Cauldon Cement Kiln: Difference between revisions
(add page specific text) |
m (minor text changes) |
||
Line 11: | Line 11: | ||
* 2001 to 2013 Lafarge | * 2001 to 2013 Lafarge | ||
* 2013 to 2015 Lafarge Tarmac | * 2013 to 2015 Lafarge Tarmac | ||
* 2015 to Present LafargeHolcim | * 2015 to Present LafargeHolcim (Lafarge Cement is part of Aggregate Industries, which itself is owned by LafargeHolcim) | ||
==The Process at Cauldon== | ==The Process at Cauldon== | ||
Line 17: | Line 17: | ||
==Raw Materials== | ==Raw Materials== | ||
The primary raw materials are Carboniferous Limestone from Cauldon Low Quarry and Carboniferous Shale in a nearby deposit. | The primary raw materials are Carboniferous Limestone from Cauldon Low Quarry to the south of the site and Carboniferous Shale in a nearby deposit to the north and west of the plant. | ||
==Waste Used on Site== | ==Waste Used on Site== |