{| class="wikitable" | {| class="wikitable" | ||
|- | |- | ||
! Location !! Project/Site !! Classification !! Status !! Capacity <ref> | ! Location !! Project/Site !! Classification !! Status !! Capacity <ref> The capacity has been reproduced from the [[DEFRA]] data, but has not been verified in this table, and in some cases is known not to be up to date</ref> (ktpa) !! Plant Type !! Comment | ||
|- | |- | ||
| Avonmouth || New Earth Solutions || [[PPP]] || Uncertain <ref> Future of site uncertain, still operational to contract handover, but site up for sale as of Jan 2020</ref> || 372 || [[MBT]] || Bought out of administration by [[ | | Avonmouth || New Earth Solutions || [[PPP]] || Uncertain <ref> Future of site uncertain, still operational to contract handover, but site up for sale as of Jan 2020</ref> || 372 || [[MBT]] || Bought out of administration by [[PandaGreen]],currently services [[West of England Partnership | West of England]], contracts lost to [[Suez]] and [[Viridor]] from March 2020 | ||
|- | |- | ||
| Avonmouth || New Earth Energy || [[PPP]] || Mothballed<ref name="moth">In original data site was listed as operational this has been changed to Mothballed.</ref> || 73 || [[EfW]] || [[RDF]] from Avonmouth MBT fed this plant, technology failed, currently mothballed | | Avonmouth || New Earth Energy || [[PPP]] || Mothballed<ref name="moth">In original data site was listed as operational this has been changed to Mothballed.</ref> || 73 || [[EfW]] || [[RDF]] from Avonmouth MBT fed this plant, technology failed, currently mothballed | ||
Line 42: | Line 42: | ||
| East Sussex || [[Newhaven]] || [[PFI]] || Operational || 234 || [[EfW]] || Servicing [[East Sussex County Council]] and [[Brighton and Hove City Council]] | | East Sussex || [[Newhaven]] || [[PFI]] || Operational || 234 || [[EfW]] || Servicing [[East Sussex County Council]] and [[Brighton and Hove City Council]] | ||
|- | |- | ||
| Essex || [[Courtauld Road]] || [[PFI]] || Operational<ref name="op" /> || 417 || [[MBT]] || | | Essex || [[Courtauld Road]] || [[PFI]] || Operational<ref name="op" /> || 417 || [[MBT]] || Developed and operated by partners [[Urbaser Balfour Beatty]] servicing [[Essex County Council]] and [[Southend-on-Sea Borough Council | Southend]], reported operational difficulties | ||
|- | |- | ||
| Exeter || [[Marsh Barton]] || [[PPP]] || Operational || 60 || [[EfW]] || Developed and operated by [[Viridor]] in partnership with [[Devon County Council]] with a focus on Exeter and the immediate surrounds | | Exeter || [[Marsh Barton]] || [[PPP]] || Operational || 60 || [[EfW]] || Developed and operated by [[Viridor]] in partnership with [[Devon County Council]] with a focus on Exeter and the immediate surrounds | ||
|- | |- | ||
| Ferrybridge || [[Multifuel 1]] (FM1) || [[PPP]] || Operational || 400 || [[EfW]] || | | Ferrybridge || [[Multifuel 1]] (FM1) || [[PPP]] || Operational || 400 || [[EfW]] || Joint Venture between [[Wheelabrator]] and [[SSE]], includes [[Cumbria County Council | Cumbria]] via their contract with [[Renewi]] for [[RDF]] from their [[MBT]] facilities | ||
|- | |- | ||
| Gloucestershire || [[Javelin Park]] || [[PPP]] || Operational<ref name="op" /> || 190 || [[EfW]] || | | Gloucestershire || [[Javelin Park]] || [[PPP]] || Operational<ref name="op" /> || 190 || [[EfW]] || Delivery by partners [[Urbaser Balfour Beatty]] primarily serving [[Gloucestershire County Council | Gloucestershire]] | ||
|- | |- | ||
