Private Finance Initiative: Difference between revisions

From Wikiwaste
Bin52 (talk | contribs)
m add page specific text
Bin52 (talk | contribs)
m edit specific text
Line 8: Line 8:
! Location !! Project/Site !! Classification !! Status !! Capacity <ref> The capacity has been reproduced from the [[DEFRA]] data, but has not been verified in this table, and in some cases is known not to be up to date</ref> (ktpa) !! Plant Type !! Comment
! Location !! Project/Site !! Classification !! Status !! Capacity <ref> The capacity has been reproduced from the [[DEFRA]] data, but has not been verified in this table, and in some cases is known not to be up to date</ref> (ktpa) !! Plant Type !! Comment
|-
|-
| Avonmouth || New Earth Solutions || [[PPP]] || Uncertain <ref> Future of site uncertain, still operational to contract handover, but site up for sale as of Jan 2020</ref> || 372 || [[MBT]] || Bought out of administration by [[PandaGreen]],currently services [[West of England Partnership | West of England]], contracts lost to [[Suez]] and [[Viridor]] from March 2020
|-
| Avonmouth || New Earth Energy || [[PPP]] || Mothballed<ref name="moth">In original data site was listed as operational this has been changed to Mothballed.</ref> || 73 || [[EfW]] || [[RDF]] from Avonmouth MBT fed this plant, technology failed, currently mothballed
|-
| Basingstoke || [[Chineham]] || [[PPP]] || Operational || 99 || EfW || [[Veolia]] site for [[Hampshire County Council]] and partners under [[Project Integra]]
|-
| Birmingham || [[Landor Street]] || [[PPP]] || Mothballed<ref name="moth" /> || 165 || MBT || [[Suez]] facility producing [[SRF]] moved to their site in Rugby, to supply [[Cemex]] cement kiln in Rugby
|-
| Birmingham || [[Tyseley]] || [[PPP]] || Operational || 361 || [[EfW]] || [[Veolia]] operated site, towards its end of life, contract to 2021(?), tender for new operator thereafter(?)
|-
|-
| Bolton|| [[Raikes Lane]] || [[PFI]] || Operational || 86 || [[EfW]] || [[Viridor]] [[Laing]] consortium [[Greater Manchester Combined Authority | GMWA]] contract terminated 2017, now [[Suez]] from June 2019 for 7 years
| Bolton|| [[Raikes Lane]] || [[PFI]] || Operational || 86 || [[EfW]] || [[Viridor]] [[Laing]] consortium [[Greater Manchester Combined Authority | GMWA]] contract terminated 2017, now [[Suez]] from June 2019 for 7 years
|-
| Buckinghamshire || [[Greatmoor]] || [[PPP]] || Operational || 300 || [[EfW]] || [[FCC]] site primarily servicing [[Buckinghamshire County Council | Buckinghamshire]] under a 30 year [[Residual Waste |residual waste]] contract from 2012
|-
|-
| Cambridgeshire || [[Waterbeach]] || [[PFI]] || Operational<ref name="op">In original data site was listed as In Construction this has been changed to Operational.</ref> || 200 || [[MBT]] || [[Amey Cespa]] site with variable performance reported, planning being pursued for new [[EfW]] on the site
| Cambridgeshire || [[Waterbeach]] || [[PFI]] || Operational<ref name="op">In original data site was listed as In Construction this has been changed to Operational.</ref> || 200 || [[MBT]] || [[Amey Cespa]] site with variable performance reported, planning being pursued for new [[EfW]] on the site
|-
|-
| Cornwall || [[St. Dennis]] || [[PFI]] || Operational || 240 || [[EfW]] || [[Suez]] site ([[Cornwall Energy Recovery]]) part of an integrated contract with [[ Cornwall Council | Cornwall ]] to 2039
| Cornwall || [[St. Dennis]] || [[PFI]] || Operational || 240 || [[EfW]] || [[Suez]] site ([[Cornwall Energy Recovery]]) part of an integrated contract with [[ Cornwall Council | Cornwall ]] to 2039
|-
| Coventry || [[Coventry EFW]] || [[PPP]]<ref>A new PFI agreed in 2009 to replace the original plant and to include [[Warwickshire County Council |Warwickshire]] has not progressed to date</ref> || Operational || 245 || [[EfW]] || Operated by [[The Coventry and Solihull Waste Disposal Company Limited | CSWDC]] taking waste from [[Coventry City Council | Coventry]]and [[Solihull Metropolitan Borough Council | Solihull]].
