avonmouth MBT fed this plant, technology failed, currently mothballed |
Basingstoke | Chineham | PPP | Operational | 99 | EfW | Veolia site for Hampshire County Council and partners under Project Integra |
Birmingham | Landor Street | PPP | Operational | 165 | MBT | Example |
Birmingham | Tyseley | PPP | Operational | 361 | EfW | Veolia site towards its end of life |
Bolton | Raikes Lane | PFI | Operational | 86 | EfW | Viridor Laing consortium GMWA contract terminated 2017, now Suez from June 2019 for 7 years |
Buckinghamshire | Greatmoor | PPP | Operational | 300 | EfW | FCC site |
Cambridgeshire | Waterbeach | PFI | Operational[6] | 200 | MBT | Amey Cespa site with variable performance reported, planning being pursued for new EfW on the site |
Cornwall | St. Dennis | PFI | Operational | 240 | EfW | Suez site |
Coventry | Coventry EFW | PPP | Operational | 245 | EfW | Example |
Cumbria | Hespin Wood | PPP | Mothballed[5] | 66 | MBT | Example |
Cumbria | Barrow-in-Furness | PPP | Mothballed | 50 | MBT | Example |
Derbyshire | Sinfin Lane | PPP | In Construction | 190 | EfW | Recent termination of contract after delays in commissioning |
Dudley | Lister Road | PPP | Operational | 93 | EfW | Example |
ELWA 1 | Frog Island | PFI | Operational | 180 | MBT | Renewi site servicing ELWA, recently reported financial difficulty |
ELWA 2 | Jenkins Lane | PFI | Operational | 180 | MBT | Renewi site servicing ELWA, recently reported financial difficulty |
East Sussex | Newhaven | PFI | Operational | 234 | EfW | Servicing East Sussex County Council and Brighton and Hove City Council |
Essex | Courtauld Road | PFI | Operational[6] | 417 | MBT | Contract operated by Urbaser Balfour Beatty servicing Essex County Council and Southend-on-Sea Council, reported operational difficulties |
Exeter | Marsh Barton | PPP | Operational | 60 | EfW | Viridor site |
Ferrybridge | Multifuel 1 (FM1) | PPP | Operational | 400 | EfW | Example |
Gloucestershire | Javelin Park | PPP | Operational[6] | 190 | EfW | Example |
Greater Manchester | Longley Lane | PFI | Operational | 110 | MBT | Viridor Laing consortium contract with GMWA terminated 2017, now Suez from June 2019 for 7 years |
Greater Manchester | Runcorn Phase 1 | PFI | Operational | 325 | EfW | Viridor bought out Laing in Nov 2018 and continues to operate contract with GMWA to 2035 (with option to extend) despite termination of wider PFI |
Greater Manchester | N. Manchester | PFI | Operational | 65 | MBT | Viridor Laing consortium contract with GMWA terminated 2017, now Suez from June 2019 for 7 years |
Greater Manchester | Oldham | PFI | Operational | 99 | MBT | Viridor Laing consortium contract with GMWA terminated 2017, now Suez from June 2019 for 7 years |
Greater Manchester | Salford | PFI | Operational | 73 | MBT | Viridor Laing consortium contract with GMWA terminated 2017, now Suez from June 2019 for 7 years |
Greater Manchester | Stockport | PFI | Operational | 92 | MBT | Viridor Laing consortium contract with GMWA terminated 2017, now Suez from June 2019 for 7 years |
Hartlepool | Tees Valley Lines 1 &2 | PPP | Operational | 345 | EfW | Example |
Herefordshire | Hartlebury | PPP | In Construction | 200 | EfW | Example |
Hertfordshire | Hoddesdon | PPP | Post Close | 320 | EfW | Example |
Isle of Wight | Isle of Wight Gasification | PPP | In Construction | 40 | EfW | Example |
Isle of Wight | Isle of Wight WM Project | PPP | Operational | 80 | MBT | Example |
Kent | Allington | PPP | Operational | 427 | EfW | FCC site servicing Kent County Council |
Kirklees | Vine Street | PFI | Operational | 127 | EfW | Example |
Colnbrook | Lakeside | PPP | Operational | 436 | EfW | Viridor and Grundon Joint Venture which will require moving to accommodate Heathrow 3rd runway |
Leeds | Cross Green | PFI | Operational | 165 | EfW | Veolia site |
Leicstershire | Mowmacre Hill | PFI | Operational | 165 | EfW | Example |
Leicstershire | Cotesbach | PPP | Operational | 50 | MBT | Example |
Lincolnshire | North Hykeham | PPP | Operational | 154 | EfW | Example |
