Isle of Wight Waste Recovery Park: Difference between revisions

(add page specific text)
(→‎Summary: typo)
Line 3: Line 3:


==Summary==
==Summary==
An integrated [[EfW]] facility with other treatment technologies at the Isle of Wight site in Newport, the original plan was to retrofit the old [[EfW]] facility with new [[Gasification]] technology. After complications with the retrofit process the technology was changed in 2017 to a conventional combustion process technology. The [[EfW]] element of the facility at the Isle of Wight has permitted operational capacity of 44,000 tonnes per annum, and has been developed, and will be operated by, [[AmeyCespa]] under its long term [[PPP]] contract with the [[Isle of Wight]].  
An integrated [[EfW]] facility with other treatment technologies at the Isle of Wight site in Newport, the original plan was to retrofit the old [[EfW]] facility with new [[Gasification]] technology. After complications with the retrofit process the technology was changed in 2017 to a conventional combustion process technology. The [[EfW]] element of the Isle of Wight facility has a permitted operational capacity of 44,000 tonnes per annum, and has been developed, and will be operated by, [[AmeyCespa]] under its long term [[PPP]] contract with the [[Isle of Wight]].


==Technology==
==Technology==