|-
| Cumbria || [[Hespin Wood]] || [[PPP]] || Mothballed<ref name="moth" />|| 66 || [[MBT]] || [[Shanks | Renewi]] 25 year contract from 2009 for [[Cumbria County Council | Cumbria]] reported as under financial difficulty <ref> [https://www.letsrecycle.com/news/latest-news/carlisle-efw-proposed-as-part-of-cumbria-waste-plan/ Letsrecycle article re: Carlisle EfW and context of current PPP contract]</ref>
|- 
| Cumbria || [[Barrow-in-Furness]]|| [[PPP]] || Mothballed || 50 || [[MBT]] || [[Shanks | Renewi]] 25 year contract from 2009 for [[Cumbria County Council | Cumbria]] reported as under financial difficulty
|-
| Derbyshire || [[Sinfin Lane]] || [[PPP]] || Uncertain <ref> After issues with the initial commissioning of the MBT part of the project, there were then extended delays in commissioning the [[EfW]] portion of contract - plant delivery/final commissioning is presently unclear </ref>  || 190 || [[EfW]] || Termination of contract reported Aug. '19 between [[Derby City Council]] and [[Derbyshire County Council]] and [[Renewi]]
|-
| Dudley || [[Lister Road]] || [[PPP]] || Operational || 93 || [[EfW]] || Operated by [[MES Environmental]]
|-
|-
| [[ELWA]] 1 || [[Frog Island]] || [[PFI]] || Operational || 180 || [[MBT]] || [[Renewi]] site servicing [[East London Waste Disposal Authority | ELWA]], recently reported financial difficulty
| [[ELWA]] 1 || [[Frog Island]] || [[PFI]] || Operational || 180 || [[MBT]] || [[Renewi]] site servicing [[East London Waste Disposal Authority | ELWA]], recently reported financial difficulty
Line 43: Line 22:
|-
|-
| Essex || [[Courtauld Road]] || [[PFI]] || Operational<ref name="op" /> || 417 || [[MBT]] || Developed and operated by partners [[Urbaser Balfour Beatty]] servicing [[Essex County Council]] and [[Southend-on-Sea Borough Council | Southend]], reported operational difficulties
| Essex || [[Courtauld Road]] || [[PFI]] || Operational<ref name="op" /> || 417 || [[MBT]] || Developed and operated by partners [[Urbaser Balfour Beatty]] servicing [[Essex County Council]] and [[Southend-on-Sea Borough Council | Southend]], reported operational difficulties
|-
| Exeter || [[Marsh Barton]] || [[PPP]] || Operational || 60 || [[EfW]] || Developed and operated by [[Viridor]] in partnership with [[Devon County Council]] with a focus on Exeter and the immediate surrounds
|-
| Ferrybridge || [[Multifuel 1]] (FM1) || [[PPP]] || Operational || 400 || [[EfW]] || Joint Venture between [[Wheelabrator]] and [[SSE]], includes [[Cumbria County Council | Cumbria]] via their contract with [[Renewi]] for [[RDF]] from their [[MBT]] facilities
|-
| Gloucestershire || [[Javelin Park]] || [[PPP]] || Operational<ref name="op" /> || 190 || [[EfW]] || Delivery by partners [[Urbaser Balfour Beatty]] primarily serving [[Gloucestershire County Council | Gloucestershire]]
|-
|-
| Greater Manchester || [[Longley Lane]] || [[PFI]] || Operational || 110 || [[MBT]] || [[Viridor]] [[Laing]] consortium [[PFI]] contract with [[Greater Manchester Combined Authority | GMWA]] terminated 2017, now [[Suez]] from June 2019 for 7 years
