Welland Bio Power: Difference between revisions

Line 22: Line 22:


==Plant==
==Plant==
The facility utilises is Nexterra’s fixed-bed updraft gasification system techology, which is an [[Advanced Conversion Technology]]. MWH Treatment provided EPC services for the project<ref name="ref2" >Nexterra, 2015. [http://www.nexterra.ca/files/pdf/20150409-NexterraWelland.pdf Nexterra Consortium Reaches Financial Close On Biomass Gasification Plant In Northamptonshire, UK. Online. Nexterra.ca. [Accessed 3 April 2020].]</ref>.  
The facility utilises Nexterra’s fixed-bed updraft gasification system techology, which is an [[Advanced Conversion Technology]]. MWH Treatment provided EPC services for the project<ref name="ref2" >Nexterra, 2015. [http://www.nexterra.ca/files/pdf/20150409-NexterraWelland.pdf Nexterra Consortium Reaches Financial Close On Biomass Gasification Plant In Northamptonshire, UK. Online. Nexterra.ca. [Accessed 3 April 2020].]</ref>.  


The facility cost £51.6 million to develop and was financed by Balfour Beatty Investments, NOY Nexterra Holdings Limited Partnership (a partnership between NOY Infrastructure Fund and Nexterra) and Equitix MA Infrastructure Fund<ref name="ref2" />.
The facility cost £51.6 million to develop and was financed by Balfour Beatty Investments, NOY Nexterra Holdings Limited Partnership (a partnership between NOY Infrastructure Fund and Nexterra) and Equitix MA Infrastructure Fund<ref name="ref2" />.