Dimmer Landfill Site: Difference between revisions

Line 24: Line 24:


==Engineering and Environmental Control==
==Engineering and Environmental Control==
The landfill is constructed as a [[Landfill|Containment Facility]], utilizing the underlying clay materials as the principal barrier. The landfill lining system is augmented with a flexible membrane liner of High Density Polyethylene (HDPE) on the base.  As the site is a land-raise rather than a landfill, there are no sidewall barriers. In cross-section the site is lense-shaped: the base is an approximate mirror of the upper surface
The landfill is constructed as a [[Landfill|Containment Facility]], utilizing the underlying clay materials as the principal barrier. In the most recently constructed parts of the site, the landfill lining system is augmented with a flexible membrane liner of High Density Polyethylene (HDPE) on the base.  As the site is a land-raise rather than a landfill, there are no sidewall barriers. In cross-section the site is lense-shaped: the base is an approximate mirror of the upper surface


There is Landfill Gas power generation with electricity export to the National Grid. Installed capacity is 2.96MW <ref>Ofgem Summary of Installed Capacity</ref>
There is Landfill Gas power generation with electricity export to the National Grid. Installed capacity is 2.96MW <ref>Ofgem Summary of Installed Capacity</ref>