| Greater Manchester || [[Longley Lane]] || [[PFI]] || Operational || 110 || [[MBT]] || [[Viridor]] [[Laing]] consortium [[PFI]] contract with [[Greater Manchester Combined Authority | GMWA]] terminated 2017, now [[Suez]] from June 2019 for 7 years
Line 61: Line 34:
|-
|-
| Greater Manchester || [[Stockport]] || [[PFI]] || Operational || 92 || [[MBT]] || [[Viridor]] [[Laing]] consortium [[PFI]] contract with [[Greater Manchester Combined Authority | GMWA]] terminated 2017, now [[Suez]] from June 2019 for 7 years
| Greater Manchester || [[Stockport]] || [[PFI]] || Operational || 92 || [[MBT]] || [[Viridor]] [[Laing]] consortium [[PFI]] contract with [[Greater Manchester Combined Authority | GMWA]] terminated 2017, now [[Suez]] from June 2019 for 7 years
|-
| Hartlepool || [[Tees Valley Lines 1 &2]] || [[PPP]] || Operational || 345 || [[EfW]] || Operated by [[Suez]] receiving [[Residual Waste | waste]] from several local authorities in the North-East, primarily for [[Northumberland Council | Northumberland]]
|-
| Herefordshire || [[Hartlebury]] || [[PPP]] || In Construction || 200 || [[EfW]] || [[Severn Waste Services]] operated plant, owned by [[FCC]] and [[Urbaser]], 25 year contract for [[Herefordshire Council | Herefordshire]] and [[Worcestershire County Council | Worcestershire]] to 2023
|-
| Hertfordshire || [[Hoddesdon]] || [[PPP]] || Terminated <ref> The project was called in at a very late stage by the secretary of state and refused planning consent after strong local opposition, leading to the termination of the long term residual waste contract between [[Hertfordshire County Council | Hertfordshire]] and [[Veolia]] reported in Aug 2019</ref> || 320 || [[EfW]] || Long term contract with [[Hertfordshire County Council | Hertfordshire]] terminated
|-
| Isle of Wight || [[Isle of Wight]] [[Gasification]] || [[PPP]] ||In Construction || 40 || [[EfW]] || Development between [[Amey]] and [[Isle of Wight Council]], delays in commissioning reported to early 2020
|-
| Isle of Wight || [[Isle of Wight WM Project]] || [[PPP]] ||Operational  ||80 || [[MBT]] || Development between [[Amey]] and [[Isle of Wight Council]]
|-
| Kent || [[Allington]] || [[PPP]] || Operational || 427 || [[EfW]] || [[FCC]] site servicing primarily [[Kent County Council]]
|-
|-
| Kirklees || [[Vine Street]] || [[PFI]] || Operational || 127 || [[EfW]] || [[Suez]] operated site primarily for [[Kirklees Metropolitan Council | Kirklees]]
| Kirklees || [[Vine Street]] || [[PFI]] || Operational || 127 || [[EfW]] || [[Suez]] operated site primarily for [[Kirklees Metropolitan Council | Kirklees]]
|-
| Colnbrook || [[Lakeside]] || [[PPP]] || Operational || 436 || [[EfW]] || [[Viridor]] and [[Grundon]] Joint Venture which will require moving to accommodate Heathrow 3rd runway
|-
|-
| Leeds || [[Cross Green]] || [[PFI]] || Operational || 165 || [[EfW]] || Site developed by [[Veolia]] on behalf of [[Leeds City Council]] under a 25 year contract to 2037
| Leeds || [[Cross Green]] || [[PFI]] || Operational || 165 || [[EfW]] || Site developed by [[Veolia]] on behalf of [[Leeds City Council]] under a 25 year contract to 2037
|-
|-
