Isle of Wight Waste Recovery Park: Difference between revisions
(add page specific text) |
(→Summary: typo) |
||
Line 3: | Line 3: | ||
==Summary== | ==Summary== | ||
An integrated [[EfW]] facility with other treatment technologies at the Isle of Wight site in Newport, the original plan was to retrofit the old [[EfW]] facility with new [[Gasification]] technology. After complications with the retrofit process the technology was changed in 2017 to a conventional combustion process technology. The [[EfW]] element of | An integrated [[EfW]] facility with other treatment technologies at the Isle of Wight site in Newport, the original plan was to retrofit the old [[EfW]] facility with new [[Gasification]] technology. After complications with the retrofit process the technology was changed in 2017 to a conventional combustion process technology. The [[EfW]] element of the Isle of Wight facility has a permitted operational capacity of 44,000 tonnes per annum, and has been developed, and will be operated by, [[AmeyCespa]] under its long term [[PPP]] contract with the [[Isle of Wight]]. | ||
==Technology== | ==Technology== |