Design Build Finance Operate: Difference between revisions

(add page specific text)
 
Line 8: Line 8:
{| class="wikitable"
{| class="wikitable"
|-
|-
!colspan=4|Eelements!!Arrangements/Description
!colspan=4|Elements!!Arrangements/Description
|-
|-
| Design || Build || Operate || Finance || '''Separate Elements'''. The waste authority contracts separately for the works and services needed, and provides funding by raising capital for each of the main contracts. The contract to build the facility would be based on the authority’s design and specification and the auhority would own the facility once constructed.  
| Design || Build || Operate || Finance || '''Separate Elements'''. The waste authority contracts separately for the works and services needed, and provides funding by raising capital for each of the main contracts. The contract to build the facility would be based on the authority’s design and specification and the auhority would own the facility once constructed.