| Leicstershire  || [[Mowmacre Hill]] || [[PFI]] || Operational || 120 || [[MBT]]<ref> The technology utilized under the contract is the only one in the UK and is known as a 'Ball Mill'</ref>  || Integrated contract delivered by [[Biffa]] for [[Leicester City Council]] for 25 years from 2002
| Leicstershire  || [[Mowmacre Hill]] || [[PFI]] || Operational || 120 || [[MBT]]<ref> The technology utilized under the contract is the only one in the UK and is known as a 'Ball Mill'</ref>  || Integrated contract delivered by [[Biffa]] for [[Leicester City Council]] for 25 years from 2002
|-
| Leicstershire  || [[Cotesbach]] || [[PPP]] || Operational || 50 || [[MBT]] || Operational plant by New Earth Solutions bought out of administration by [[PandaGreen]],currently services [[Leicestershire County Council]]
|-
| Lincolnshire || [[North Hykeham]] || [[PPP]] || Operational || 154 || [[EfW]] || [[FCC]] facility primarily for [[Lincolnshire County Council]] under 25 year contract
|-
|-
| L.B. Southwark ||[[Old Kent Road]]  || [[PFI]] || Operational || 100 || [[MBT]]<ref> Integrated site includes a [[Gasification]] facility which is in extended commissioning </ref>|| [[Suez]] integrated facility servicing [[Southwark London Borough Council | Southwark]]
| L.B. Southwark ||[[Old Kent Road]]  || [[PFI]] || Operational || 100 || [[MBT]]<ref> Integrated site includes a [[Gasification]] facility which is in extended commissioning </ref>|| [[Suez]] integrated facility servicing [[Southwark London Borough Council | Southwark]]
|-
| Merseyside || [[Wilton]] || [[PPP]] || Operational<ref name="op" /> || 440 || [[EfW]] || [[Suez]] site in Teeside, waste hauled by rail from Merseyside transfer station under contract with [[Merseyside Waste Disposal Authority | MWDA]]
|-
| Milton Keynes || [[Wolverton]] || [[PPP]] || In Construction <ref> Reported in mid 2018 as operational ([https://www.letsrecycle.com/news/latest-news/amey-overcomes-teething-problems-in-milton-keynes/ Letsrecycle article dated July 2018]), the [[Gasification]] facility had extended commissioning issues</ref> || 80 || [[EfW]] || Integrated facility delivered by [[Amey]] primarily for [[Milton Keynes Council]] for 15 years from 2013
|-
| NE Lincolnshire || [[Stallingborough]] || [[PPP]] ||Operational  ||53  || [[EfW]] || [[Newlincs]] facility for [[North East Lincolnshire Council | North East Lincolnshire]] under 25 year contract
|-
| Newcastle || [[Byker/Ellington]] || [[PPP]] || Operational || 187 || [[MBT]] || [[Suez]] facility serving primarily [[Newcastle upon Tyne City Council | Newcastle]]
|-
| North London || [[Edmonton]] || [[PPP]] || Operational || 512 || [[EfW]] || [[North London Waste Disposal Authority | NLWA]] site, currently going through planning process to be replaced as at end of life
|-
| North Somerset || [[BOOMECO Avonmouth]] || [[PPP]] || Operational || 50 || [[MBT]] || [[Boomecho]] bought by [[Veolia]] out of administration, serviced [[North Somerset Council]] but based in Avonmouth Docks, [[RDF]] export focused
|-