| Greater Manchester || [[Longley Lane]] || [[PFI]] || Operational || 110 || [[MBT]] || [[Viridor]] [[Laing]] consortium [[PFI]] contract with [[Greater Manchester Combined Authority | GMWA]] terminated 2017, now [[Suez]] from June 2019 for 7 years | | Greater Manchester || [[Longley Lane]] || [[PFI]] || Operational || 110 || [[MBT]] || [[Viridor]] [[Laing]] consortium [[PFI]] contract with [[Greater Manchester Combined Authority | GMWA]] terminated 2017, now [[Suez]] from June 2019 for 7 years | ||
Line 62: | Line 62: | ||
| Greater Manchester || [[Stockport]] || [[PFI]] || Operational || 92 || [[MBT]] || [[Viridor]] [[Laing]] consortium [[PFI]] contract with [[Greater Manchester Combined Authority | GMWA]] terminated 2017, now [[Suez]] from June 2019 for 7 years | | Greater Manchester || [[Stockport]] || [[PFI]] || Operational || 92 || [[MBT]] || [[Viridor]] [[Laing]] consortium [[PFI]] contract with [[Greater Manchester Combined Authority | GMWA]] terminated 2017, now [[Suez]] from June 2019 for 7 years | ||
|- | |- | ||
| Hartlepool || [[Tees Valley Lines 1 &2]] || [[PPP]] || Operational || 345 || [[EfW]] || | | Hartlepool || [[Tees Valley Lines 1 &2]] || [[PPP]] || Operational || 345 || [[EfW]] || Operated by [[Suez]] receiving [[Residual Waste | waste]] from several local authorities in the North-East, primarily for [[Northumberland Council | Northumberland]] | ||
|- | |- | ||
| Herefordshire || [[Hartlebury]] || [[PPP]] || In Construction || 200 || [[EfW]] || [[Severn Waste Services]] operated plant, owned by [[FCC]] and [[Urbaser]], 25 year contract for [[Herefordshire Council | Herefordshire]] and [[Worcestershire County Council | Worcestershire]] to 2023 | | Herefordshire || [[Hartlebury]] || [[PPP]] || In Construction || 200 || [[EfW]] || [[Severn Waste Services]] operated plant, owned by [[FCC]] and [[Urbaser]], 25 year contract for [[Herefordshire Council | Herefordshire]] and [[Worcestershire County Council | Worcestershire]] to 2023 | ||
|- | |- | ||
| Hertfordshire || [[Hoddesdon]] || [[PPP]] || | | Hertfordshire || [[Hoddesdon]] || [[PPP]] || Terminated <ref> The project was called in at a very late stage by the secretary of state and refused planning consent after strong local opposition, leading to the termination of the long term residual waste contract between [[Hertfordshire County Council | Hertfordshire]] and [[Veolia]] reported in Aug 2019</ref> || 320 || [[EfW]] || Long term contract with [[Hertfordshire County Council | Hertfordshire]] terminated | ||
|- | |- | ||
| Isle of Wight || [[Isle of Wight]] [[Gasification]] || [[PPP]] ||In Construction || 40 || [[EfW]] || | | Isle of Wight || [[Isle of Wight]] [[Gasification]] || [[PPP]] ||In Construction || 40 || [[EfW]] || Development between [[Amey]] and [[Isle of Wight Council]], delays in commissioning reported to early 2020 | ||
|- | |- | ||
| Isle of Wight || [[Isle of Wight WM Project]] || [[PPP]] ||Operational ||80 || [[MBT]] || | | Isle of Wight || [[Isle of Wight WM Project]] || [[PPP]] ||Operational ||80 || [[MBT]] || Development between [[Amey]] and [[Isle of Wight Council]] | ||
|- | |- | ||
| Kent || [[Allington]] || [[PPP]] || Operational || 427 || [[EfW]] || [[FCC]] site servicing primarily [[Kent County Council]] | | Kent || [[Allington]] || [[PPP]] || Operational || 427 || [[EfW]] || [[FCC]] site servicing primarily [[Kent County Council]] | ||
|- | |- | ||
| Kirklees || [[Vine Street]] || [[PFI]] || Operational || 127 || [[EfW]] || | | Kirklees || [[Vine Street]] || [[PFI]] || Operational || 127 || [[EfW]] || [[Suez]] operated site primarily for [[Kirklees Metropolitan Council | Kirklees]] | ||
|- | |- | ||
| Colnbrook || [[Lakeside]] || [[PPP]] || Operational || 436 || [[EfW]] || [[Viridor]] and [[Grundon]] Joint Venture which will require moving to accommodate Heathrow 3rd runway | | Colnbrook || [[Lakeside]] || [[PPP]] || Operational || 436 || [[EfW]] || [[Viridor]] and [[Grundon]] Joint Venture which will require moving to accommodate Heathrow 3rd runway | ||