L.B. Southwark | Old Kent Road | PFI | Operational | 100 | MBT | Example |
Merseyside | Wilton | PPP | Operational[6] | 440 | EfW | Suez site in Teeside, waste hauled by rail from Merseyside transfer station |
Milton Keynes | Wolverton | PPP | In Construction]] | 80 | EfW | Example |
NE Lincolnshire | Stallingborough | PPP | Operational | 53 | EfW | Example |
Newcastle | Byker/Ellington | PPP | Operational | 187 | [MBT]] | Example |
North London | Edmonton | PPP | Operational | 512 | EfW | NLWA site, currently going through planning process to be replaced as at end of life |
North Somerset | BOOMECO Avonmouth | PPP | Operational | 50 | MBT | Bought by Veolia out of administration, serviced North Somerset Council but based in Avonmouth Docks, RDF export focused |
North Yorkshire | Allerton | PPP | Operational[6] | 320 | EfW | Example |
Nottingham | Eastcroft 3rd Line | PPP | Consented | 140 | EfW | Example |
Nottingham | Eastcroft | PPP | Operational | 158 | EfW | Example |
Oxfordshire | Ardley | PPP | Operational | 300 | EfW | Viridor site |
Peterborough | Fourth Drove, Fengate | PPP | Operational | 85 | EfW | Viridor site |
Portsmouth | Portsmouth Project Integra | PPP | Operational | 198 | EfW | Veolia site for Hampshire County Council and partners under Project Integra |
Rugby | Malpass Farm | PPP | Operational | 200 | MBT | Example |
Sheffield | Bernard Road | PPP | Operational | 207 | EfW | Was part of wider Veolia contract, now EfW plant has been separated out |
Shropshire | Battlefield Enterprise Park | PFI | Operational | 90 | EfW | Example |
S.E. London | SELCHP | PPP | Operational | 431 | EfW | Veolia site taking waste from Lewisham, Greenwich, Westminster and Bromley |
S. London | Beddington Lane | PPP | Operational[6] | 300 | EfW | Viridor site |
South Tyne & Wear | Teeside Lines 4&5 | PFI | Operational | 256 | EfW | Example |
South Devon | Devonport | PFI | Operational | 245 | EfW | Am MVV project |
South Yorkshire | Bolton Road, Manvers | PFI | Operational | 286 | MBT | Example |
Southampton | Marchwood Project Integra | PPP | Operational | 198 | EfW | Veolia site for Hampshire County Council and partners under Project Integra |
Staffordshire | Four Ashes | PFI | Operational | 325 | EfW | Example |
Stoke on Trent | Campbell Road | PPP | Operational | 174 | EfW | Example |
Suffolk | Great Blakenham | PFI | Operational | 269 | EfW | Example |
Surrey | Charlton Lane Eco Park | PFI | In Construction | 60 | EfW | Example |
Swindon | Chaney Manor | PPP | Operational | 48 | MBT | Example |
Wakefield | South Kirby | PFI | Operational | 146 | MBT | Example |
West London | Severnside Avonmouth | PPP | Operational | 350 | EfW | Suez site in Avonmouth, supplied by train from a transfer in West London for WLWA, plus some local waste including West of England |
West Sussex | Brookhurst Wood | PPP | In Construction | 327 | MBT | Example |
Western Riverside | Belvedere | PPP | Operational | 688 | EfW | Cory site in Bexley, supplied by river from two transfer stations for WRWA, plus some local tonnage for Bexely Council |
Whites Pit, Poole | Canford | PPP | Operational | 50 | MBT | Example |
Wiltshire | Northacre Farm | PPP | Operational | 60 | MBT | Hills site at Westbury |
Wolverhampton | Crown Street EFW | PPP | Operational | 108 | EfW | Example |
References
- ↑ DEFRA Waste Infrastructure Delivery Programme
- ↑ DEFRA Residual Waste Treatment Infrastructure Project List dated 31st December 2016 but noted as last updated 29th March 2019 (edited with press updates)
- ↑ the capacity has been reproduced from the DEFRA data, but has not been verified in this table, and in some cases is known to be incorrect
- ↑ Future of site uncertain, still operational to contract handover, but site up for sale as of Jan 2020
- ↑ 5.0 5.1 In original data site was listed as operational this has been changed to Mothballed.
- ↑ 6.0 6.1 6.2 6.3 6.4 6.5 In original data site was listed as In Construction this has been changed to Operational.