| North Yorkshire || [[Allerton]] || [[PPP]] || Operational<ref name="op" /> || 320 || [[EfW]] || [[Amey]]<ref> [[Amey]] is partnered with [[Equitix]] and [[Pensions Infrastructure Platform]] [https://www.letsrecycle.com/news/latest-news/ameys-allerton-efw-declared-fully-operational/ (Letsrecycle article dated March 2018)]</ref> facility servicing [[North Yorkshire County Council | North Yorkshire]] and [[York City Council | York]], moved into its 25 year operating phase in March '18
|-
| Nottingham || [[Eastcroft 3rd Line]] || [[PPP]] || Consented || 140 || [[EfW]] || [[FCC]] facility delivering shared capacity between [[FCC]], [[Nottingham City Council]] and [[Nottinghamshire County Council | Nottinghamshire]]
|-
| Nottingham || [[Eastcroft]] || [[PPP]] || Operational || 158 || [[EfW]] || [[FCC]] facility delivering shared capacity between [[FCC]], [[Nottingham City Council]] and [[Nottinghamshire County Council | Nottinghamshire]]
|-
| Oxfordshire || [[Ardley]] || [[PPP]] || Operational || 300 || [[EfW]] || [[Viridor]] facility servicing primarily [[Oxfordshire County Council | Oxfordshire]] under a 25 year contract from March 2011
|-
| Peterborough || [[Fourth Drove, Fengate]] || [[PPP]] || Operational || 85 || [[EfW]] || [[Viridor]] facility serving [[Peterborough City Council]] under a 30 year contract
|-
| Portsmouth || [[Portsmouth Project Integra]] || [[PPP]] || Operational || 198 || [[EfW]] || [[Veolia]] site for [[Hampshire County Council]] and partners under [[Project Integra]]
|-
| Rugby || [[Malpass Farm]] || [[PPP]] || Operational || 200 || [[MBT]] || [[Suez]] facility producing [[SRF]], to supply [[Cemex]] cement kiln in Rugby, also receiving tonnage previously designated to Birmingham facility
|-
| Sheffield || [[Bernard Road]] || [[PPP]] || Operational || 207 || [[EfW]] || Was part of wider 35 year contract with [[Veolia]] to 2036, now [[EfW]] contract only with termination of wider contract in 2017
|-
|-
| Shropshire || [[Battlefield Enterprise Park]] || [[PFI]] || Operational || 90 || [[EfW]] || Site developed by [[Veolia]] as part of a 25 year contract with [[Shropshire Council | Shropshire]]
| Shropshire || [[Battlefield Enterprise Park]] || [[PFI]] || Operational || 90 || [[EfW]] || Site developed by [[Veolia]] as part of a 25 year contract with [[Shropshire Council | Shropshire]]
|-
| S.E. London || [[SELCHP]] || [[PPP]] || Operational || 431 || [[EfW]] || [[Veolia]] site taking waste from [[Lewisham London Borough Council | Lewisham]], [[Greenwich London Borough Council | Greenwich]], [[Westminster City Council | Westminster]] and [[Bromley London Borough Council | Bromley]]
|-
| S. London || [[Beddington Lane]]|| [[PPP]] || Operational<ref name="op" /> ||300 || [[EfW]] || [[Viridor]] facility primarily serving [[Croydon London Borough Council | Croydon]], [[Kingston upon Thames London Borough Council| Kingston]], [[Merton London Borough Council | Merton]], [[Richmond upon Thames London Borough Council | Richmond]] and [[Sutton London Borough Council | Sutton]]
|-
|-
| South Tyne & Wear || [[Teeside Lines 4&5]] || [[PFI]] || Operational || 256 || [[EfW]] || [[Suez]] facility<ref> This site comprises a number of facilities in the same general area</ref> serving [[Stockton-on-Tees Borough Council | Stockton]], [[Middlesbrough Council | Middlesbrough]], [[Redcar and Cleveland Borough Council | Redcar & Cleveland]] and [[Northumberland Council |Northumberland]] and the [[South Tyne & Wear Partnership]]
