Landfill Directive: Difference between revisions
m (add new link) |
mNo edit summary |
||
Line 38: | Line 38: | ||
==Permitting Requirements== | ==Permitting Requirements== | ||
The Directive sets up a system of operating permits for landfill sites. The most recent guidance<ref>https://www.gov.uk/government/publications/understanding-the-landfill-directive-lfd-1 Understanding the Landfill Directive</ref> is published by the [[EA]] and referred to by the other regulatory bodies in the UK. Applications for permits must contain the following information: | The Directive sets up a system of operating permits for landfill sites. The most recent guidance<ref>[https://www.gov.uk/government/publications/understanding-the-landfill-directive-lfd-1] LFD Understanding the Landfill Directive</ref> is published by the [[EA]] and referred to by the other regulatory bodies in the UK. Applications for permits must contain the following information: | ||
* The identity of the applicant (and operator) | * The identity of the applicant (and operator) | ||
* A description of the waste types and total quantity to be deposited; | * A description of the waste types and total quantity to be deposited; |