Line 80: | Line 80: | ||
| Leeds || [[Cross Green]] || [[PFI]] || Operational || 165 || [[EfW]] || Site developed by [[Veolia]] on behalf of [[Leeds City Council]] under a 25 year contract to 2037 | | Leeds || [[Cross Green]] || [[PFI]] || Operational || 165 || [[EfW]] || Site developed by [[Veolia]] on behalf of [[Leeds City Council]] under a 25 year contract to 2037 | ||
|- | |- | ||
| Leicstershire || [[Mowmacre Hill]] || [[PFI]] || Operational || 165 || [[EfW]] || [[ | | Leicstershire || [[Mowmacre Hill]] || [[PFI]] || Operational || 165 || [[EfW]] || [[Leicester City Council]] | ||
|- | |- | ||
| Leicstershire || [[Cotesbach]] || [[PPP]] || Operational || 50 || [[MBT]] || [[ | | Leicstershire || [[Cotesbach]] || [[PPP]] || Operational || 50 || [[MBT]] || Operational plant by New Earth Solutions bought out of administration by [[PandaGreen]],currently services [[Leicestershire County Council]] | ||
|- | |- | ||
| Lincolnshire || [[North Hykeham]] || [[PPP]] || Operational || 154 || [[EfW]] || | | Lincolnshire || [[North Hykeham]] || [[PPP]] || Operational || 154 || [[EfW]] || [[FCC]] facility primarily for [[Lincolnshire County Council]] under 25 year contract | ||
|- | |- | ||
| L.B. Southwark ||[[Old Kent Road]] || [[PFI]] || Operational || 100 || [[MBT]] || [[Southwark London Borough | Southwark]] | | L.B. Southwark ||[[Old Kent Road]] || [[PFI]] || Operational || 100 || [[MBT]] || [[Southwark London Borough | Southwark]] | ||
Line 148: | Line 148: | ||
| Western Riverside || [[Belvedere]] || [[PPP]] || Operational || 688 || [[EfW]] || [[Cory]] site in Bexley, supplied by river from two transfer stations for [[Western Riverside Waste Disposal Authority | WRWA]], plus some local tonnage for [[Bexley London Borough Council | Bexely]] | | Western Riverside || [[Belvedere]] || [[PPP]] || Operational || 688 || [[EfW]] || [[Cory]] site in Bexley, supplied by river from two transfer stations for [[Western Riverside Waste Disposal Authority | WRWA]], plus some local tonnage for [[Bexley London Borough Council | Bexely]] | ||
|- | |- | ||
| Whites Pit, Poole || [[Canford]] || [[PPP]] || Operational || 50 || [[MBT]] || [[ | | Whites Pit, Poole || [[Canford]] || [[PPP]] || Operational || 50 || [[MBT]] || Operational plant by New Earth Solutions bought out of administration by [[PandaGreen]],currently primarily services [[Bournemouth, Christchurch and Poole |Bournemouth ]] | ||
|- | |- | ||
| Wiltshire || [[Northacre Farm]] || [[PPP]] || Operational || 60 || [[MBT]] || [[Hills]] site at Westbury | | Wiltshire || [[Northacre Farm]] || [[PPP]] || Operational || 60 || [[MBT]] || [[Hills]] site at Westbury |
Revision as of 08:34, 23 January 2020
In its desire to stimulate investment in waste infrastructure, and underpin the diversion of BMW waste from Landfill, the Government supported/subsidized a range of treatment technologies on a number of sites that were procured by Waste Disposal Authorities needing this infrastructure through a dedicated long term Private Finance Initiative (PFI). This arrangement has now ceased, several schemes which were to have been funded had their funding removed after DEFRA assessed [1] that the BMW targets could be met with the infrastructure funded to that date, and several are currently being considered by Waste Disposal Authorities for movement out of PFI after consideration of the cost benefit of continuing with the contract and several that have been removed (i.e. Lancashire) or have had closed with major restructure (i.e. Sheffield and Greater Manchester).