| South Tyne & Wear || [[Teeside Lines 4&5]] || [[PFI]] || Operational || 256 || [[EfW]] || [[Suez]] facility<ref> This site comprises a number of facilities in the same general area</ref> serving [[Stockton-on-Tees Borough Council | Stockton]], [[Middlesbrough Council | Middlesbrough]], [[Redcar and Cleveland Borough Council | Redcar & Cleveland]] and [[Northumberland Council |Northumberland]] and the [[South Tyne & Wear Partnership]]
Line 127: Line 50:
|-
|-
| South Yorkshire || [[Bolton Road, Manvers]] || [[PFI]] ||Operational || 286 || [[MBT]] || [[Renewi]] partnership with [[SSE]] delivering integrated [[MBT]] and [[AD]] facility to [[Barnsley, Doncaster and Rotherham Waste Partnership]] to 2040
| South Yorkshire || [[Bolton Road, Manvers]] || [[PFI]] ||Operational || 286 || [[MBT]] || [[Renewi]] partnership with [[SSE]] delivering integrated [[MBT]] and [[AD]] facility to [[Barnsley, Doncaster and Rotherham Waste Partnership]] to 2040
|-
| Southampton || [[Marchwood Project Integra]] || [[PPP]] || Operational || 198 || [[EfW]] || [[Veolia]] site for [[Hampshire County Council]] and partners under [[Project Integra]]
|-
|-
| Staffordshire || [[Four Ashes]] || [[PFI]] || Operational || 325 || [[EfW]] || [[Veolia]] operated site for [[Staffordshire County Council]], 25 year contract from July 2010, with inputs also from [[Sandwell Metropolitan Borough Council | Sandwell]], [[Warwickshire County Council | Warkwickshire]] and [[Walsall Metropolitan Borough Council | Walsall]]
| Staffordshire || [[Four Ashes]] || [[PFI]] || Operational || 325 || [[EfW]] || [[Veolia]] operated site for [[Staffordshire County Council]], 25 year contract from July 2010, with inputs also from [[Sandwell Metropolitan Borough Council | Sandwell]], [[Warwickshire County Council | Warkwickshire]] and [[Walsall Metropolitan Borough Council | Walsall]]
|-
| Stoke on Trent || [[Campbell Road]] || [[PPP]] || Operational || 174 || [[EfW]] || Operated by [[MES Environmental]]
|-
|-
| Suffolk || [[Great Blakenham]] || [[PFI]]<ref> Discussions within Suffolk around re-financing reported in 2018 [https://www.letsrecycle.com/news/latest-news/suffolk-refinancing-great-blakenham-efw/ (Letsrecycle article November 2018]</ref> || Operational || 269 || [[EfW]] || [[Suez]] facility delivered primarily for [[Suffolk County Council | Suffolk]] under 25 year contract, with later deal for cross-border tonnage from [[Norfolk County Council | Norfolk]]
| Suffolk || [[Great Blakenham]] || [[PFI]]<ref> Discussions within Suffolk around re-financing reported in 2018 [https://www.letsrecycle.com/news/latest-news/suffolk-refinancing-great-blakenham-efw/ (Letsrecycle article November 2018]</ref> || Operational || 269 || [[EfW]] || [[Suez]] facility delivered primarily for [[Suffolk County Council | Suffolk]] under 25 year contract, with later deal for cross-border tonnage from [[Norfolk County Council | Norfolk]]
|-
|-
| Surrey || [[Charlton Lane Eco Park]] || [[PFI]] || In Construction || 60 || [[EfW]] || [[Suez]] integrated [[AD]] and [[Gasification]] facility for [[Surrey County Council | Surrey]] has had delays in commissioning the latter, now forecast Q1 2020  
