Milton Keynes Waste Recovery Park: Difference between revisions

From Wikiwaste
Northern Chick (talk | contribs)
Northern Chick (talk | contribs)
m →‎Plant: typo closure of parenthses
Line 10: Line 10:


==Plant==
==Plant==
A Design, Build, Operate contract with [[AmeyCespa]] (with [[Volker Fitzpatrick]] as Amey's civil engineering partner) which started in Spring 2014 and which was commissioned in summer 2018. The [[Gasification]] technology was delivered by [[Energos]], and [[AmeyCespa]] had to step in when the technology company went into liquidation in 2016 (which also impacted upon the [[Glasgow Renewable Energy and Recycling Centre (ACT)|Glasgow]] and [[Sinfin Lane]] facilities.
A Design, Build, Operate contract with [[AmeyCespa]] (with [[Volker Fitzpatrick]] as Amey's civil engineering partner) which started in Spring 2014 and which was commissioned in summer 2018. The [[Gasification]] technology was delivered by [[Energos]], and [[AmeyCespa]] had to step in when the technology company went into liquidation in 2016 (which also impacted upon the [[Glasgow Renewable Energy and Recycling Centre (ACT)|Glasgow]] and [[Sinfin Lane]] facilities).


==Local Authority Users==
==Local Authority Users==

Revision as of 15:14, 11 February 2020

Amey Cespa Milton Keynes Waste Recovery Park
Amey Cespa Milton Keynes Waste Recovery Park


Error: no local variable "site" has been set.
Error: no local variable "status" has been set.
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence Error: no local variable "epr" has been set.
Operator [[Error: no local variable "operator" has been set.]]
Region [[:Category:Error: no local variable "region" has been set.|Error: no local variable "region" has been set.]]
Operational Capacity Error: no local variable "cap" has been set.ktpa
Is site R1? Error: no local variable "r1" has been set.
When was R1 Granted? Error: no local variable "r1date" has been set.
What was the R1 value Error: no local variable "r1value" has been set.
Electrical Capacity Error: no local variable "mwe" has been set.MWe
Number of Lines Error: no local variable "line" has been set.
Number of Turbines Error: no local variable "turbine" has been set.
CHP Error: no local variable "chp" has been set.
Technology Approach Error: no local variable "techtype" has been set.
Funding Type [[Error: no local variable "funding" has been set.]]

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total
2016 0.00 0.00 0.00 0.00 0.00
2017 0.00 0.00 0.00 0.00 0.00
2018 71493.20 203.80 0.00 0.00 75340.46
2019 112486.00 0.00 0.00 0.00 115863.00
2020 117088.00 0.00 0.00 0.00 120404.00
2021 113573.00 0.00 0.00 0.00 116609.00
2022 108124.00 0.00 0.00 0.00 111969.00


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN
2016 0.00 0.00% 0.00 0.00%
2017 0.00 0.00% 0.00 0.00%
2018 4387.64 5.82% 1523.67 2.02%
2019 12760.00 11.01% 3131.00 2.70%
2020 11044.00 9.17% 3412.00 2.83%
2021 10900.00 9.35% 2886.00 2.47%
2022 11473.00 10.25% 3062.00 2.73%

Summary

An integrated EfW facility with other treatment technologies, with the EfW based upon Gasification technology and not yet considered an ERF based on not having R1 status. The EfW element of the facility at Milton Keynes has permitted operational capacity of 90,000 tonnes per annum, operated by AmeyCespa and owned by Milton Keynes Council.

History

The Milton Keynes facility was built as an integrated solution primarily to service a 15 year PPP contract with Milton Keynes Council signed in June 2013 to process around 130,000 tonnes per annum via the different technologies on site . The facility diverts around 140,000 tonnes per annum from Landfill via a combination of Mechanical Biological Treatment including Anaerobic Digestion, with the RDF output sent to the ATT/Gasification facility with a capacity listed of 90,000 tonnes per annum and power output of 6MWe [1].

Plant

A Design, Build, Operate contract with AmeyCespa (with Volker Fitzpatrick as Amey's civil engineering partner) which started in Spring 2014 and which was commissioned in summer 2018. The Gasification technology was delivered by Energos, and AmeyCespa had to step in when the technology company went into liquidation in 2016 (which also impacted upon the Glasgow and Sinfin Lane facilities).

Local Authority Users

References