Troon: Difference between revisions

m (minor text changes)
m (add page specific text)
Line 12: Line 12:
The project was delivered by [[URBAS Energietechnik]], using their combustion grate technology<ref>[https://www.urbas.at/en/projects/glennon-brothers-ltd/ URBAS Website]</ref> at a reported capital cost of £14m<ref>[http://glennonbrothers.ie/press/Cabinet_Minister_Ewing_visits_Troon_2017.html Glennon Brothers Website]</ref>.
The project was delivered by [[URBAS Energietechnik]], using their combustion grate technology<ref>[https://www.urbas.at/en/projects/glennon-brothers-ltd/ URBAS Website]</ref> at a reported capital cost of £14m<ref>[http://glennonbrothers.ie/press/Cabinet_Minister_Ewing_visits_Troon_2017.html Glennon Brothers Website]</ref>.


==Local Authority Users==
==Tonnage Input/Fuel==
The plant utilizes [[Wood Waste]] from an adjacent sawmill, and receives no local authority wood.  
The tonnage processed by the plant is a mixture of [[Wood Waste]] off-cuts from its adjacent sawmill and is essentially 'internal' material that is neither reported in the most recent [[Annual Sustainability Report]] for 2018-19<ref>[https://www.ofgem.gov.uk/publications-and-updates/biomass-sustainability-dataset-2018-19 Biomass Sustainability Dataset 2018-19]</ref> by [[Ofgem]] or the [[EA]] data for the calendar year (i.e. January 2018 to December 2018).


==References==
==References==
<references />
<references />