| Surrey || [[Charlton Lane Eco Park]] || [[PFI]] || In Construction || 60 || [[EfW]] || [[Suez]] integrated [[AD]] and [[Gasification]] facility for [[Surrey County Council | Surrey]] has had delays in commissioning the latter, now forecast Q1 2020  
|-
| Swindon || [[Chaney Manor]] || [[PPP]] || Operational || 48 || [[MBT]]<ref>The technology is better described as mechanical sorting or a [[Dirty MRF]] with no biological treatment as part of the process</ref> || [[Swindon Commercial Services]] facility for [[Swindon Borough Council | Swindon]]
|-
|-
| Wakefield || [[South Kirby]] || [[PFI]] || Operational || 146 || [[MBT]] || [[Renewi]] integrated contract for [[Wakefield City Council]]
| Wakefield || [[South Kirby]] || [[PFI]] || Operational || 146 || [[MBT]] || [[Renewi]] integrated contract for [[Wakefield City Council]]
|-
| West London || [[Severnside Avonmouth]] || [[PPP]] || Operational || 350 || [[EfW]] || [[Suez]] site in Avonmouth, supplied by train from a transfer in West London for [[West London Waste Disposal Authority | WLWA]], plus some local waste including [[West of England Partnership | West of England]]
|-
| West Sussex || [[Brookhurst Wood]] || [[PPP]] || In Construction || 327 || [[MBT]] || [[Biffa]] facility delivered for [[West Sussex County Council | West Sussex]]
|-
| Western Riverside || [[Belvedere]] || [[PPP]] || Operational || 688 || [[EfW]] || [[Cory]] site in Bexley, supplied by river from two transfer stations for [[Western Riverside Waste Disposal Authority | WRWA]], plus some local tonnage for [[Bexley London Borough Council | Bexely]]
|-
| Whites Pit, Poole || [[Canford]] || [[PPP]] || Operational || 50 || [[MBT]] || Operational plant by New Earth Solutions bought out of administration by [[PandaGreen]],currently primarily services [[Bournemouth, Christchurch and Poole |Bournemouth ]]
|-
| Wiltshire || [[Northacre Farm]] || [[PPP]] || Operational || 60 || [[MBT]] || [[Hills]] site at Westbury servicing [[Wiltshire Council]]
|-
| Wolverhampton || [[Crown Street EFW]] || [[PPP]] || Operational || 108 || [[EfW]] || Operated by [[MES Environmental]]
|}
|}
==References==
==References==
<references />
<references />

Revision as of 18:38, 23 January 2020

In its desire to stimulate investment in waste infrastructure, and underpin the diversion of BMW waste from Landfill, the Government supported/subsidized a range of treatment technologies on a number of sites that were procured by Waste Disposal Authorities needing this infrastructure through a dedicated long term Private Finance Initiative (PFI). This arrangement has now ceased, several schemes which were to have been funded had their funding removed after DEFRA assessed [1] that the BMW targets could be met with the infrastructure funded to that date, and several are currently being considered by Waste Disposal Authorities for movement out of PFI after consideration of the cost benefit of continuing with the contract and several that have been removed (i.e. Lancashire) or have had closed with major restructure (i.e. Sheffield and Greater Manchester).