The table below is an extract from DEFRA data [2] summarizing the residual waste projects that are/were PFI and PPP projects with additional commentary/notes added:
Location | Project/Site | Classification | Status | Capacity [3] (ktpa) | Plant Type | Comment |
---|---|---|---|---|---|---|
Avonmouth | New Earth Solutions | PPP | Uncertain [4] | 372 | MBT | Bought out of administration by PandaGreen,currently services West of England, contracts lost to Suez and Viridor from March 2020 |
Avonmouth | New Earth Energy | PPP | Mothballed[5] | 73 | EfW | RDF from Avonmouth MBT fed this plant, technology failed, currently mothballed |
Basingstoke | Chineham | PPP | Operational | 99 | EfW | Veolia site for Hampshire County Council and partners under Project Integra |
Birmingham | Landor Street | PPP | Mothballed[5] | 165 | MBT | Suez facility producing SRF moved to their site in Rugby, to supply Cemex cement kiln in Rugby |
Birmingham | Tyseley | PPP | Operational | 361 | EfW | Veolia operated site, towards its end of life, contract to 2021(?), tender for new operator thereafter(?) |
Bolton | Raikes Lane | PFI | Operational | 86 | EfW | Viridor Laing consortium GMWA contract terminated 2017, now Suez from June 2019 for 7 years |
Buckinghamshire | Greatmoor | PPP | Operational | 300 | EfW | FCC site primarily servicing Buckinghamshire under a 30 year residual waste contract from 2012 |
Cambridgeshire | Waterbeach | PFI | Operational[6] | 200 | MBT | Amey Cespa site with variable performance reported, planning being pursued for new EfW on the site |
Cornwall | St. Dennis | PFI | Operational | 240 | EfW | Suez site (Cornwall Energy Recovery) part of an integrated contract with Cornwall Council to 2039 |
Coventry | Coventry EFW | PPP[7] | Operational | 245 | EfW | Operated by CSWDC taking waste from Coventryand Solihull. |
Cumbria | Hespin Wood | PPP | Mothballed[5] | 66 | MBT | Renewi 25 year contract from 2009 for Cumbria reported as under financial difficulty [8] |
Cumbria | Barrow-in-Furness | PPP | Mothballed | 50 | MBT | Renewi 25 year contract from 2009 for Cumbria reported as under financial difficulty |
Derbyshire | Sinfin Lane | PPP | Uncertain [9] | 190 | EfW | Termination of contract reported Aug. '19 between Derby City Council and Derbyshire County Council and Renewi |
Dudley | Lister Road | PPP | Operational | 93 | EfW | Operated by MES Environmental |
ELWA 1 | Frog Island | PFI | Operational | 180 | MBT | Renewi site servicing ELWA, recently reported financial difficulty |
ELWA 2 | Jenkins Lane | PFI | Operational | 180 | MBT | Renewi site servicing ELWA, recently reported financial difficulty |
East Sussex | Newhaven | PFI | Operational | 234 | EfW | Servicing East Sussex County Council and Brighton and Hove City Council |
Essex | Courtauld Road | PFI | Operational[6] | 417 | MBT | Developed and operated by partners Urbaser Balfour Beatty servicing Essex County Council and Southend, reported operational difficulties |
Exeter | Marsh Barton | PPP | Operational | 60 | EfW | Developed and operated by Viridor in partnership with Devon County Council with a focus on Exeter and the immediate surrounds |
Ferrybridge | Multifuel 1 (FM1) | PPP | Operational | 400 | EfW | Joint Venture between Wheelabrator and SSE, includes Cumbria via their contract with Renewi for RDF from their MBT facilities |
Gloucestershire | Javelin Park | PPP | Operational[6] | 190 | EfW | Delivery by partners Urbaser Balfour Beatty primarily serving Gloucestershire |
Greater Manchester | Longley Lane | PFI | Operational | 110 | MBT | Viridor Laing consortium PFI contract with GMWA terminated 2017, now Suez from June 2019 for 7 years |
Greater Manchester | Runcorn Phase 1 | PFI | Operational | 325 | EfW | Viridor bought out Laing in Nov 2018 and continues to operate under contract with GMWA to 2035[10] |
