Troon: Difference between revisions

m (add picture and link)
Line 11: Line 11:
A [[Biomass Waste EFW]] facility based on c. 25,000 tonnes per annum of [[Wood Waste]] generating 2.5MWe to the grid (or 2.33MWe and 10.9MWth)<ref>[https://www.woodbizforum.com/glennon-brothers-installs-a-new-biomass-cogeneration-plant-at-its-sawmill-in-the-uk/ Wood Business Forum Website]</ref>.  
A [[Biomass Waste EFW]] facility based on c. 25,000 tonnes per annum of [[Wood Waste]] generating 2.5MWe to the grid (or 2.33MWe and 10.9MWth)<ref>[https://www.woodbizforum.com/glennon-brothers-installs-a-new-biomass-cogeneration-plant-at-its-sawmill-in-the-uk/ Wood Business Forum Website]</ref>.  


The Troon site was developed by [[Glennon Brothers Ltd]] to process residues from their adjacent sawmill, one of the largest in the UK, and provide heat to dry processed wood and has been operating since 2017. It is located in Troon harbour, at the old Adam Wilson & Sons Sawmill.
The Troon site was developed by [[Glennon Brothers Ltd]] to process residues from their adjacent sawmill, one of the largest in the UK, and provides heat to dry processed wood and has been operating since 2017. It is located in Troon harbour, at the old Adam Wilson & Sons Sawmill.


==Plant==
==Plant==