The table below is an extract from DEFRA data [2] summarizing the residual waste projects that are/were PFI and PPP projects with additional commentary/notes added:

Location Project/Site Classification Status Capacity [3] (ktpa) Plant Type Comment
Bolton Raikes Lane PFI Operational 86 EfW Viridor Laing consortium GMWA contract terminated 2017, now Suez from June 2019 for 7 years
Cambridgeshire Waterbeach PFI Operational[4] 200 MBT Amey Cespa site with variable performance reported, planning being pursued for new EfW on the site
Cornwall St. Dennis PFI Operational 240 EfW Suez site (Cornwall Energy Recovery) part of an integrated contract with Cornwall to 2039
ELWA 1 Frog Island PFI Operational 180 MBT Renewi site servicing ELWA, recently reported financial difficulty
ELWA 2 Jenkins Lane PFI Operational 180 MBT Renewi site servicing ELWA, recently reported financial difficulty
East Sussex Newhaven PFI Operational 234 EfW Servicing East Sussex County Council and Brighton and Hove City Council
Essex Courtauld Road PFI Operational[4] 417 MBT Developed and operated by partners Urbaser Balfour Beatty servicing Essex County Council and Southend, reported operational difficulties
Greater Manchester Longley Lane PFI Operational 110 MBT Viridor Laing consortium PFI contract with GMWA terminated 2017, now Suez from June 2019 for 7 years
Greater Manchester Runcorn Phase 1 PFI Operational 325 EfW Viridor bought out Laing in Nov 2018 and continues to operate under contract with GMWA to 2035[5]
Greater Manchester N. Manchester PFI Operational 65 MBT Viridor Laing consortium PFI contract with GMWA terminated 2017, now Suez from June 2019 for 7 years
Greater Manchester Oldham PFI Operational 99 MBT Viridor Laing consortium PFI contract with GMWA terminated 2017, now Suez from June 2019 for 7 years
Greater Manchester Salford PFI Operational 73 MBT Viridor Laing consortium PFI contract with GMWA terminated 2017, now Suez from June 2019 for 7 years
Greater Manchester Stockport PFI Operational 92 MBT Viridor Laing consortium PFI contract with GMWA terminated 2017, now Suez from June 2019 for 7 years
Kirklees Vine Street PFI Operational 127 EfW Suez operated site primarily for Kirklees
Leeds Cross Green PFI Operational 165 EfW Site developed by Veolia on behalf of Leeds City Council under a 25 year contract to 2037
Leicstershire Mowmacre Hill PFI Operational 120 MBT[6] Integrated contract delivered by Biffa for Leicester City Council for 25 years from 2002
L.B. Southwark Old Kent Road PFI Operational 100 MBT[7] Suez integrated facility servicing Southwark
Shropshire Battlefield Enterprise Park PFI Operational 90 EfW Site developed by Veolia as part of a 25 year contract with Shropshire
South Tyne & Wear Teeside Lines 4&5 PFI Operational 256 EfW Suez facility[8] serving Stockton, Middlesbrough, Redcar & Cleveland and Northumberland and the South Tyne & Wear Partnership
South Devon Devonport PFI Operational 245 EfW MVV Umwelt facility serving South West Devon Waste Partnership under a 25 year contract
South Yorkshire Bolton Road, Manvers PFI Operational 286 MBT Renewi partnership with SSE delivering integrated MBT and AD facility to Barnsley, Doncaster and Rotherham Waste Partnership to 2040
Staffordshire Four Ashes PFI Operational 325 EfW Veolia operated site for Staffordshire County Council, 25 year contract from July 2010, with inputs also from Sandwell, Warkwickshire and Walsall
Suffolk Great Blakenham PFI[9] Operational 269 EfW Suez facility delivered primarily for Suffolk under 25 year contract, with later deal for cross-border tonnage from Norfolk
Surrey Charlton Lane Eco Park PFI In Construction 60 EfW Suez integrated AD and Gasification facility for Surrey has had delays in commissioning the latter, now forecast Q1 2020
Wakefield South Kirby PFI Operational 146 MBT Renewi integrated contract for Wakefield City Council

References

  1. DEFRA Waste Infrastructure Delivery Programme
  2. DEFRA Residual Waste Treatment Infrastructure Project List dated 31st December 2016 but noted as last updated 29th March 2019 (edited with press updates)
  3. The capacity has been reproduced from the DEFRA data, but has not been verified in this table, and in some cases is known not to be up to date
  4. 4.0 4.1 In original data site was listed as In Construction this has been changed to Operational.
  5. As part of the restructuring of the PFI contract, with option to extend
  6. The technology utilized under the contract is the only one in the UK and is known as a 'Ball Mill'
  7. Integrated site includes a Gasification facility which is in extended commissioning
  8. This site comprises a number of facilities in the same general area
  9. Discussions within Suffolk around re-financing reported in 2018 (Letsrecycle article November 2018