Greater Manchester | N. Manchester | PFI | Operational | 65 | MBT | Viridor Laing consortium PFI contract with GMWA terminated 2017, now Suez from June 2019 for 7 years |
Greater Manchester | Oldham | PFI | Operational | 99 | MBT | Viridor Laing consortium PFI contract with GMWA terminated 2017, now Suez from June 2019 for 7 years |
Greater Manchester | Salford | PFI | Operational | 73 | MBT | Viridor Laing consortium PFI contract with GMWA terminated 2017, now Suez from June 2019 for 7 years |
Greater Manchester | Stockport | PFI | Operational | 92 | MBT | Viridor Laing consortium PFI contract with GMWA terminated 2017, now Suez from June 2019 for 7 years |
Hartlepool | Tees Valley Lines 1 &2 | PPP | Operational | 345 | EfW | Operated by Suez receiving waste from several local authorities in the North-East, primarily for Northumberland |
Herefordshire | Hartlebury | PPP | In Construction | 200 | EfW | Severn Waste Services operated plant, owned by FCC and Urbaser, 25 year contract for Herefordshire and Worcestershire to 2023 |
Hertfordshire | Hoddesdon | PPP | Terminated [11] | 320 | EfW | Long term contract with Hertfordshire terminated |
Isle of Wight | Isle of Wight Gasification | PPP | In Construction | 40 | EfW | Development between Amey and Isle of Wight Council, delays in commissioning reported to early 2020 |
Isle of Wight | Isle of Wight WM Project | PPP | Operational | 80 | MBT | Development between Amey and Isle of Wight Council |
Kent | Allington | PPP | Operational | 427 | EfW | FCC site servicing primarily Kent County Council |
Kirklees | Vine Street | PFI | Operational | 127 | EfW | Suez operated site primarily for Kirklees |
Colnbrook | Lakeside | PPP | Operational | 436 | EfW | Viridor and Grundon Joint Venture which will require moving to accommodate Heathrow 3rd runway |
Leeds | Cross Green | PFI | Operational | 165 | EfW | Site developed by Veolia on behalf of Leeds City Council under a 25 year contract to 2037 |
Leicstershire | Mowmacre Hill | PFI | Operational | 165 | EfW | Leicester City Council |
Leicstershire | Cotesbach | PPP | Operational | 50 | MBT | Operational plant by New Earth Solutions bought out of administration by PandaGreen,currently services Leicestershire County Council |
Lincolnshire | North Hykeham | PPP | Operational | 154 | EfW | FCC facility primarily for Lincolnshire County Council under 25 year contract |
L.B. Southwark | Old Kent Road | PFI | Operational | 100 | MBT | Southwark |
Merseyside | Wilton | PPP | Operational[6] | 440 | EfW | Suez site in Teeside, waste hauled by rail from Merseyside transfer station under contract with MWDA |
Milton Keynes | Wolverton | PPP | In Construction | 80 | EfW | Example |
NE Lincolnshire | Stallingborough | PPP | Operational | 53 | EfW | Example |
Newcastle | Byker/Ellington | PPP | Operational | 187 | [MBT]] | Example |
North London | Edmonton | PPP | Operational | 512 | EfW | NLWA site, currently going through planning process to be replaced as at end of life |
North Somerset | BOOMECO Avonmouth | PPP | Operational | 50 | MBT | Boomecho bought by Veolia out of administration, serviced North Somerset Council but based in Avonmouth Docks, RDF export focused |
North Yorkshire | Allerton | PPP | Operational[6] | 320 | EfW | Example |
Nottingham | Eastcroft 3rd Line | PPP | Consented | 140 | EfW | Example |
Nottingham | Eastcroft | PPP | Operational | 158 | EfW | Example |
Oxfordshire | Ardley | PPP | Operational | 300 | EfW | Viridor site |
Peterborough | Fourth Drove, Fengate | PPP | Operational | 85 | EfW | Viridor site |
Portsmouth | Portsmouth Project Integra | PPP | Operational | 198 | EfW | Veolia site for Hampshire County Council and partners under Project Integra |
Rugby | Malpass Farm | PPP | Operational | 200 | MBT | Example |
Sheffield | Bernard Road | PPP | Operational | 207 | EfW | Was part of wider 35 year contract with Veolia to 2036, now EfW contract only with termination of wider contract in 2017 |
Shropshire | Battlefield Enterprise Park | PFI | Operational | 90 | EfW | Site developed by Veolia as part of a 25 year contract with Shropshire County Council |
S.E. London | SELCHP | PPP | Operational | 431 | EfW | Veolia site taking waste from Lewisham, Greenwich, Westminster and Bromley |
S. London | Beddington Lane | PPP | Operational[6] | 300 | EfW | Viridor site |
South Tyne & Wear | Teeside Lines 4&5 | PFI | Operational | 256 | EfW | Example |
South Devon | Devonport | PFI | Operational | 245 | EfW | Am MVV project |
South Yorkshire | Bolton Road, Manvers | PFI | Operational | 286 | MBT | Example |
Southampton | Marchwood Project Integra | PPP | Operational | 198 | EfW | Veolia site for Hampshire County Council and partners under Project Integra |
Staffordshire | Four Ashes | PFI | Operational | 325 | EfW | Veolia operated site for Staffordshire County Council, 25 year contract from July 2010, with inputs also from Sandwell, Warkwickshire and Walsall |
Stoke on Trent | Campbell Road | PPP | Operational | 174 | EfW | Operated by MES Environmental |
Suffolk | Great Blakenham | PFI | Operational | 269 | EfW | Example |
Surrey | Charlton Lane Eco Park | PFI | In Construction | 60 | EfW | Example |
Swindon | Chaney Manor | PPP | Operational | 48 | MBT | Example |
Wakefield | South Kirby | PFI | Operational | 146 | MBT | Example |
West London | Severnside Avonmouth | PPP | Operational | 350 | EfW | Suez site in Avonmouth, supplied by train from a transfer in West London for WLWA, plus some local waste including West of England |
West Sussex | Brookhurst Wood | PPP | In Construction | 327 | MBT | Example |
Western Riverside | Belvedere | PPP | Operational | 688 | EfW | Cory site in Bexley, supplied by river from two transfer stations for WRWA, plus some local tonnage for Bexely |
Whites Pit, Poole | Canford | PPP | Operational | 50 | MBT | Operational plant by New Earth Solutions bought out of administration by PandaGreen,currently primarily services Bournemouth |
Wiltshire | Northacre Farm | PPP | Operational | 60 | MBT | Hills site at Westbury |
Wolverhampton | Crown Street EFW | PPP | Operational | 108 | EfW | Operated by MES Environmental |
References
- ↑ DEFRA Waste Infrastructure Delivery Programme
- ↑ DEFRA Residual Waste Treatment Infrastructure Project List dated 31st December 2016 but noted as last updated 29th March 2019 (edited with press updates)
- ↑ The capacity has been reproduced from the DEFRA data, but has not been verified in this table, and in some cases is known not to be up to date
- ↑ Future of site uncertain, still operational to contract handover, but site up for sale as of Jan 2020
- ↑ 5.0 5.1 5.2 In original data site was listed as operational this has been changed to Mothballed.
- ↑ 6.0 6.1 6.2 6.3 6.4 6.5 In original data site was listed as In Construction this has been changed to Operational.
- ↑ A new PFI agreed in 2009 to replace the original plant and to include Warwickshire has not progressed to date
- ↑ Letsrecycle article re: Carlisle EfW and context of current PPP contract
- ↑ After issues with the initial commissioning of the MBT part of the project, there were then extended delays in commissioning the EfW portion of contract - plant delivery/final commissioning is presently unclear
- ↑ As part of the restructuring of the PFI contract, with option to extend
- ↑ The project was called in at a very late stage by the secretary of state and refused planning consent after strong local opposition, leading to the termination of the long term residual waste contract between Hertfordshire and Veolia reported in Aug 2019